One Morey Southern Nuclear Vice President Operating Comp =y i
f arley Project P.O. Box 1295 Birmingham, Alabama 35201 Tel 205 992 5131 July 17, 1998 SOUTHERN h COMFANY t
Energy to Serve YourWorld" Docket No.:
50-348 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC '20555 Joseph M. Farley Nuclear Plant - Unit 1 Baffle Former Bolt Insocction and Replacement Ladies and Gentlemen:
By letter dated March 27,1998, Southern Nuclear informed you of their intent to inspect and replace baffle former bolts during the next Farley Unit I refueling outage currently scheduled for the Fall of 1998. Our current plans for the outage are to inspect all baffle former bolts, replace any bolts with flaw indications, and as allowed for under 10CFR 50.59, replace all required bolts to ensure the baffle plates l
are able to perform their intended safety functions. The number of bolts actually replaced will be contingent on various aspects of the replacement program such as equipment reliability, personnel radiation exposure, schedule, and cost. SNC will ensure that an adequate bolting configuration exists to assure that all design basis functionality requirements of the baffle plates will be met.
As stated in the March 27,1998 letter, WCAP-14748/14749, " Justification for Increasing Postulated
- Break Opening Times in Westinghouse PWRs," and WCAP-15029, " Westinghouse Methodology for Evaluating the Acceptability of Baffle-Former-Barrel Bolting Distribution Under Faulted Flood l
Conditions," will be used in the evaluation. Herefore, continued NRC Staff review of these two WCAPs is requested. Based on a recent Westinghouse Owner's Group meeting with the NRC Staff, it is remgni=d hat review of WCAP-15029 will not be complete prior to the Farley Unit 1 outage.
t However, review of WCAP-14748 should be completed in August 1998. The request for review of l
WCAP-9735, "Multiflex Version 3.0 A FORTRAN IV Computer Program for Analyzing Thermal Hydraulic Structural System Dynamics Advanced Beam Model,"is withdrawn. Additionally, as requested by the NRC Staff, WCAP-15042, "Determmation of Acceptable Baffle-Barrel-Bolting for Three-Loop Westinghouse Domestic Plants," will not be submitted for NRC Staff rewiew.
l De current schedule for equipment testing and outage activities is provided below (all dates are in 1998). Dates for the testing and inspection are subject to change and should be confirmed if the NRC Staff plans to attend any of the activities.
\\ O 9807270450 980717 "
PDR ADOCK 05000348 s
PDR Cl p
l L
i
U. S. Nuclear Regulatory Commission Page 2 Activity Date Quaufy onsite mechanical testing (bolts) equipment (Westinghouse)
August 17-21 Functional testing of the UT (ROSA) equipment (Westinghouse)
August 20 -September 2 Replacement tooling acceptance testing (Germany)
August 4 - September 7 Outage start date October 3 Baffle former bolt inspection start date October 14 Baffle former bolt replacement stant date October 22
'Ihis letter contains no formal NRC commitments by SNC and is provided to the NRC staff for their information only. If there are any questions, please advise.
Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY bM Dave Marcy EWC:mafB3LTRI. DOC cc:
Mr. L. A. Reyes, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager Mr. T. M. Ross, Plant Sr. Resident Inspector Dr. D. E. Williamson, State Department of Public Health I