| Site: | Vogtle |
| Issue date: | 11/20/1987 |
| From: | Crocker L Office of Nuclear Reactor Regulation |
| To: | City of Dalton, GA, Georgia Power Co, Municipal Electric Authority of Georgia, Oglethorpe Power Corp |
| Shared Package | |
| ML20236U438 | List: |
| References | |
| NPF-68-A-003 NUDOCS 8712030055 | |
| Download: ML20236U437 (8) | |
Text
_
ff UNITED STATES e"
t.,
NUCLEAR REGULATORY COMMISSION
{
j WASHINGTON, D. C. 20555 e
...../
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA DOCKET NO. 50-424 V0GTLE ELECTRIC GENERATING PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 3 License No. NPF-68 1.
The Nuclear Regulatory Comission (the Commission) has found that:
A.
The application for amendment to the Vogtle Electric Generating Plant, Unit 1 (the facility) Facility Operating License No. NPF-68 filed by the Georgia Power Company acting for itself, Oglethorpe Power Corpo-ration, Municipal Electric Authority of Georgia, and City of Dalton, Georgia, (the licensees) dated August 26, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confonnity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance: (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and; E.
The issuance of Ihis amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachments to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. NPF-68 is hereby amended to read as follows:
g20gggy h p
P
... (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 3
, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. GPC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
%\\
Lawrence P. Crocker, Acting Director Project Directorate II-3 Division of Reactor Projects
Attachment:
Technical Specification Changes Date of Issuance:
November 20, 1987 SEE PREVIOUS CONCURRENCES PDII-3/DRPI/II PDII-3/DRPI/II SCIB OGC-Bethesda
- MDuncan/mac
- MMiller
- JBJ
- EReis, JScinto 09/25/87 09/25/87 09/28/87 10/22/87
)
PD#II-3/DRP-1/II P
I-3/DRP-I/II LCRocker, Acting PD GL nas 11/ g /87 11/g/87
ATTACHMENT TO LICENSE AMENDMENT NO. 3 FACILITY OPERATING LICENSE NO. NPF-68 DOCKET NO. 50-424 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by Amendment number and contain vertical lines indicating the areas of change. The corresponding overleaf pages are also provided to maintain document completeness.
Amended Overleaf '
Page Page 3/4 3-24 3/4 3-23 3/4 3-25 3/4 3-26 3/4 3-27
Il 1!
l I'
I l
i
(
g '
NO I
T d
d C
3 3
4 7
0 0
1 3
A 2
2 1
1g 2
2 2
2 n
i ta i
t E
4 4i 4
4 L
n BS
,i AE 3
3 3
3 3
3 3
CD
,n IO o
LM 2
2 2
2i 2
2 2
2 P
,t P
c A
1 1
1 1e 1
1 1
1 jn I
N y
O t
I e
T SE f
A MLL a
T UEB p
S N
MNA m
s s
E INR u
l u
u M
NAE p
l b
b U
IHP
/
a
/
/
R MCO 2
1 2
3 3
3 2
2 T
r S
o N
f I
e M
v E
os
)
T bt d
S an e
Y S
e u
S LP
.m n
EI p
1e i
N NR m
r s
s t
O NT u
ti u
u n
I A
p iu b
b o
T HO
/
nq
/
/
C A
CT 2
1 1
2Ue 2
2 2
1
(
U r
T l
2 C
ad A
nn 3
S oa S
.L i
3 E
OE ts R
NN cn E
U N
no L
T LA ui B
A AH Ft s
s A
E TC c
u u
T F
O en b
b TF h
eu
/
/
Y O
2 3
2 4Sf 4
4 3
S p
t m
n
)
D u
e s
e A
E P
d u
g 7
R r
i B
a 5
E en c
c t
1 4
E t e o
i n
F l
1&0 N
av t
g i
B S
o s P I
wi p o o
E V
sk 6I G
dr rmL CnA d
ec
,5 P N
eD eu s
o1 V
f e
ro e4 E
e-vS ny wi9) k o
d ul r0&
Fr o
oa ot9A a
t r u-o n
h y il Lc03 6
s r
ae sI7 4 nt o
cc t e - e9 1
s g
et sP5 -
io i
tn aR wjI9
. so se Fn e 4 P aM t
ie u onL0 4 uL uD I
r
,0 M
a wg tn LI B - B -
y PC -
t i
Sr co -
,I o
e e
t m
&I p
l r t
e Ai
- yBL t Fg F g ee r B, P i
l a i
cm t lt&
Sa S a ft e
r At n
iE ca eeA r Et Et as zA T
S I
t iu vf0A e
l l
Syi5A T
f at tt ea92 w Vo Voe S r56 r I
o,
l mn ac LS99 o kv k vg d u45 o N
s a
oe mA 09 P
r ra en s04 t U
pp u
tm o Th- 0 6e 6et ro s- 0 c im n
un td StI -
f 1d 1dl ei eI -
a L
ru a
Ai un WiLI o
.n
.no et rPI e A
TP M
- a Aa Rw(L 4U 4UV na P(P R N
it s
i u O
mn s
gt eo I
o nc T
e f
SC a b
L a b
EA a b
CNU F
7 8
9
-rm, E " "
wD w r" o
l(lllljl!ll t
o
,i\\l)!
