Mr. M rtin L. Bowling, Jr.
July 14, 1998 Recovery Officer - Technical Strvices d.
Northeist Nucle:r Energy C:mpIny c/o Ms. Patricia A. Loftus Director-Regulatory Affairs P. O. Box 128 Waterford, Connecticut 06385
SUBJECT:
MILLSTONE NUCLEAR POWER STATION, UNIT NO. 3 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NO. M94156)
?
Dear Mr. Bowling:
By letter dated November 21,1995, Northeast Nuclear Energy Company (NNECO) applied for an amendment to the Millstone Nuclear Power Station, Unit 3, Facility Operating License No.
- NPF-49. The proposed change would have modified the facility technical specifications (TSs) pertaining to TSs Section 1.33 and Bases Sections 3/4.3.3.9,3/4.3.3.10, and 3/4.11.2.1. The change would have clarified the definition of source check to include a source check from a light emitting diode, as well as from ionizing radiation. Subsequently, NNECO determined that it would not pursue this issue; and, during a meeting on July 7,1998, between members of the
< Millstone Unit 3 licensing staff and myself, they explained that NNECO planned to withdraw the amendment.
~
Unless NNECO notifies us that we are incorrect within 15 days of the date of this letter, we will consider the application as withdrawn and will file a Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication and close this action.
Sincerely,
[
Original signed by:
s James W. Andersen, Project Manager
- Special Projects Office - Licensing
/
Office of Nuclear Reactor Regulation
/ g.
Docket No. 50-423 1,
DISTRIBUTION cc: See next page' M P:
OGC PUBLIC.
ACRS SPO-L Reading
..GHILL (2)
SPO Reading WBeckner, TSB WTravers JDurr, RI PMcKee DScrenci, RI
. (( C JAndersen
- , u.
LBerry L
[hb[fDN,,<E;D l am M' DOCUMENT NAME: G:WNDERSEN\\M94156.WTH
' ra h,..
.e mi.
m we w m. wm c cow withooi.et.cnm.nti.nawiliur. e - copy wiin set.chment/.ncio.ur.
m - No copy OFFICE SPO-L:PM. J SPO-L:LA l / (l/ SPC$l/DM NAME JAndersen X LBerry
)(} 7 PM W DATE-07/ y4 /98 07/ 4) /98 1-07/ F
/98 07/ /98 l:
OFFICIAL RECORD COPY 9907210288 990714 PDR ADOCK 05000423 P
PDR E
s
"'2 q
\\-
i
.p UNITED STATES l
g-NUCLEAR REGULATORY COMMISSION WAsHINeToN, D.c. asseHeM July 14, 1998 Mr. Martin L. Bowling, Jr.
' Recovery Officer - Technical Services -
Northeast Nuclear Energy Company -
clo Ms. Patricia A. Loftus Director-Regulatory Affairs -
- P. O. Box 128 Waterford, Connecticut 08385
SUBJECT:
MILLSTONE NUCLEAR POWER STATION, UNIT NO. 3 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NO. M94156)
Dear Mr. Bowling:
By letter dated November 21,1995, Northeast Nuclear Energy Company (NNECO) applied for an amendment to the Millstone Nuclear Power Station, Unit 3, Facility Operating License No.
NPF 49. The proposed change would have modified the facility technical specifications (TSs) pertaining to TSs Section 1.33 and Bases Sections 3/4.3.3.g,3/4.3.3.10, and 3/4.11.2.1. The change would have clarified the definition of source check to include a source check from a light emitting diode, as well as from lonizing radiation. Subsequently, NNECO determined that it would not pursue this issue; and, during a meeting on July 7,1998, between members of the Millstone Unit 3 licensing staff and myself, they explair'ed that NNECO planned to withdraw the amendment.
Unless NNECO notifies us that we are incorrect within 15 days of the date of this letter, we will consider the application as withdrawn and will file a Notice of Withdrawal of Applicauon (or Amendment to Facility Operating License with the Office of the Federal Register for publication and close this action.
