Text
__
i j
I Docket No.:
50-424 l
1 Mr. James P. O'Reilly Senior Vice President - Nuclear Operations NOV 2 0 1987 Georgia Power Company P.O. Box 4545 Atlanta, Georgia 30302
Dear Mr. O'Reilly:
SUBJECT:
Staff Acceptance of Seismic Design of Vogtle Unit 1 Spent Fuel Pool Racks (TAC 63338)
A schedular exemption to the regulations that apply to spent fuel pools for the time period before the racks contain irradiated fuel was included in the Vogtle Unit I low and full power licenses dated January 16, and March 16, 1987, respectively, because determination of the seismic adequacy of the racks had not been completed.
In response to staff requests for additional information dated November 28, 1986, and April 7,1987, Georgia Power Company provided letters dated January 21, May 22, July 20, and September 29, 1987. The staff has completed its review of the seismic adequacy of the Vogtle Unit 1 spent fuel racks and concludes that they are acceptable to meet applicable regulations including General Design Criteria 2 F1., and 62 of 10 CFR 50, Appendix A.
On this basis, the schedular exemption is no longer required, and Georgia Power Company may store irradiated fuel in the racks. The staff's detailed evaluation is enclosed.
If there are any questions, I can be reached at (301) 492-7357.
Sincerely, u\\
Melanie A. Miller, Project Manager j
Project Directorate II-3 l
Division of Reactor Projects I/II
Enclosure:
As stated cc:
See next page DISTRIBUTION:
O Docket File PRC System Local PDR NRC PDR
{
PDII-3 Reading MDuncan 71120 Q12ggo 500gg4 MMiller ACRS(10) p EJordan JStone V
-f%d-hPI/II PDlJ-kDRPI/II PDII-3/DRPI/II 1
MMiller/ rad MDd4can Acting Director 11/
7 11/p/87 11//7 87 i
I putou.
8
'o, UNITED STATES ET
n NUCLEAR REGULATORY COMMISSION i
'(
WASHINGTON, D. C. 20555 l
% ****+#
N0y 2 01987 i
Docket No.: 50-424 Mr. James P. 0'Reilly
)
Senior Vice President - Nuclear Operations l
Georgia Power Company
)
P.O. Box 4545 l
Atlanta, Georgia 30302 1
Dear Mr. O'Reilly:
SUBJECT:
Staff Acceptance of Seismic Design of Vogtle Unit 1 Spent Fuel Pool Racks (TAC 63338) i A schedular exemption to the regulations that apply to spent fuel pools for the time period before the racks contain irradiated fuel was included in the Vogtle Unit I low and full power licenses dated January 16, and March 16, 1987, respectively, because determination of the seismic adequacy of the racks had not been completed.
In response to staff requests for i
additional information dated November 28, 1986, and April 7, 1987, Georgia Power Company provided letters dated January 21, May 22 July 20, and
]
September 29, 1987.
The staff has completed its review of the seismic adequi.cy j
of the Vogtle Unit I spent fuel racks and concludes that they are acceptable to meet applicable regulations including General Design Criteria 2, 61, and 62 of 10 CFR 50, Appendix A.
On this basis, the schedular exemption is no longer required, and Georgia Power Company may store irradiated fuel in the racks.
The staff's detailed evaluation is enclosed.
If there are any questions, I can be reached at (301) 492-7357.
Sincerely, s
Melanie A. Miller, Project Manager Project Directorate II-3 i
Division of Reactor Projects I/II
Enclosure:
As stated cc:
See next page 1
f 4 Mr. - J. P. O'Reilly m,
Georgia Power Company Vogtle Electric Generating Plant-cc:
Mr. L. T. Gucwa
' Resident Inspector Chief Nuclear Engineer Nuclear. Regulatory Commission Georgia Power Company P. O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Deppish Kirkland, III, Counsel Vice President - Licensing Vogtle Project Office of the Consumers' Utility Council Georgia Power Company /
Suite 225 Southern Company Services,.Inc.
32 Peachtree Street, N.W.
P.O. Box 2625 Atlanta, Georgia 30303
.i Birmingham, Alabama 35202 James E. Joiner Mr. Paul D. Rice Troutman, Sanders, Lockerman, Vice President & Project General Manager
& Ashmore 1
Georgia Power Company Candler Building Post Office Box 299A, Route 2 127 Peachtree Street, N.E.
Waynesboro, Georgia 30830 Atlanta, Georgia 30303 Danny Feig Mr. J. A. Bailey 1130 Alta Avenue Project Licensing Manager Atlanta, Georgia 30307 Southern Company Services, Inc.
P.O. Box 2625 Carol Stangler Birmingham, Aiabama 35202 Georgians Against Nuclear Energy 425 Euclid Terrace Ernest L. Blake,'Jr.
Atlanta, Georgia 30307 l
Bruce W. Churchill, Esq.
'i Shaw, Pittman, Potts and Trowbridge 2300 N Street, N. W.
Washington, D. C.
20037 Mr. G. Bockhold, Jr.
Vogtle Plant Manager Georgia Power Company Route 2, Box 299-A Waynesboro, Georgia 30830 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. R. E. Conway -
Senior Vice President and Project Director Georgia Power-Company Rt. 2, P. O. Box 299A j
Waynesboro, Georgia 30830 I
- -