ML20236V202
| ML20236V202 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 07/29/1998 |
| From: | Brockman K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mcgaha J ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20236V204 | List: |
| References | |
| 50-458-98-12, NUDOCS 9807310359 | |
| Download: ML20236V202 (5) | |
See also: IR 05000458/1998012
Text
- _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - - _ _ - _ _ _ _ _ - _ _ - _ . .- . _ . _ _ _ _
_ _ - - - _ _ .
- _ _ _ _.
_ _ _ ,
.
l
- p@ Mouqk
UNITED STATES
l!'
E
-
j'5.k
NUCLEAR REGULATORY COMMISSION
'
,
3'
E
REGION IV
0,,
[
611 RYAN PLAZA DRIVE. SUITE 400
I
%,
,e'
ARUNGTON. TEXAS 76011 8064
Jtt. 29 1998
l
John R. McGaha, Vice President - Operations
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
i
St. Francisville, Louisiana 7077S
SUBJECT: NRC INSPECTION REPORT 50-458/98-12 AND NOTICE OF VIOLATION
Dear Mr. McGaha:
From May 17 through June 27,1998, an inspection was conducted at your River Bend Station
reactor facility. The enclosed report presents the scope and results of that inspection.
During the 6-week period covered by this inspection, your conduct of activities at the River Bend
Station facility was generally characterized by safety-conscious operations, sound engineering
and maintenance practices, and effective radiological controls. However, two violations were
,
identified during this inspection period. - The first violation involves an operator mistakenly pulling
control power fuses for the Division ll diesel generator output breaker, which momentarily
rendered the diesel generator inoperable. This is the third operator human performance error
!
we have observed during the past two inspection report periods that has had an impact on plant
operation, in your response to this violation, please discuss your actions to address the
increasing trend in Operations related human performance errors.
'
The second violation involves the failure to maintain emergency preparedness sirens operational
i
due to a problem with a computer software upgrade. Although this problem was identified during
a surveillance, post-installation testing of the software upgrade was inadequate and failed to
identify the problem, in response to this violation, please address your actions to ensure
thorough computer software testing.
The violations are cited in the enclosed Notice of Violation (Notice) and the circumstances
j
surrounding the violations are described in detailin the enclosed report. Please note that you
'
are required to respond to this letter and should follow the instructions specified in the enclosed
g
Notice when preparing your response. The NRC will use your response, in part, to determine
\\}
whether further enforcement action is necessary to ensure compliance with regulatory
\\
'
requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure (s), and your response will be placed in the NRC Public Document Room (PDR).
,h
%
j/
9807310359 980729
?
gDR
ADOCK 05000458
s
_ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ - - _ _ _ _ _ _ _ _ _ - - - _ - _ - _ _ _ _ - - - _ ,
.
4
Entergy Operations, Inc.
-2-
Should you have any questions concerning this inspection, we will be pleased to discuss them
)
with you.
_
1
Sincerely,
I
l
l
c
c
t
h</
\\
enneth
.B c
an, Deputy Director
Division o
e
or Projects
]
l
Docket No.:
50-458
License No.: NPF-47
Enclosures:
2. NRC Inspection Report
50-458/98-12
cc w/ enclosures:
Executive Vice President and
Chief Operating Officar
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
General Manager
Plant Operations
River Bend Station
' Entergy Operations, Inc.
'
P.O. Box 220
St. Francisville, Louisiana 70775
Director- Nuclear Safety
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
i
l
l
L_____----____--___
_ .- ._.
__ ._
. _ _
_ _
_
-
._____
____
_ ___ _
_ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ - -
.
.
Entergy Operations, Inc.
-3-
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, M ssissippi 39205
Mark J. Wetterhahn, Esq.
Winston & Strawn
1401 L Street, N.W.
Washington, D.C. 20005-3502
Manager - Licensing
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
The Honorable Richard P. leyoub
Attorney General
Department of Justice
State of Louisiana
P.O. Box 94005
Baton Rouge, Louisiana 70804-9005
H. Anne Plettinger
3456 Villa Rose Drive
Baton Rouge, Louisiana 70806
President of West Feliciana
Police Jury
P.O. Box 1921
St. Francisville, Louisiana 70775
William H. Spell, Administrator
Louisiana Radiation Protection Division
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
..
f
_ _ _ _ _ _ _ _ - _ _ . _ _ _
.
.
Entergy Operations, Inc.
-4-
Ji 291998
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
Branch Chief (DRP/C)
MIS System
Project Engineer (DRP/C)
RIV File
'
Branch Chief (DRP/TSS)
I
i
)
l
l
DOCUMENT NAME: R:\\_RB\\RB812RP.GDR
To receive copy of document. Indicate in box:"C" = Copy wi*hout enclosures "E" = Copy with enclosures "N" = No copy
i
RIV:RI:DRP/C l
SRl:DRP/C l
C:DRP/C l
C:DRS
,l
DD:DRP
l
NPGarrett *
j GDReplogle * )
CSMarschall
BMurray V
kEBrockman ff
07M/9814#/ 07AA/98 F/g 07/44/98 y #/
07/p)8
07/f4/98
- See previous concurrence OFl"lCIAL RECORD COPY
>
,
l
.J
l
.
- ..
.
. Er.tergy Operations, Inc.
-4-
11. 29 1998
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
l
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
l
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
Branch Chief (DRP/C)
MIS System
.
Project Engineer (DRP/C)
RIV File
!
Branch Chief (DRP/TSS)
l
!
l'
1
,
j
1
l
DOCUMENT NAME: R:\\_.RB\\RB812RP.GDR
!
To receive copy of document. Indicate in box:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV:RI:DRP/C
SRI:DRP/C
C:DRP/C
C:DRS
DD:DRP
,
NPGarrett *
-j
GDReplogie * ) CSMarschall
BMurray V
kEBrockman f)
07M/98 td#g 07AN98 F/g 07/M/98 W M
07/p)8
07/1N/98
"
- See previous concurrence OFF"lCIAL RECDRD COPY
y'
'
310051
l
_ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _
____________________o