Application for Amends to Licenses DPR-29 & DPR-30,changing Surveillance Requirements Re Discharge Pipe Pressure for Core & Containment Sys Tech Specs from Monthly to Every 24 H
ML20236T832
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 11/24/1987
From: Johnson I
COMMONWEALTH EDISON CO.
To: Murley T
Office of Nuclear Reactor Regulation
Shared Package
ML20236T834 List:
References
3891K, NUDOCS 8712020119
Download: ML20236T832 (2)


Text

[i y~)3 N Comm:nwrith Edison One First National Plaza, Chicago, Illinois

'+-

Address RIply to: Post OEe~Hox 767

\\

(,/

Chicago, Illinois 60690 0767 November 24, 1987 Mr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Quad Cities Station Units 1 & 2

" Discharge Pipe Pressure for Core and containment System Technical Specifications" NRC Docket Nos. 50-254 & 265 Reference (1): Letter from M. S. Turbak to T. E. Murley dated October 6, 1987 (2): Letter from G. Holahan to D. L. Butterfield, dated October 6, 1987

)

Dear Mr. Murley:

In reference letter (1), Commonwealth Edison requested to amend our Technical Specifications for Quad Cities Station Units 1 & 2.

The change pertains to the manner by which we maintain the HPCI and RCIC discharge pipe level. By reference (2), we received a waiver of compliance for this specification for the time period during which this amendment is being reviewed.

In a November 19, 1987 conference call with members of your staff we agreed to change the surveillance requirements from " monthly".to "every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />". This surveillance requirement pertains to the venting of the HPCI/RCIC piping and verification of water flow from the high point of the system's discharge piping when the system is lined up to take suction from the torus. This change results in a more conservative surveillance requirement, hence the evaluation of Significant Hazards Consideration has been unaffected due to this change.

1 g

h Q

P D

tj

T. E. Murley Novembsr 24, 1987 In accordance with Commonwealth Edison Company procedures, this change has been reviewed and approved by the On & Off Site Review Groups.

Please direct any questions you may have regarding this matter to this office.

Very truly yours I

f I. M. Johnson Nuclear Licensing Administrator Attachment cc:

T. Ross - NRR A. B. Davis - NRC Region Administrator -RIII QC Resident Inspector f