Advises That Util Joined Seismic Qualification Util Group (Squg).Squg Methodology & Schedule for Implementation of Generic Ltr 87-02 Requirements Will Be Adopted by Util
ML20236U223
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/25/1987
From: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GL-87-02, GL-87-2, NUDOCS 8712020372
Download: ML20236U223 (1)


Text

- _____- - _

M

- Portland General Electric Coiripeny

-i David W. Cockfield Vice President, Nuclear November 25,-1987 Trojan Nuclear Plant' Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555

Dear Sir:

Generic Letter 87-02: Verification of Seismic:

Adequacy of Mechanical and Electrical Equipment This letter is submitted to fulfill the commitment node in our letter of October 21, 1987.

In the October 21, 1987 letter, Portland General Electric Company (PGE) committed to provide either a description of our current activities, plans, and schedule for implementing the requirements of Generic Letter 87-02, or a commitment to join the Seismic Qualifica--

tion Utility Group (SQUG). Since the submittal of the October 21, 1987 letter, PGE has joined the SQUG. Therefore, the SQUG methodology and schedule for implementation of Generic Letter 87-02 requirements will be adopted by PGE.

Sincerely, i

c/

p

}

i l

~

l c:

Mr. John B. Martin j

l Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. Dave Yaden, Director State of Oregon Department of Energy i

i Mr. R. C. Barr NRC Resident Inspector Trojan Nuclear Plant i

I f

I 8712O20372 871125 PDR ADOCK 05000344 P

PDR' o

\\

121 S W. Saimon Street, Pomand. Oregon 97204

-_ - __ -