ML20236R011
| ML20236R011 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 10/31/1987 |
| From: | Reavis J, Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8711230024 | |
| Download: ML20236R011 (12) | |
Text
.__
0FERATING DATA REFORT l
l DDCKET 50-369 DATE
_ __ __- 8 7 11 13 OPERATING STATUS COMPLETED BY J. A. Reavis TELEPHONE 704/373-7567
- 1. Unit Nare: Mc6 LIRE 1
- 2. Reporting Period: OCTOBER 1, 1987-0CT0FER 31, 1987
- 3. Licensed Thereal Power (MWt):
3411 4
f
- 4. Nameplate Rating (Gross MWe):
- 1305, I Notes aNameplate Rating I
- 5. Design Electrical Rating Get MWe):
1180 1 (Bross MWel calculated as 1
- 6. Maxian Dependable Capa:ity (Bross MWe):
1 1450.000 MVA y.90 power i
- 7. Maxian Eependable Capacity met MWe):
1150 i facter per Page iii, I
j
- 8. If Changes Occur in Capacity Ratings (Itess Number 3 Through 71 Since Last I NUREG-0020.
I' j
Report. Eive Reasons:
l._............_...._
__l
- 9. Power Level To Which Restricted, If Any (Net MWe): _ _ _. _
l
- 10. Reason Fct Restrictions, if any: _ _ _.... _., _ _. _ _ _
}
l l
1 This Month Yr.-to-Daie Cumulative
- 11. Hours In Reporting Feried 745.0 7,296.0 51,B64.0
- 12. N nber Of Hours Reactor Was Crit: cal 0.0 5,675.7 35,703.6
- 13. Reactor Reserve Shutdcwn hours
--0--
--0--
--0--
- 14. Hours Eenerater On-Line 0.0 5,615.0 35,242.5
- 15. Unit Rssern Shutdowa Hours
--0--
--0--
-- 0--
- 16. Gress Tiernal Erergy Benerated (MWH) 0 18,762,302 101,716,512
- 17. Ercss Electrical Energy Eererated MWH) 0 6,469,726 35,224,903
- 18. Net Electrical Energy Generated (MWH)
(4,164) 6,232,603 33 549,356 3
- 19. Unit Service Facter 0.0 77.0 60.0 l
- 20. Unit Availability factor 0.0 77F) 60.0
- 21. Unit Capacity Facter (Using MDC Net) 0.0 74.3 55.3 EE. Unit Capacity Factor (Using DER Net) 0.0 72.4 54.8
- 23. Unit Fcrced Outa;e Rate 0.0 5.0 13.2
- 24. Shutdowns Scheduled Over.Next 6 Months (Type, Date, and Duration of Each):
......Gurr en tl y..BAf ue l10 g............... _...... _............. _........ _............................. _.........
\\
- 25. If Shtt Ecwn At End Of Report Period. Estimated Date of Startup:..Np_Vmbar.E.1981................__.........
- 26. Units In Test Status (Prior to Ceasercial Operation):
Forecast Achieved 1
INITIAL CRiilCALITY lhlilAL ELECTRICITY
~ ~ ~ ".. ".... ".. ".. ".
~
COMMERCIAL OPERATICN Mb 8711230024$710315000369 pga ADOCK PDR
))
R
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-369-UN11 ~
McGuire !'
' DATE Noyeeber 13,.1987 COMPLETED BY J. A. Reavis
.TELEFFONE 704-373-7567 1
FCNT4 QCTOBER,1987 DAY AVERAGE DAILY F0WER LEVEL DAY AVERAGE DAILY F0WER LEVEL (MWE-Net)
(MWE-Net) 1 0
17 0
2 0
18 0
3 0
19
-0 4
0 20 0
5 0
21 0
l L
0 22 0
)
7 0
23 0
t j
l 8
0 24 0
9 0
25
.0
. l
___...........=__
10 0
26 0
11 0
27 0
12.
0 EB 0
l l
i l
13 0
29
-0 1
!4 0
30 0
1 1
15 0
31 0
1 l
16
'O 1
(.
