Forwards Insp Rept 50-482/87-11 on 870518-22 & 0602-05.No Violations or Deviations Noted.Three Unresolved Items Identified Discussed in Rept.Response Identifying All Addl Actions Taken & Planned for Items Requested within 60 Days
ML20236U899
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 11/25/1987
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20236U901 List:
References
NUDOCS 8712030440
Download: ML20236U899 (2)


See also: IR 05000482/1987011

Text

_ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _

,

.

In Reply Refer To:

Docket:

STN 50-482/87-11

Wolf Creek Nuclear Operating Corporation

ATTN:

Bart D. Withers

President and Chief Executive Officer

P. O. Box 411

Burlington, Kansas. 66839

Gentlemen:

This refers to the inspection conducted by Mr. J. R. Boardman of this office

during the periods of May 18-22 and June 2-5, 1987, of activities authorized by

NRC Operating License NPF-42 for the Wolf Creek Generating Station, and to the

discussion of our findings with you and other members of your staff at the

conclusion of the inspection.

.

'

Areas examined during the inspection included the licensee corrective action

program. Within this area, the inspection consisted of selective examination

of procedures and representative records, interviews with personnel, and

observations by the NRC inspector.

The inspection findings are documented in

the enclosed inspection report.

Three unresolved items are identified in paragraphs 2.a.(1)(b), 2.a.(4)(a), and

2.a.(4)(b) of the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

A response is requested within 60 days identifying all additional actions that

you have taken, and are planning for the three unresolved items; for the open

items identified in report Sections 2.a.(1)(a), 2.a.(1)(b), 2.a.(3), 2.b., 2.d.,

2.e., and 2.f.; and for the audit findings discussed in Section 2.g.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

/i

Sincu aly,

8712030440 h h e2

PDR

ADDCK

PDR

G

L. J. Callan, Director

Division of Reactor Projects

Enclosure:

(see next page)

i

Enclosure:

(see next page)

RIV:RSB/05

C:ES

C: 05 ,h

C:R

C: RPB

-

JRBoardman.dp REIre'and

DMHunnicutt

Dg' /87

JEGagli

jo

r

no /6/87

10/JG/87

10 //h /87

l/

N/p/

g

D:DRS

D:Dk

'

LJCaj/87

k

pJMilho

lan

l

3)

Q '*/pfj3

o /,9

/

f

- - _ _ - _ _

-_ - -____-

'1'

b

l

Wolf Creek Nuclear Operating

-2-

Corporation

Enclosure:

Appendix - NRC Inspection Report

50-482/87-11

,

1

l

cc w/ enclosure:

Wolf Creek Nuclear Operating Corporation

ATTH:

Otto.Maynard, Manager

of Licensing

P.O. Box 411

Burlington,. Kansas

66839

Gary Boyer, Plant Manager

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

.

Burlington, Kansas

65839

Robert D. Elliott, Chief Engineer

i

Kansas Corporation Commission

Fourth Floor, Docking State Office Building

Topeka, Kansas

66612-1571

Kansas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

Myron Karman, ELD, MNBB (1)

  • RRI

R. D. Martin, RA

  • Section Chief (DRP/A)
  • DRP

RPSB-DRSS

W. L. Forney, RIII

  • RIV File

Resident Inspector, RIII

  • MIS System
  • RSTS Operator
  • Project Engineer, DRP/A
  • R. Hall
  • Lisa Shea, RM/ALF
  • P. O'Connor, NRR Project Manager
  • DRS
  • TSS

.'

  • W. Seidle
  • R. Ireland
  • w/766

_-_____ -____- -___ _ ___ - _ _ - _ -__ _ -