Pubhc Service Electric and Gas Cornpany P.O. Box L Hancocks Bridge, New Jersey 08038 Hope Creek Operations November 24, 1987 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Dear Sir:
HOPE CREEK GENERATING STATION DOCKET NO. 50-354 UNIT NO. 1 SPECIAL REPORT 87-009-00 This Special Report is being submitted pursuant to the requirements of Technical Specification 3.5.1 Action g.
Sincerely, S.
LaBruna General Manager -
Hope Creek Operations RBC/
Attachment SORC Mtg.87-171 C Distribution l
l 0
pp S
I The Energy People
U E. NUCLEAM REOULATOAV COMMINION NiC Pere 388
'943)
Apr.ROvt0 Oud eso 3190 0104 LICENSEE EVENT REPORT (LER)
DOCERT NUMSER (26 PAGE G PACILITY NAME 11)
Hope Creek. Generating Station 01510 g i 01315l 41 loFl 0 ll
" ' ' ' ' ' ' High Pressure Coolant Injection System Injects To Vessel During Ronct n-scrnm - Anncial n o n n r +- A7_nro gyENT DATE 184 LER NUMBER'IG) l
'AEPORT DATE 17)
OTMER P ACILITIES INV$tVED IS) uCNtw OAv vtAR vtAR
M U'
",','N. MONTH O*v YEAR
C'uvv AMas 02CnET NUMetais.
n 515 l 0 l 0 l 0 l l l l
0l 8 2l9 87 8l 7 N l /l A 0l0 1l1 2l 4 8l 7 0 1 5 1 01 0 1 0 t l l l
"~
TMis REPont te sueulTTED PURSUANT TO THE REQUIREMENTS Oli 10 CPR l (Check.ae er me e of it's fede**ff 1111 p
eIOGE 19)
Q 20.403ibb 20 405:el 60.73ie H2 Hi.)
73 711bl POWER 30.40BisHHill 50.36teH10 30.736.Hf Hel f 3.7Hel
[ g,",'g5a-fr,;allyy,',,,
[
[
"70P 010 l0 30 40si.num
- 0mnan al nmienti 30.4081.Hilliill 60.73isH2Hil 50.734eH2H.iiiHA) 366Al
"~
SPECIAL REPORT 30 40.i.in ni.i nr3i.Kalm e0.rai.uzu.ians,87-009 n.wi.num
.0mnaniii nni.nanal LICENSEE CONTACT POfl THIS LER 112)
TELEPMONE NUMBER gagg ARE A COOE R.B.
Cowles, Lead Engineer - Technical p;l ng q qi 3 ql _ iSl2 6l4 1
COMPLETE ONE LINE FOR E ACM COMPONENT P AILunt DESC A10E0 tN TMis REPom7 (13:
"$[Ng$C "I'g",I#$[I j 'a,]
0
"$UNg$O "fo",*((I' 0
CAusE sv 5TE M COMPON E NT CAust system COMPONENT n
4 l
1 l l l l l l
l l l l l t 1
I I I I I I I
l l I I I I SUPPLEMENTAL REPORT EaPECTEO E14; MONTM OAV VEAR YE9 (19 ver. comsve. EXPECTED Suc40'$310N OA Til NO l
l l
AuT, AC, aL., M, a N,-....
, o.,
This Special Report is being submitted pursuant to the requirements of Technical Specification 3.5.1 Action g.
to document the circumstances of a High Pressure Coolant Injection system injection to the reactor vessel on 8/29/87. The HPCI injection occurred as a result of low reactor vessel water level excursion (level 2,
-38")
experienced immediately following a reactor scram.
For a description of the
- scram, refer to LER_87-038.
HPCI injected to the vessel for approximately 3 minutes.
At the onset of the injection, vessel pressure was about 900
As of 8/29/87, Hope Creek had experienced 9 HPCI injections to the reactor vessel (120 cycles are allowed by the FSAR).
Because of the early life of the plant, the HPCI injection nozzle usage factor has not been calculated.
The station is in the initial stages of implementing a thermal cycle tracking program.
This program will allow the calculation of component thermal usage factors.
RBC/
SORC Mtg.87-171 t
JT
_