Forwards Notice of Withdrawal of 951121 Application for License NPF-49 for Plant,Unit 3.Proposed Change Would Have Modified Facility TSs Pertaining to TS Section 1.33 & Bases Section 3/4.3.3.9,3/4.3.3.10 & 3/4.11.2.1
ML20236V411
Person / Time
Site: Millstone 
Issue date: 07/30/1998
From: Andersen J
NRC (Affiliation Not Assigned)
To: Bowling M, Loftus P
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20236V412 List:
References
TAC-M94156, NUDOCS 9808030165
Download: ML20236V411 (2)


Text

Mr. Mutin L. Bowling, Jr.

July 30, 1998 R:cov:ry Officer - Tcchnical S:tvices North::st Nuclear Encrgy Company c/o Ms. Patricia A. Loftus Director - Regulatory Affairs P. O. Box 128 Waterford, Connecticut 06365

SUBJECT:

MILLSTONE NUCLEAR POWER STATION, UNIT NO. 3 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NO. M94156)

Dear Mc. Bowling:

By letter dated November 21,1995, Northeast Nuclear Energy Company (NNECO) applied for an amendment to the Millstone Nuclear Power Station, Unit 3, Facility Operating License No.

NPF-49. The proposed change would have modified the facility Technical Specifications (TSs) pertaining to TS Section 1,33 and Bases Sections 3/4.3.3.9,3/4.3.3.10, and 3/4.11.2.1. The change would have clarified the definition cf source check to include a source check from a light emitting diode, as well as from ionizing radiation. Subsequently, NNECO determined that it would not pursue this issue; and, during a meeting on July 7,1998, between members of the Millstone Unit 3 licensing staff and myself, NNECO explained that it planned to withdraw the amendment.

By [[letter::B17355, Informs Staff of Change in End Date for First 10 Year ISI Interval & Change in Starting Date for Second 10 Year ISI Interval.End of First 10 Year ISI Will Be Extended to Oct 1999 & Beginning of Second 10 Year ISI Will Begin Apr 1999|letter dated July 14,1998]], I informed you that the NRC would consider the proposed amendment to be withdrawn unless you notify the NRC by July 29,1998, that the NRC's understanding was incorrect. Since the allotted time has passed and you have not responded, j

we consider the amendment request withdrawn.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely, l signed by:

Origma James W. Andersen, Project Manager l

Special Projects Office - Licensing Office of Nuclear Reactor Regulation Docket No. 50-423 i

Enclosure:

Notice of Withdrawal 4

cc w/ encl: See next page

[//,

DISTRIBUTION:

JDurr, RI (Duishet File?

WTravers y? y g

PUBLIC PMcKee 7;r

~

SPO-L Reading JAndersen I

SPO Reading LBerry OGC ACRS DOCUMENT NAME: G:\\ANDERSEN\\M94156.LTR To receive a copy of this document indicate in bos:

'C' = Copy wie enci

  • E" = Cggy v/)nd "N"=

No copy OFFICE SPO-L:PM,/

SPO-L:LA W! O SPM$D l

NAME JAndersen $

l. Berry _ dl\\~

P$dked l

DATE 07/W /93 07/ Gi /98 \\

0-# "9

/98 9808030165 980730 tlCIAL RECORD COPY PDR ADOCK 03000423 L

P PDR

l perg

[

k UNITED STATES g

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2006H001

\\..... pd July 30, 1998 Mr. Martin L. Bowling, Jr.

Recovery Officer - Technical Services Northeast Nuclear Energy Company c/o Ms. Patricia A. Loftus i

Director - Regulatory Affairs P. O. Box 128 Waterford, Connecticut 06385

SUBJECT:

MILLSTONE NUCLEAR POWER STATION, UNIT NO. 3 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NO. M94156) l

Dear Mr. Bowling:

By letter dated November 21,1995, Northeast Nuclear Energy Company (NNECO) applied for an amendment to the Millstone Nuclear Power Station, Unit 3, Facility Operating License No.

NPF-49. The proposed change would have modified the facility Technical Specifications (TSs) pertaining to TS Section 1.33 and Bases Sections 3/4.3.3.9,3/4.3.3.10, and 3/4.11.2.1. The change would have clarified the definition of source check to include a source check from a light emitting diode, as well as from ionizing radiation. Subsequently, NNECO determined that it l

would not pursue this issue; and, during a meeting on July 7,1998, between members of the j

Millstone Unit 3 licensing staff and myself, NNECO explained that it planned to withdraw the amendment.

l l

By [[letter::B17355, Informs Staff of Change in End Date for First 10 Year ISI Interval & Change in Starting Date for Second 10 Year ISI Interval.End of First 10 Year ISI Will Be Extended to Oct 1999 & Beginning of Second 10 Year ISI Will Begin Apr 1999|letter dated July 14,1998]], I informed you that the NRC would consider the proposed l

amendment to be withdrawn unless you notify the NRC by July 29,1998, that the NRC's i

understanding was incorrect. Since the allotted time has passed and you have not responded, we consider the amendment request withdrawn.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely, I

' m'es W. Andersen, Projsd Manager a

Special Projects Office - Licendng Of0ce of Nuclear Reactor Regulation Docket No. 50-423

Enclosure:

Notice of Withdrawal cc w/ encl: See next page