_____L_-_L---.--------------------
O t st 6I
)
I C
- at rG U
4 T
N G
reoE 3_G 0
C E
N Gph aepR 0C ~
2 E
R I
eU 5_M_
-.(
ROR L
t eSRN
[ _
RTU E
i r -
-(
O C
U b P 'y t
.E E
CNE F
i rne OM N
OR E
hrt el NA O
DI -
R xonvi N
H NTT EfEEF
)
T EP ACN 4
4 -
M A
P Y
(
KI EL E
V E
CN LE S
E L
O U PT U
R C
O C
C m)
C an F
ri O
mca aSl D
r _ p N
ccx E
SiE t(
S l l a N
aamr O
T d uuoe N
X onnt h I
T E
X h aaut
)
C 2
5 N E L
t MMAO U
8 O D E
e-(
D 2
P O U
M1 234
)
E 1,
M C F
3 R
O
(
r C
R e
ll E
b E
W o
SM D
C
)
O t
4 YE O R
P c
ST C
(
O_
1 D
N A
E S
T S
N TR N
E NO W
H C EP O
)
O T
I VE N
n D
N L ER i
T O
a U
M 1
l H
TN p
S T
TD UW X x
)
R 3 EOF HO
/
1 E
i T
O MHO SD R
(
t t
(
I P
' s N
E ee i
)
U R
2 C
rt REA SO N
u t
(
l r i o N
a -
R O
0 F e I S 0
c TR t ngr 5
AU nanort 4
RO enit os 7
UH mel at it D
pt el an ninuurire 1
ouif gemeh sqaeepd pt
)
TYPE S
aEMRROA 1
e-(
RABCDEFG
)
2
~
1
(
E 0
d e
T 1
A l
D 7
d u 8
ed ce rh oc FS 7
NO FS
)
1 l
II
(
l 1
l I
I DOCKET NO:
50-369 1
UNIT:
McGuire 1 1
DATE:
11/13/87 j
NARRATIVE
SUMMARY
j Month: October, 1987 l
l McGuire Unit 1 was out of service for the entire month of October, due to its end of cycle 4 refueling outage.
1
-i d
1 i
i
-i
.)
l l
i I
l l
u --
i MONTHLY REFUELING INFORMATION REQUEST i
1.
Facility name: McGuire, Unit 1 2.
Scheduled next refueling shutdown:
Currently Refueling 3.
Scheduled restart following refueling:
4.
Will refueling or resumption of operation thereafter require a technical
)
specification change or other licens,e amendment? Yes l
If yes, what will these be?
Technical Specification Revision
'f If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A j
5.
Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies (a) in the core:
193 (b) in the spent fuel pool:
293 8.
Present licensed fuel pool capacity:
1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 1
l DUKE POWER COMPANY DATE:
November 13, 1987 Name of
Contact:
J. A. Reavis Phone:
704-373-7567 1
3
rp
'?
OPERATINS DATA REPORT f
00CLET.
50-370 q
.DATE-11-13-87 1
CFERATING STATUS COMPLETED BY.
J. A. Reavis TLEPHONE 704/373-7567.
4
- 1. Unit Nase: Mc6UIRE 2
- 4
---~--------
2, Reporting Feried: OCTOBER 1,1987-0CTOBER 31,1987 e
- 3. Licensed Thermal Power (MWt):
.3411.
____....2......._
- 4. Naseplate Rating (Bross MWe b 1305*
I Notes
- Nameplate Rating.
.I
)
- 5. Design. Electrical Rating (Net MWe):.1180 1- (6ross MWe) calculated as
.I
- 6. Maximua. Dependable Capacity (Gross MWe):
.I 1450.000 MVA x'.90 power l'
- 7. Maxieue Dependable Capacity (Net MWel:
1150 l~ factor per Page lii, I;
f
- 9. If Changes Occur in Capacity Ratings (Items Nusber 3 Through 7) Since Last l-NUREG-0020..-
I
- l...._...,_...____ _
]
Report. Give Reasons:.__
_.=_
- 9. Power LeYel To Which Restricted,'If any (Net MWe):
- 10. Reason For Eestrictlons, If any: __ _ _,. _ _.,_ _ _,,.. _ _,. _....,_
This' Month Yr.-to-Date Cusulative
- 11. hours In Eeporting Period 745.0.
