ML20236T109

From kanterella
Jump to navigation Jump to search
Forwards non-proprietary & Proprietary Versions of TS Change Request 260 to Amend License DPR-16,to Establish That Existing SLMCPR Contained in TS 2.1.A Is Applicable for Next Operating Cycle (Cycle 17).Proprietary Version Withheld
ML20236T109
Person / Time
Site: Oyster Creek
Issue date: 07/23/1998
From: Roche M
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20135G042 List:
References
1940-98-20391, NUDOCS 9807270437
Download: ML20236T109 (4)


Text

. _ _ _ _ . _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _

t I

i GPU Nuclear. Inc,

{

(- U.S. Route 6 South NUCLEAR Post Office Box 388 Forked River, NJ 087310388 s Tel 609 971-4000 1940-98-20391 e

July 23,1998 3 U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555 l

Subject:

Oyster Creek Nuclear Generating Station Facility License No. DPR-16 Docket No. 50-219 Technical Specification Change Request No. 260 In accordance with 10 CFR 50.4(b)(1), enclosed is Technical Specification Change Request (TSCR) No. 260 for the above facility.

GPU Nuclear requests that the Technical Specifications (TS) contained in Appendix A to the l Facility Lic use be amended to establish that the existing Safety Limit Minimum Critical Power Ratio (SLMCPR) contained in TS 2.1.A is applicable for the next operating cycle (Cycle 17). This license amendment application provides in Attachment 1 a discussion of the proposed TS changes, a safety assessment of the proposed TS changes, information supporting a fmding of no Significant Hazards Consideration and information supporting an Environmental Assessment.

Attachment I contains information considered proprietary to General Electric (GE) as described in 10 CFR 2.790(a)(4). Brackets within areas of text specify proprietary information while brackets in the right-hand margin indicate the general location of proprietary information.  ;

Attachment 2 contains an affidavit from GE attesting to the proprietary nature of the information. l Therefore, it is requested that this information be withheld from public disclosure. Attachment 3 )

is a redacted version of Attachment 1 that can be disclosed publicly. A mark-up of the TS page showing the requested change is contained in Attachment 4. The revised TS page is provided in '

Attachment 5.

In accordance with 10 CFR 50.91 (b)(1), the designated official of the State of New Jersey L Bureau ofNuclear Engineering has been sent a copy of this TSCR.

GPU Nuclear requests issuance of an immediately effective license amendment prior to stan-up from the next (Cycle 17R) refueling outage. The 17R outage is currently scheduled to begin on September 26,1998 and is projected to be about 35 days in duration. Since the requested license bR D 19 P. PDit &

l T' l &+)f"'>5 t

4 l

1940-98-20391 Page 2 of 2 l

amendment is necessary to support plant operation, issuance of the amendment should occur no later than October 30,1998.

l This license amendment application has undergone a safety review in accordance with Section 6.5 of the Oyster Creek Technical Specifications.

i Should further information be regiired, please contact Mr. Paul F. Czaya of our Nuclear Safety l

and Licensing Department at 609-971-4139.

Very truly yours, M b Michael B. Roche Vice President and Director Oyster Creek Attachments

- c: Administrator, USNRC Region I USNRC Resident Inspector Oyster Creek USNRC Project Manager e

I i

(

l f

i i

l l

l

=

L_'_____.______.____.____._____.

i GPU Nucleer,Inc.

{

l ( U.S. Route #9 South Post Office Box 338 NUCLEAR Forked River, NJ 08731-0388 l

Tel 609-9714000

l. I 1940-98-20391 July 23,1998 The Honorable Louis A. Amato, Jr.

Mayor of Lacey Township 818 West Lacey Road Forked River, NJ 08731

Dear Mayor Amato:

Enclosed herewith is one copy of Technical Specification Change Request No. 260 for the Oyster Creek Nuclear Generating Station Operating License.

l This document was filed with the United States Nuclear Regulatory Commission on July 23, 1998.

Very truly yours,

/b Michael'B. Roche Vice President and Director i

Oyster Creek Attachments f

l t

C.

1

= ,

I I

GPU Nuclear,Inc.

! U.S. Route #9 South l \

Post office sox 388 l NUCLEAR Forked River, NJ 08731-0388 l

Tel 609 9714000 l '

1940-99-20391 July 23,1998 i

Mr. Kent Tosch, Director Bureau of Nuclear Engineering i Department of Environmental Protection CN 411 Trenton,NJ 08625

Dear Mr. Tosch:

Subject:

Oyster Creek Nuclear Generating Station Facility Operating License No. DPR-16 Technical Specification Change Request No. 260 l Pursuant to 10 CFR 50.91(b)(1), please find enclosed a copy of the subject document, which was filed with the United States Nuclear Regulatory Commission on July 23,1998.

l l

Very truly yours, 7%dd60 Michael B. Roche Vice President and Director Oyster Creek Attachments t

u_____=_____--_---.-------