ML20236U893

From kanterella
Jump to navigation Jump to search
PN-75-086:licensee Reported That Strike of Operating & Maint Bargaining Unit Personnel Would Take Place on 750904.Plant Will Be Operated by Site & Corporate Supervisory Personnel IAW Contingency Plan
ML20236U893
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 09/04/1975
From: Jennifer Davis, Thornburg H, Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PN-75-086, PN-75-86, NUDOCS 9807310141
Download: ML20236U893 (1)


Text

-

y -- -pyrigwr yfst/ gf(g PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE

- ' Y,7;, September 4, 1975

--) PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE --PN-75-86

'c This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by OIE staff as of 9:00 a.m. on the date of this notification. IT SHOULD BE SPECIFICALLY NOTED THAT THIS NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY BE DETERMINED TO BE INACCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT

. NOTIFICATION OF AN INCIDENT OR OCCURRENCE (BLUE SHEET) SUBSEQUENTLY l WILL BE ISSUED IF WARRANTED. l I

Facility: Iowa Electric Light and Power Company (Duane Arnold)

Subject:

ANNOUNCED STRIKE AT NUCLEAR POWER STATION - !

l The licensee reported that a strike of operating and maintenance bargaining l unit personnel would take place at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> on September 4, 1975. l The plant will be operated by site and corporate supervisory personnel in accordance with their contingency plan. . .

The Chicago Regional Office will have an inspector at the site to verify that the contingency plan is formal}y approved, that the plant is adequately

"" j

. . , staffed and that there is a proper turn over of the plant.

('~

Region III received notification of this occurrence by telephone from E. Hammond, Assistant Chief Engineer, at 1415 hours0.0164 days <br />0.393 hours <br />0.00234 weeks <br />5.384075e-4 months <br />, September 3, 1975.

RFWarnick, IE x7261

~

Contact:

HDThornburg, IE x7353 JGDavis, IE x7541 Distribution: k/

Chairman Anders Co=missioner Mason S. J. Chilk, SECY Commissioner Gilinsky Commissioner Rowden G. F. Murphy, JCAE Commissioner Kennedy C. C. Rammerer, CA O L. V. Gossick, EDO D. F. Knuth, IE J. A. Harris, PA B. C. Rusche, NRR H. H. Brown, ISP T. J. McTiernan, AIA K. R. Chapman, NMSS H. K. Shapar, ELD Transmitted: P Bldg /o :m o. ; H St /01/0g MNBB /o r r , ; Lugejn.o,/

PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE l .

(3= 9  %  %

9807310141 750904 PDR I&E PN-75-086 PDR