7,296.0 32,160.0
- 12. Nusber Of Hours Reactor Was Critical 745.0 5,622.1 23,021.1
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
--0--
- 14. Pours Generator On-Line 745.0 5,538.2 22,408.4
- 15. Unit Reserve Shutdown F.ours
--0--
- --0--
-16. Gross Thersal Energy Janeratea (MWH) 2,534,464 17,999,200 72,699,601
- 17. Gross Electrical Er:rgy Generated (MWH) 888,144; 6,304,270 25,494,260
- 18. Net Electrical Ene gy Benerated (MWH) 955,430
--6,054,008-24,417,433'
- 19. Unit Service Fac'or 100.0 75.9
. 69.7.
- 20. Unit Availability Fia. tor 100.0 75.9 69.7
- 21. Unit Capacity Factor (Using MDC Net) 99.9 72.2 65.2
- 22. Unit Capacity Factor (Using DER Net) 97.3
'70.3 64.3
- 23. Unit _ Forced Datage Rate 0.0 3.3 15.5.
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
......N.o..n..e...............................=
........................................ ~........ - = _.
- 25. If Snut Down At End Of Report Period. Estimated Date of Startup:._ _ _...._ _._ _..
f
- 26. Units in Test Status (Prior to Cosmercial Operation):
Forecast
' Achieved
-l 1
i INIilAL CRITICALITY j
-!NITIAL ELECTRICITY COMMERCIAL CPERATION j
1 L
9
9 AVERABE DAILY UNIT POWER LEVEL 1
)
DOCKET NO.
50-370' 1
UNIT
.McGuire 2 j
.................;l DATE November 13i 1987 1
. COMPLETED BY. J. A. Reavis-
.'1 1
=
TELEPHONE 704-373-7567 MONik GCICEER,1987
. DAY AVERA?E DAILY F0WER LEVEL DAY AVERAGE DAILY F0WER LEVEL (MWE-Net)
-(MWE-Net)
)
-l 1
1136 17 1150 1
l
..............=__
i 2
1144 18 1150 I
3 114!
19 -
1150 4
1143 20 1151 5
1143 21 1151 6
1145 22 1151 1
7 1146 23 1152-
-)
B 1147 24 1154 9
1147 25 1154 l
=..
]
l
.10 114B 26 1151-1148 27 115E l
)
g 12 1147 28 1152
)
l 13 1149 1150 14 1148 30 1150-
.....=_
8 I
l-15 1149-31 1150-i t
1 16 1149 i
h l-1 i
i 4
iiI!l ll illlIIi
)
s d
ot n c
nas e
M iae r
_7 O
tDc u
_6.
O c
i o
_ _ _ S5 R
ufL)
S
_I7 ro! R)
_V-L t
rE1 e
_A3 OS snoL6 m
_2_7 E 7 RT noF(
l a
E TI I i O
S 0_E 8 R_3 7_ R [
V E
NN
.t st -
I 3
.)
I C
OU at rG 3__U 1 A_0 4
T N
C reoE
_G [
C E
R G a e pP I
0_C 1 7
E R
FE ph eU 5_M_1_J_(
ROR OL t eSRN t
RTU L
i r
(
i O
C SI bPyt b
.EEYE CNE NH rne i
i OMTBN OR I C hrt el h
NAA O
DI A
xonvi x
NDDH NTT RD EfEEF E
)
)
T EP ACN TN 4
5
(
(
KI EL E
V H
CN LE S
E TN OU PT U
R OO D
M A
P BI O
C T
m)
C FA an 0L ri
.I mca ST
.aSl SN r-p OE ccx LV SiE
~
t(
S l l a N
aamr O
T duuoe I
N R
onnth T
E E
h aaut
)
C 7
5 NE W
tMMAO U
8 OD O
e- - - -
(
D 9
PO L
M1 234
)
E MC B
3 1_
R O
(
r C
R e
n E
b E
o W
o SMD B
i
)
O t
4 YEO W
t P
c STC a
(
O_
n D
i N
m A
E a
S T
x S
NTR E
N ENO W
H CEPO e
)
O T
I VEN n
s D
N LER 2
n i
T O
a e
)
U M
l c
n H
TN p
ni i
S T
)
TD UWX x
oL a
R 3EOFHO/
.E i
l T
O MHOSDR
(
( t t&
p I
P l
s c
x N
E
)
ee ig E
U R
2 A
rt rn
(
REASON u
t i
)
(
l l r snern io eivoi N
a Raira O
Fe rt rl I S c
yT a E p TR t ngr r
UH mel a t'i t D
- pt el anar ninuurire i
ouif gemeh
)
s q a e e pd pt TYPE F
aEMRROAOO 1
(
e-RABCDEFGH
)
2' 1
( ~
E 0
d T
1 e
A l
D 7
du 8
ed ce rh p
oc 1
FS NO 3
FS
)
1 l
i
(
(;ljl!
