Advises That Info Contained in 980605 Application for Amend Request & 980508 Document, Addl Info Re 1.11 Cycle Specific SLMCPR for Fermi-2 Cycle 7, Will Be Withheld from Public Disclosure,Per 10CFR2.790
ML20236R939
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/17/1998
From: Kugler A
NRC (Affiliation Not Assigned)
To: Gipson D
DETROIT EDISON CO.
References
TAC-MA2003, NUDOCS 9807240038
Download: ML20236R939 (3)


Text

-

^

/

[ddh UNITED STATES

't j

NUCLEAR REGULATORY COMMISSION i

WASHINGTON, D.C. sce6Ho01 l

/

July 17, 1998

.....f Mr. Douglas R. Gipson Senior Vice President Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (FERMI 2)(TAC NO. MA2003)

Dear Mr. Gipson:

l By your application dated June 5,1998 (NRC-98-0067), and General Electric Company's (GE's) affidavit executed by Glen A. Watford dated May 8,1998, you submitted an amendment request to revise the Fermi 2 technical specifications to incorporate cycle-specific safety limit minimum critical power ratios (SLMCPRs) for the core that will be loaded during the upcoming refueling outage and requested that Attachment 1, GE Nuclear Energy (GENE) document entitled " Additional Information Regarding the 1.11 Cycle Specific SLMCPR for Fermi-2 Cycle 7," dated May 8,1998, be withheld from public disclosure pursuant to 10 CFR 2.790.

l Your June 5,1998, letter also submitted a nonproprietary version of this GE document.

GE stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

1.

The information discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its ut, by GE's competitors without license from GE l

constitutes a competitive economic advantage over other companies.

2.

The information, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, s'nipment, installation, assurance of quality, or licensing of a similar product.

3.

The information contains detail's of GE's safety limit analysis and the corresponding results which GE has applied to actual core designs with GE's fuel. The development of the methods used in this analysis, along with the testing, development, and approval of the supporting critical power correlation was achieved at a significant cost, on the order of several million dollars, to GE.

We have reviewed your application and the material in accordance with the requirements of f

10 CFR 2.790 end, on the basis of your statements, have determined that the submitted 0

information sought to be withheid contains proprietary commercial information.

l Therefore, the version of the submitted information marked as proprietary (Attachment 1 to your go June 5,1998, application) will be withheld from public disclosure pursuant to 10 CFR N\\

2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

g3my

,ym

  • ~P '

l 1<

nupp l G n 98d7240038 980717 f

PDR ADOCK 05000341

______f

_j PDR

b t

I D. R. Gipson Jr.]y 17, 1998 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the i

consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should L

promptly notify the NRC. You also should understand that the NRC may have cause to review

(

this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination l

adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, ORIGINAL SIGNED BY Andrew J. Kugler, Project Manager Project Directorate !!!-1 Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation Docket No. 50-341 cc: See next page l

DISTRIBUTION:

Docket File PUBLIC PD3-1 Rdg l

E.Adensam (EGA1) j M.P.Siemien l

B. Burgess, Rlli DOCUMENT NAME: G:\\WPDOCS\\ FERMI \\FE980605. PRO T '. receive a copy of this document, Indicate in the boa: "C"a Copy without attachmenvenclosure "E* = Copy with attachment /eresure "N"a No copy OFFICE PM:PD31

,lE LA:PD31 E

BC:SRXB l f)

OGC f

D:PD31 l1r s

NAME AKugler: Wf CJamerson o /

TCollins -rG MPSiemien7 kV?., CACarpenteCh DATE 06/ ls /98' 06/15/98

/)

CGI tw "/98 7 / S /98

') / I 7 /98 OFFICIAL RECORD COPY

[I l

L t

ii

. Mr. Douglas R. Gipson Fermi 2 Detroit Edison Company cc:

i John Flynn, Esquire Senior Attorney Detroit Edison Company.

2000 Second Avenue Detroit, Michigan 48226 Drinking Water and Radiological Protection Division Michigan Department of Environmental Quality 3423 N. Martiri Luther King Jr Blvd P. O. Bcx 30630 CPH Mailroom Lansing, Michigan 4890g-8130 U.S. Nuclear Regulatory Commission Resident inspector s Office 6450 W. Dixie Highway Newport, Michigan 48166 Monroe County Emergency Management i

. Division 963 South Raisinville i

i Monroe, Michigan 48161 l

l Pgional Administrator, Region ill L

U.S. Nuclear Regulatory Commission l

801 Warrenville Road Lisle, Illinois 60532-4351

. Norman K. Peterson f

Director, Nuclear Licensing

- Detroit Edison Company L

I Fermi 2 - 280 TAC 6400 Nodh Dixie Highway Newport, Michigan 48166 Glen A. Watford, Manager Nuclear Fuel Engineering General Electric Company P. O. Box 780 Wilmington, North Carolina 28402 August 1997

,