Forwards Insp Repts 50-313/87-20 & 50-368/87-20 on 870720-24.No Violations or Deviations Noted.Two Unresolved Items Identified Re Corrective Action Program
ML20236S533
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 11/20/1987
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20236S535 List:
References
NUDOCS 8711250238
Download: ML20236S533 (2)


See also: IR 05000313/1987020

Text

...f

,,

,

NO V h 0 1987

In Reply Refer To:

Dockets:' 50-313/87-20-

50-368/87-20

.;

,

l

Arkansas Power & Light Company

ATTN: Mr. Gene Campbell

l

Vice President, Nuclear

'

Operations

1

(

P. O. Box 551

!

Little Rock, Arkansas

72203-

Gentlemen:

This refers to the inspection conducted by Mr. J. R. Boardman of this office

during the period July 20-24, 1987, of activities authorized by NRC Operating

Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, and to the discussion of

our findings with Mr. E. Ewing, General Manager, Plant Support and other-

members of your staff at the conclusion of the inspection.

The area examined during the inspection was the licensee's corrective action.

program. Within this area, the inspection' consisted of selective examination

of procedures and representative records, interviews ~with personnel, and

observations by the NRC inspector.

The inspection findings are documented in'

the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were identified.

'However, two unresolved items were identified in paragraph 2 of the appended

report. These unresolved items are similar to the potential weaknesses identified

by the NRC in the.recent Quality Verification Functional Inspection conducted

August 10-21, 1987, at Arkansas Nuclear One (Reference NRC Inspection

Report 50-313/87-23; 50-368/87-23,' dated November 5, 1987). Due to the

' similarity of the results of the inspections relating to your corrective action

program, the issues involving these unresolved items and identified in each of

the reports will be reviewed in a subsequent inspection.- The NRC is aware of

the efforts being taken to improve' the effectiveness of your corrective action

program, but is concerned that problems are being identified that could have an

adverse affect on plant safety and are not being promptly resolved.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

8711250239 871120

PDR

ADOCK 05000313

Original Signed By

G

PDR

A. B. Beach'

L. J. Callan, Director

Division of. Reactor Projects,

.

Eric'losure:

(see next page)

\\\\

C:PS/Ah

D:DRPb

RIV:0PS g

C:0PS

D

JRBoardmtin/tw WCSeidle

f JPJaudon

JJGa iardo

J 911hoan

LJCallan

n/tv/87

// //(/87

p H /2D/87

// //

87

lj//[/87

11/K)/87

, _ _ _ - - _ _ _ - _

. . , . ,

j

i

Arkansas Power & Light Company

-2-

l

1

4

Enclosure:

Appendix - NRC Inspection Report

j

50-313/87-20

'

50-368/87-20

i

cc w/ enclosure-

J. M. Levine, Director

,

'

Site Nuclear Operations

Arkansas Nuclear One

P. O. Box 608

Russellville, Arkansas

72801

Arkansas Radiation Control Program Director

bcc to DMB (IE01)

!

bec distrib. by RIV:

  • PS/A
  • RRI

R.'D. Martin, RA

RPSB-DRSS

  • Section Chief (PS/A)
  • D. Weiss, RM/ALF
  • RIV File
  • DRP
  • MIS System
  • RSTS Operator
  • Project Engineer, PS/A
  • G. Dick, NRR Project Manager
  • R. Hall
  • DRS
  • J.

Boardman

  • w/766

)

i

_ _ _ _ _ _ _ _ _ _