ML20236S768
| ML20236S768 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 11/16/1987 |
| From: | Johnson I COMMONWEALTH EDISON CO. |
| To: | Murley T Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20236S771 | List: |
| References | |
| 3762K, NUDOCS 8711300083 | |
| Download: ML20236S768 (2) | |
Text
_ ___ _
k Csmmenw=lth Edisen 3
One First National Plaza, Chicago, Ilknois V
Address Reply to: Post Office Box 767 Chicago, Illinois 60690 0767 November 16, 1987 Mr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 l
Subject:
Quad Cities Station Unit 1 Proposed Amendment to Technical Specification for Facility Operating License DPR Jet Pump Instrumentation NRC Docket No. 50-254 i
Reference (a): Letter from J.R. Wojnarowski to H.R. Denton dated January 28, 1986
Dear Mr. Murley:
In the above referenced letter, Commonwealth Edison proposed to amend its Technical Specifications for Quad Cities Station Unit 1 to reflect the operation of the unit with a failed jet pump instrument line.
Due to the long period of time that has elapsed since the referenced letter was submitted to your staff for their review and approval, Commonwealth Edison wishes to supplement its original submittal. We are providing the following documents to your staff in order to facilitate their review and issuance of the proposed license amendment:
4 (1) Attachment 1, Proposed Changes to DPR-29 Technical Specifications (pps. 3.6/4.6-5 and 3.6/4.6-13); and (2) Attachment 2, Summary of Changes; and l
(3) Attachment 3, Safety Evaluations; and (4) Attachment 4, Evaluation of Significant Hazards Consideration t, supercedes and replaces in total the information provided to you in our January 28, 1986 submittal. These pages contain additional proposed changes and have been retyped for clarity. A summary of these proposed changes can now be found in Attachment 2.
Such a summary was not provided in our earlier submittal. Attachment 3 (Attachment 2 in our Reference (a)) contains our Safety Evaluation which has not been changed from our January 28, 1986 submittal. Lastly, we are providing a revised Evaluation of Significant Hazards Consideration in Attachment 4 (Attachment 3 in our Reference (a)), which supplements our earlier evaluation.
If
.O B711300083 871116
, [I PDR ADOCK 05000254 P
,PDR l
l
i ' T..E. Murley ' November 16,.1987
)
The proposed changes have been reviewed and approved by on-site and' off-site review in accordance with Commonwealth Edison Company procedures.
Please direct any questions that you may have regarding this supplemental submittal.to this office.
Very truly yours, L.
I. M. John Nuclear Licensing Administrator im
- Attachments.(1)i Proposed' Changes to Appendix A, Technical Specification Change for Unit 1, Facility Operating License DPR-29 (2): Summary of Changes (3): Safety Evaluation (4): Evaluation of Significant Hazards Consideration cc:
T. Ross - NRR NRC Resident Inspector - Quad Cities M. C. Parker - IDNS SUBSCRIBED AND SWORN to bef,qe me..this // esc 4, day of VirAtialtIL/
, 1987 l
(
de2[tt 67-( LL CIe's Notary Public l
1 l-lI 3762K u______________.__
_l