illI I
l N
O I
T d
d d
C 6
6 6
A 2
2 2
j j j
E 4
4 4
L BS AE 3
3 3
CD
, '6 IO
,6 n
2 "6, LM 2
2 o
P
, i P
,8 t
,e A
1 5 1 5 c 1 S i i i
e jn I
N O
y I
t T
SE e
A MLL f
T UEB a
N MNA S s E
INR t
M NAE l n U
IHP l e R
MCO 1
2 am 2
1 1 1
T e
S rr N
oi I
f uq M
ee E
vr
)
T o
d S
bd e
Y S
an u
S MLP a
n UEI 1
i N
MNR s
t O
INT tn n
I NA io o
T IHO ni C
A MCT 1
1 Ut 1
1 1 1
(
U c
T l n 2
C au A
nf 3
S o
S
.L ig 3
E OE t n R
NN ci E
U N
nt L
T LA ua B
A AH Fi A
E TC t
T F
O ei TF en Y
O 2
2 Si 2
2 4 4
TE FAS yc l
D n
a E
e n
R g
n g
E r
c o
i c
E e
i i
S i
N m
g r
tt g
I E
o o
sa gn o
G L
t ou no L
N n
s i
)
Pt ii s
E o
ny n 7 c
dt ny i
oa o 1 gA l a oa t
n il M 1 n
n ii il a
o t e n
2 in o ud t e l
i aR o
s 1 do i Ba aR i
t u
i a -
li t
R u
t a
tn t
g E i t a g B) t n n
i co c
o R ua i nt&B co e
t Ai e
i Bl t icA&
Ai Vn i t
j d
i i l u A
t o n ca n
a 6 gt n dD2 ca miI iu I
R 1 nn I n
33 iu T
ot tt 1
ie at53 tt I
oa l
ac y
e 2 l V l
Hs25 ac N
Ru a mA t
k 1 d
a u2 mA U
t u o
e a -
nt u l aE -
o l c n td f
t E an n ehRE td L
oA a un a
n R He a uxAR un A
r M
Aa S
I
(
d M FE(A Aa N
t e li O
nd ec I
oo uc T
CM a b
c d
FA a b c
CN U
0 1
F 1
1 Ew ws E$E8e w
< h r*
1lli i!i ll
TABLE 3.3-2 (Continued)
TABLE NOTATIONS Trip function may be blocked in this MODE below the P-11 (Pressurizer a
Pressure Interlock) Setpoint.
b Trip function automatically blocked above P-11 and may be blocked below P-11 when Safety Injection on low steam line pressure is not blocked.
During movement of irradiated fuel or movement of loads over irradiated c
fuel within containment.
d The provisions of Specification 3.0.4 are not applicable.
During movement of irradiated fuel or movement of loads over irradiated fuel, e
f Not applicable if one main steam isolation valve and associated bypass iso-lation valve per steamline is closed.
g Containment Ventilation Radiation (RE-2565) is treated as one channel and is considered OPERABLE if the particulate (RE-2565A) and iodine monitors (RE-2565B) are OPERABLE or the noble gas monitor (RE-2565C) is OPERABLE.
h Manual initiation of Auxiliary Feedwater is accomplished via the pump handswitches, i Whenever irradiated fuel is in the storage pool.
j For actions associated with inoperable instrumentation, follow actions specified in Specification 3.9.12.
A_C_ TION STATEMENTS ACTION 14 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least H0T STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> j
for surveillance testing per Specification 4.3.2.1, provided I
the other channel is OPERABLE.
ACTION 15 - With the number of OPERABLE channels one less than the Total
)
Number of Channels, operation may proceed until performance of j
the next required ANALOG CHANNEL OPERATIONAL TEST provided the i
inoperable channel is placed in the tripped condition within I hour.
ACTION 16 - With the number of OPERABLE channels less than the Minimum 3
Channels OPERABLE requirement, comply with the ACTION requirements of Specification 3.9.9 (Mode 6).
V0GTLE - UNIT 1 3/4 3-25 Amendment No.
3
TABLE 3.3-2 (Continued)
ACTION STATEMENTS (Continued)
)
~
ACTION 17 - With the number of OPERABLE channels one less than the Total Number of Channels,' operation may proceed provided the inoperable channel is placed in the bypassed condition and the Minimum Channels OPERABLE requirement is met.
One additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2.1.
ACTION 18 - With one less than the Minimum Channels OPERABLE requirement, operation may continue provided the containment purge supply and exhaust valves are closed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
ACTION 19 - With the number of OPERABLE channels one less than the Min Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
ACTION 20 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
The inoperable channel is placed in the tripped condition a.
within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and
)
The Minimum Channels OPERABLE requirement is met; however, b.
one additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing of other channels per Specification 4.3.2.1.
ACTION 21 - With the number of OPERABLE Channels less than the Minimum Channels OPERABLE requirement, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> determine by pbserva-tion of the associated permissive status light (s) that the inter-lock is in its required state for the existing plant condition, or apply Specification 3.0.3.
ACTION 22 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2.1 provided the other channel is OPERABLE.
ACTION 23 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
V0GTLE - UNIT 1 3/4 3-26 J
TABLE 3.3-2 (Continued)
ACTION STATEMENTS (Continued)
ACTION 24 - With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or declare the associated valve inoperable and take the ACTION required by Specification 3.7.1.5.
ACTION 25 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least H0T STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypacsed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2.1 provided the other channel is OPERABLE.
ACTION 26 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 7 days or within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> initiate and maintain operation of the Control Room Emergency Ventilation System in the Emergency mode.
With two channels inoperable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> initiate and maintain operation of the Control Room Emergency Ventilation System in the Emergency mode.
ACTION 27 - Not Used.
ACTION 28 - Not Used.
V0GTLE - UNIT 1 3/4 3-27 Amendment No. 3 L_________-__--___-