l(
,I -
)
i l
1 DOCKET NO:
50-370 UNIT:
McGuire 2
)
DATE:
11/13/87 j
1 1
1 NARRATIVE
SUMMARY
Month: October, 1987 McGuire Unit 2 began the month of October operating at 100% full power.
On 1
10/01 at 1842, the unit reduced power to 95% due to a loss of both trains of
]
control room ventilation and chiller units.
The unit began increasing to 100%
power at 2333 on 10/01, where it operated for.the remainder of the month.
l l
l l
~~~
- l o.
MONTHLY REFUELING INFORMATION REQUEST l
-I 1.
Facility name: McGuire,' Unit 2 J
2.
Scheduled next refueling shutdowns. May, 1988 1
3.
Scheduled restart following refueling: August, 1988
- 4.. Will refueling or resumption of operation thereafter require'a technical specification change or other' license amendment? Yes 1
I If yes, what will these be?'
Technical Spec'ification Revision
~
If no, has reload' design and core configuration been reviewed'by Safety Review Committee regarding unreviewed' safety questions? N/A1 1
5.
Scheduled.date(s) for submitting proposed licensing action and supporting I
~
information: N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in l
design or new operating procedures).
7.
Number of fuel assemblies (a) in the core:
193 (b) in the spent fuel pool:
397 8.
Present licensed fuel pool capacity:
1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 i
i DUKE POWER COMPANY DATE:
November 13, 1987 Name of
Contact:
J. A. Reavis Phones 704-373-7567 a
E______.__'______
I l.
1 McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT 1.
Personnel Exposure For the month of September, 48 individuals exceeded 10 percent of their allowable annual radiation doseslimit with the highest dose being 2.040 rem, which represents approximately 17.0% of that person's allowable annual limit..
2.
The total station liquid release for September has been compared'with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station' gaseous release for September has been compared with the Technical Specifications maximum' annual dose commitment and was less than 10 percent of this limit.
-e Duxe POWER GOMPANY P.O. HOX &3160 '
CHARLOTTE. N.C. 28242 HALB. TUCKER TELepnown vmm rar.amarr (704) 073-4831 atme.r.am reonverson November 13, 1987-U. S. Nuclear Regulatory. Commission Atte. tion: Document Control Desk Washington, D. C.
20555 Ao McGuire Nuclear' Station-Docket No. 50-369 and 50-370
Dear Sir:
Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of October, 1987.
Very truly yours, rY Hal B. Tucker JAR /53/sbn Attachment xc:
Dr. J. Nelson Grace, Regional Administrator American Nuclear Insurers J
U. S. Nuclear Regulatory Commission c/o Dottie Sherman, ANI Library Region II The Exchange, Suite 245 l
101 Marietta Street, NW, Suite 2900 270 Farmington Avenue I
Atlanta, Georgia 30323 Farmington, CT 06032 Mr. Phil Ross INPO Records Center a
U. S. Nuclear Regulatory Commission Suite 1500:
]
MNBB-5715 1100 Circle 75 Parkway
)
Washington, D. C.
20555 Atlanta, Georgia 30323 I
Mr. Darl Hood, Project Manager Mr. Richard G. Oehl, NE-44 j
Office of Nuclear Reactor Regulation
.U. S. Department of' Energy U. S. Nuclear Regulatory Commission 19901 Germantown Road' Washington, D. C.
20555 Germantown,' Maryland 20874-d Ms.. Judy Dovers
'Mr.
W...T. Orders
.j Nuclear Assurance Corporation NRC Resident Inspector 5720 Peachtree Parkway McGuire Nuclear Station Norcross, Georgia.30092-ZE'Y i
y
_oft
"