ML20236V034
| ML20236V034 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 07/23/1998 |
| From: | Gordon Peterson DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20236V036 | List: |
| References | |
| NUDOCS 9807310253 | |
| Download: ML20236V034 (5) | |
Text
- _ - _ _ _ _ _ _ _ - - - _ - - _ _ - _ - - _ - _ - - - -.
s *
, y
'h Duke Power Company Mr Envy Compn.y l
g l
Catawba Nuclear Station 4800 Loncord Road York, SC 29745 Gasy R. Peterson (803) 831-4251 orrtct Vice President (803) 831-3426 FAX t
j July 23, 1998
)
l U.S.
Nuclear Regulatory Commission Washington, DC 20555-0001 l
Attention:
Document Control Desk
Subject:
Duke Energy Corporation Catawba Nuclear Station Units 1 and 2 Docket Nos. 50-413 and 50-414 Emergency Plan Implementing Procedures Please find enclosed for NRC Staff use and review the following Emergency Plan Implementing Procedures:
HP/0/B/1000/006, Emergency Equipment Check and Inventory (7/6/98) l HP/0/B/1009/005, Personnel / Vehicle Monitoring for Emergency Conditions (7/6/98)
HP/0/B/1009/016, Distribution of Potassium Iodide Tablets in the Event of a Radioiodine Release (7/6/98) l HP/0/B/1009/019, Emergency Radio system Operation, Maintenance, and Communication (7/6/98)
This revision is being submitted in accordance with 10CFR 50.54 (q) and does not decrease the effectiveness of the Emergency Plan Implementing Procedures or the Emergency Plan.
By copy of this letter, two copies of the above documents are being provided to the NRC, Region II.
If there are any questions, please call Steve Christopher at 803-831-4027.
/
l Very truly yo I
f A
l l
Ga Peterson
/
00 %
Attachments 9807310253 980723 PDR ADOCK 05000413 i
F PDR
-s U.S.
Nuclear Regulatory Commission 3
July 23, 1998 j
Page 2 xc (w/ attachments):
L. A. Reyes U.S. Nuclear Regulatory Commission i
Regional Administrator, Region II Atlanta Federal Center 61 Forsyth St.,
SW, Suite 23T85 Atlanta, GA 30303 (w/o attachments):
l P.
S.-Tam NRC Senior Project Manager (CNS)
U.S. Nuclear Regulatory Commission Mail Stop O-14H25 Washington, DC 20555-0001 D.
J.
Roberts Senior Resident Inspector (CNS)
U.S. Nuclear Regulatory Commission Catawba Nuclear Site l
l C______._.____.______
]
l Page 1 of:-
3 DUKE POWER COMPANY CATAWBA NUCLEAR STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX V,o VOLUMEI PROCEDURE TITLE RP/0/A/5000/001 Classification of Emergency (2/17/98) l RP/0/A/5000/002 Notification of Unusual Event (6/25/98)
RP/0/A/5000/003 Alert (6/25/98)
RP/0/A/5000/004 Site Area Emergency (6/25/98)
RP/0/A/5000/005 General Emergency (6/25/98)
RP/0/A/5000/06 Deleted RP/0/A/5000/006 A Notifications to States and Counties from the Control Room (2/26/98)
RP/0/A/5000/006 B Notifications to States and Counties from the Technical Support Center (2/26/98)
RP/0/A/5000/006 C Notifications to States and Counties from the Emergency Operations Facility gs
.U (2/26/98)
I RP/0/A/5000/007 Natural Disaster and Earthquake (6/10/97)
RP/0/A/5000/08 Deleted RP/0/B/5000/008 Spill Response (6/7/98)
RP/0/A/5000/009 Collision / Explosion (3/3/97)
RP/0/A/5000/010 Conducting A Site Assembly or Preparing the Site for an Evacuation (6/29/98)
RP/0/A/5000/11 Deleted RP/0/B/5000/12 Deleted RP/0/B/5000/013 NRC Notification Requirements (11/13/97)
RP/0/B/5000/14 Deleted RP/0/A/5000/015 Core Damage Assessment (3/13/96)
.O ar'o'8'sooo'oi6 oeietea RP/0/B/5000/17 Deleted l
July 23,1998 L --_
Page J of 3 DUKE POWER COMPANY
' CATAW'BA NUCI EAR STATION l
EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX l
(
PROCEDURE TITLE l
j-RP/0/A/5000/018 Emergency Worker Dose P..casion (1/15/%)
RP/0/B/5000/019 Deleted l
RP/0/A/5000/020 Technical Support Cen'er (TSC) Activeion Procedure (1/23/98) l RP/0/A/5000/021 The Emergency Operations Facility (EOF) Activation Procedure (1/21/98)
RP/0/B/5000/022 Evacuation Coordinator Procedure (6/29/98)
RP/0/B/5000/023 Deleted t
RP/0/A/5000/024 OSC Coordinator Procedure (11/13/97)
RP/0/B/5000/025 Recovery and Reentry Procedure (2/17/98)
RP/0/B/5000/026 Response to Bomb Threat (5/30/%)
RP/0/B/5000/028 Communications and Community Relations EnergyQuest Emergency
- O.
ResPensePian<2,22,92) t O
July 23,1998 i
E_
l Page 3 of 3 i
DUKE POWER COMPANY CATAWBA NUCLEAR STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX O
vo'u=811 PROCEDURE TITLE l
HP/0/B/1000/006 Emergency Equipment Functional Check and Inventory (Rev. 52)
HP/0/B/1009/001 Radiation Protection Recovery Plan (Rev. 007)
HP/0/B/1009/003 Radiation Protection Response Following a Primary to Secondary leak (Rev. 007) l HP/0/B/1009/004 Environmental Monitoring for Emergency Conditions Within the Ten-Mile Radius of CNS (Rev. 0)
HP/0/B/1009/005 Personnel / Vehicle Monitoring for Emergency Conditions (Rev. 016)
HP/0/B/1009/006 Alternative Method for Determining Dose Rate Within the Reactor Building (Rev. 007)
HP/0/B/1009/007 In-Plant Particulate and Iodine Monitoring Under Accident Conditions l
(Rev. 017)
HP/0/B/1009/008 Contamination Control During Transportation of Contaminated Injured Individuals (Rev. 014)
' ~
HP/0/B/1009/009 Guidelines for Accident and Emergency Response (Rev. 037)
HP/0/B/1009/014 Radiation Protection Actions Following an Uncontrolled Release of Radioactive Material (Rev. 007)
HP/0/B/1009/016 Distribution of Potassium Iodide Tablets in the Event of a Radioiodine Release (Rev. 010) t HP/0/B/1009/017 Post-Accident Containment Air Sampling System (Rev. 013)'
HP/0/B/1009/018 Deleted HP/0/B/1009/019 Emergency Radio System Operation, Maintenance and Communication (Rev. 010)
HP/0/B/1009/024 Implementing Procedure for Estimating Food Chain Doses Under Post-Accident Conditions (Rev. 002)
HP/0/B/1009/025 Emergency Response Offsite Dose Projections (Rev. 001)
HP/0/B/1000/026 On-Shift Offsite Dose Projections (Rev. 0)
OP/0/A/6200/021 Operating Procedure for the Post Accident Liquid Sampling System II+
(Rev. 27)
)
SR/0/B/2000/001 Standard Procedure for Public Affairs Response to the Emergency Response Facility (Rev. 001) j SR/0/B/2000/002 Standard Procedure for EOF Commodities and Facilities (Rev. 0)
)
July 23,1998
_ _ _ _. - - _ _ _ _