1
@h. .
$
-
Ub ;,'
@,
?W; ,
R gp -y
gp *
hh
i
'fl0V 191987
>
,
\\
1
^
- Dock'et Nos. 50-245
50-336
'
Northeast Nuclear Energy Company
ATTN: Mr. E. J.lMroczka
-
Senior Vice President - Nuclear
M'
_
Engineering and 0perations Group
HP..O.' Box 270
'
.
. Hartford, Connecticut 06141-0270'
, ,.
l
Gentlemen:
'
'
>
s
L
Subject:
Inspection Report Nos. 50-245/87-17 and 50-336/87-15
,
nThis refers'to the routine inspection' conducted by Mr. R. Paolino of this
at-Mill' tone Nuclear Power Station, Units 1 and 2,
Loffice on' July 15 117,.1986
'
s
$laterford, Connecticut and your corporate office at East Berlin, Connecticut,
'
- of' activities authorized by NRC License Nos. OPR-21 and DPE-65 and to.the
'
' discussions'of our findings held by Mr.' R. Paolino with Mr. S. Scace' and other
members of;your staff at the conclusion of. the inspection.
LAfeas' examined during this? inspection are described in the NRC Region I
- Inspection Report which is enclosed with this letter.- Within these areas, the
, inspection consisted of selective-examinations of procedures and representative
recorcs, interviews with personnel, at:1 observations by the; inspector.
- Based on the'.results of thisLinspection, it appears that certain of your
activities were'not" conducted in full compliance with NRC requirements, as set
forth in the Notice of. Violation, enclosed herewith as Appendix A.
These vio-
lations' have .been categorized by severity' level in accordance with the " General
Statement ~~of Policy and Procedure for NRC Enforcement Actions," 10 CFP Part 2,
- Appendix C;(Enforcement Policy 1987). You are required to respond to this
. letter and'in preparing your response, you should. follow the instructions in
Appendix A. . In addition, your : staff identified and corrected two other-
Equipment! Qualification-(EQ) deficiencies (Ideal wire nuts in Limitorque
..
Evalues and spray pump motor-terminations). -We.are considering appropriate
"
enforcement action for these two items and will inform you of our decision in
f
the future.
The responses' directed by this letter and the accompanying Notice are not
'
subject to the clearance procedures of the Office of Management and Budget
as required by the' Paperwork-Reduction Act of 1980, PL 96-511.
.
.
8711250170 87 g h
ADOCK
pgg
'
,.
q
-
,
0FFICIAL RECORD COPY
IR MILL 87-17/15 - 0001.0,0
gF'0f
1
11/17/87
,
~
+
,l
l
,
,4
=_
-
-
. _-
-
I
.
.
..
.
,
i
Northeast Nuclear Energy Company-
2
1
,
!
Your cooperation with us in this matter is appreciated.
i
Sincerely,
i
i
Original Sic =d By:
William V. Johnston, Acting Director
Division of Reactor Safety
)
Enclosures:
1.
Appendix A, Notice of Violation
'2.
Combined'NRC Region I Inspection Report Nos. 50-245/87-17 & 50-336/87-15
cc w/ encl:
W. D.,Romberg, Vice President, Nuclear Operations
i
S. E. Scace, Station Superintendent
D. O. Nordquist, Manager of Quality Assurance
!
R. M. Kacich, Manager, Generation Facilities Licensing
Gerald GarfieId, Esquire
Public Document Room.(PDR)
i
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief
SRI, Haddam Neck
J. Shedlosky, SRI,-Millstone 3
M. Boyle, LPM, NRR
,
R. Bores, DRSS
l
U. Potapovs, NRR/RVIB
D. Holody, RI
,
,
f
f
RI:DlRS
c ja
C Q
RI:DRS
RI:DRS
hI.0<u
4 Paolino/cgl/rw
Koshy
Anderson
11//7/87-
~ 11/r/ /87
11//7/87
,,[ip/n
OFFICIAL RECORD COPY
IR MILL 87-17/15 - 0001.1.0