Forwards Safety Insp Rept 50-293/87-34 on 870804-0914. Corrective Actions in Response to 1985 Violation Re Failure to Perform Required post-maint Testing of Standby Gas Treatment Sys Adequate.Violation Justifed
ML20236R592
Person / Time
Site: Pilgrim
Issue date: 11/18/1987
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20236R594 List:
References
NUDOCS 8711230376
Download: ML20236R592 (2)


See also: IR 05000293/1987034

Text

- .

.

!

NOV 181987:

.

Docket No. 50-293

Boston Edison Company.

)

ATTN: Mr. Ralph G. Bird

Senior Vice President-Nuclear

800 Boylston Street

Boston, Massachusetts. 02199

1

.1

-

,

Gentlemen:

)

1

i

l

Subject:

nspection Report No. 50-293/87-34

'

This refers to the routine safety inspection (50-293/87-34) conducted ' by

Dr. M. McBride, Mr. J. Lyash and Mr. T. Kim of this office 'on August 4, '1987

to September 14,

1987 at the Pilgrim Nuclear Power Station,

Plymouth,

Massachusetts. Areas examined during this inspection are described .in the NRC

Region I Inspection Report which is enclosed with this letter.

We'have reviewed your response to a 1985 violation regarding failure to perform

required post maintenance testing of Standby Gas Treatment ' System.

You

contested the . violation as documented in your response letter dated May 24,

1985 on the basis that no specific time limitation for performance of the test

!

was included in the technical specifications.

As discussed at the exit

interview, we have concluded that this position is not appropriate, and that

the violation was justified.

Your corrective actions taken to date, however,

appear adequate to ensure the timely performance of this testing. Therefore,

no further response is required.

Your cooperation with us in this matter is appreciated.

Sincerely,

brfGDol #

l

i

1

William Kane, Director

Division of Reactor Projects

Enclosure: NRC Region I Inspection Report No. 50-293/87-34

8711230376 871118

PDR

ADOCK 05000293

G

PDR

OFFICIAL RECORD COPY

IR PILGRIM 87-34 - 0001.0.0

11/06/87

'

-h

!

1

Boston Edison Company

2

h

'

ggg

'

cc w/ encl:

R. Bird, Vice President, Nuclear Operations

i

K. Roberts, Station Manager

.

l

Paul Levy, Chairman, Department of Public Utilities

Chairman, Board of Selectmen

J. D. Keyes

3

Plymouth Civil Defense Director

i

Congressman E. J. tiarkey

l

Senator Edward P. Kirby

.

The Honorable Peter V. Forman

j

l

Peter W. Agnes, Assistant Secretary of Pc'oiic Safety,

Commonwealth of Massachusetts

l

Sharon Pollard

Public Document Room (PDR)

!

'

Local Public Document Room (LPDR)

i

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

l

l

bcc w/ encl:

W. Russell, Administrator, Region I

i

]

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

l

DRP Section Chief

j

R. Wessman, LPM, NRR

]

R. J. Bores, DRSS

!

S. J. Collins, DRP

I

,

1

i

DRP

I:DRP

DRP

R

I

,

Lyash/geb/mjd

Blough

Wiggins

?

lins

I

e

%

h 11/6/87

11/(/87

11/h87

11/0/87

11/t,, /87

,

!

0FFICIAL RECORD COPY

IR PILGRIM 87-34 - 0002.0.0

11/06/87

l

,