Sincerely,
~
/C a
s W. Andersen, Project Manager Special Projects Office - Licensing Office of Nuclear Reactor Regulation l
Docket No. 50-423 cc: See next page
l
' Millstone Nucle:r Power St;ti:n l
Unit 3 cc:
Lillian M. Cuoco, Esquire Joseph R. Egan, Esquire Senior Nuclear Counsel.
Egan & Associates, P.C.
Northeast Utilities Service Company 2300 N Street, NW P. O. Box 270 Washington, DC 20037 Hartford, CT 06141-0270 Mr. F. C. Rothen j-Mr. Kevin T. A. McCarthy, Director Vice President -Work Services Monitoring and Radiation Divaion Northeast Utilities Service Corr.pany Department of Environmental Protection P. O. Box 128 79 Elm Street Waterford, CT 06385 l
Hartford, CT 06106-5127 l
Emest C. Hadley, Esquire Regional Administrator, Region I 1040 B Main Street U.S. Nuclear Regulatory Commission P.O. Box 549 l
475 Allendale Road West Wareham, MA 02576 l
King of Prussia, PA 19406 Mr. John Buckingham First Selectmen Department of Public Utility Control Town of Waterford Electric Unit Hall of Records 10 Liberty Square 200 Boston Post Road New Britain, CT 06051 Waterford, CT 06385 Mr. James S. Robinson, Manager Mr. Wayne D. Lanning Nuclear Investments and Administration Deputy Director of inspections New England Power Company Special Projects Office 25 Research Drive 475 Allendale Road Westborough, MA 01582 King of Prussia, PA 19406-1415 Mr. John Streeter Mr. M. H. Brothers Recovery Officer - Nuclear Oversight Vice President - Millstone Unit 3 Northeast Utilities Service Company
. Northeast Nuclear Energy Company P. O. Box 128 P.O. Box 128 Waterford, CT 06385 Waterford, CT 06385-Deborah Katz, President i
Mr. M. R. Scully, Executive Director Citizens Awareness Network Connechout Municipal Electric P.O. Box 83 Energy Cooperative Shelburne Falls, MA 03170 30 Stott Avenue Norwich,CT 06360 Mr. Allan Johanson, Assistant Director Office of Policy and Management i
l Mr. David Amerine -
Policy Development and Planning l
Vice President - Human Services Division Northeast Utilities Service Company 450 Capitol Avente - MS# 52ERN P. O. Box 128 P. O. Box 341441 Waterford, CT 06385 Hartford, CT 06134-1441 r
l
Millstone Nuclear Power Station Unit 3 -
cc:
The Honorable Terry Concannon Mr. William D. Meinert Nuclear Energy Advisory Council Nuclear Engineer Room 4035 Massachusetts MunicipalWholesale Legislative Office Building Electric Company Capitol Avenue P.O. Box 426 Hartford, CT 06106 Ludlow, MA 01056 Mr. Evan W. Woollacott Attomey Nicholas J. Scobbo, Jr.
Co-Chair Ferriter, Scobbo, Caruso, Rodophele, PC
' Nuclear Energy Advisory Council' 1 Beacon Street,11th Floor
'128 Terry's Plain Road Boston, MA 02108 Simsbury, CT 06070 Citizens Regulatory Commission
- Mr. John W. Beck, President ATTN:'Ms. Susan Perry Luxton Little Harbor Consultants, Inc.
180 Great Neck Road Millstone -ITPOP Project Office Waterford, CT 06385 P.O. Box 0630 Niantic, CT 06357-0630 Mr. B. D. Kenyon (Acting)
Chief Nuclear Officer-Millstone Northeast Nuclear Energy Company P.O. Box 128 -
Waterford, CT 06385 '
e Mr. Daniel L. Curry Project Director Parsons Power Group Inc.
2675 Morgantown Road
- Reading, PA 19607 Mr. Don Schopfer -
Verification Team Manager Sargent & Lundy 55 E. Monroe Street Chicago,IL 60603 Mr. P. D. Hinnenkamp Director-Unit 3 Northeast Nuclear Energy Company P.O. Box 128
)
' Waterford, CT 06385 Senior Resident inspector Millstone Nuclear Power Station j
c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357 a