ML20236Q967

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-416/98-08 on 980517-0627.No Violations Noted.Conduct of Activities Was Generally Characterized by safety-conscious Operations W/Strong Maint & Engineering Practices & Careful Radiological Work Controls
ML20236Q967
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/14/1998
From: Tapia J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hagan J
ENTERGY OPERATIONS, INC.
Shared Package
ML20236Q970 List:
References
50-416-98-08, 50-416-98-8, NUDOCS 9807210157
Download: ML20236Q967 (5)


See also: IR 05000416/1998008

Text

-

- _ _ _ _ _

.


'

l

l

a "I Go,

k

UNITED STATES

is

.'t

NUCLEAR REGULATORY COMMISSION

l

REGION IV

e,

- t

D

E

611 RYAN PLAZA DRIVE, SUITE 400

%,,

AR LINGTON, TEXAS 76011-8064

.....

JUL I 41998

Joseph J. Hagan, Vice President

Operations - Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

SUBJECT: NRC INSPECTION P.EPORT 50-416/98-08

Dear Mr. Hagan:

From May 17 through June 27,1998, an NRC inspection was conducted at your Grand Gulf

Nuclear Station reactor facility. The enclosed report presents the scope and results of that

inspection.

During the 6-week period covered by this inspection, your conduct of activities at Grand Gulf

was generally characterized by safety-conscious operations with strong maintenance and

engineering practices and careful radiological work controls.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely

,

l

C

seph I. Tapia, C ef

Project Branch A

!

Division of Reactor Projects

!

Docket No.:

50-416

License No.: NPF-29

1

!

Enclosure:

'

NRC inspection Report

l

50-416/98-08

9807210157 900714

PDR

ADOCK 05000416

G

PDR

- - _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _

.

O

Entergy Operations, Inc.

-2-

l

l

l

l

cc w/ enclosure:

1

Executive Vice President

and Chief Operating Officer

Entergy Operations, Inc.

i

P.O. Box 31995

Jackson, Mississippi 39286-1995

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

l

Winston & Strawn

1400 L Street, N.W. - 12th Floor

Washington, D.C. 20005-3502

Sam Mabry, Director

Division of Solid Waste Management

- Mississippi Department of Natural

Resources

P.O. Box 10385

Jackson, Mississippi 39209

President

Claiborne County Board of Supervisors

Port Gibson, Mississippi 39150

General Manager

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

The Honorable Richard Leyoub

Attorney General

Department of Justice

State of Louisiana

P.O. Box 94005

Baton Rouge, Louisiana 70804-9005

Office of the Governor

State of Mississippi

Jackson, Mississippi 39201

_ _____- _______-______ - ____

_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ - - -

,

.

Entergy Operations, Inc.

-3-

Mike Moore, Attorney General

Frank Spencer, Asst. Attorney General

State of Mississippi

P.O. Box 22947

Jackson, Mississippi 39225

Dr. F. E. Thompson, Jr.

State Health Officer

State Board of Health

P.O. Box 1700

Jackson, Mississippi 39205

Robert W. Goff, Director

State Liaison Officer

Division of Radiation Health

Mississippi Department of Health

P.O. Box 1700

Jackson, Mississippi 39215-1700

Vice President

Operations Support

Entergy Operations, Inc.

j

.

P.O. Box 31995

Jackson, Mississippi 39236-1995

Director, Nuclear-Safety

and Regulatory Affairs

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

Vice President, Operations

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

l

l

l

l

L

I

_ _ _ -

.

.

Entergy Operations, Inc.

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

DRS-PSB

Branch Chief (DRP/A)

MIS System

Project Engineer (DRP/A)

RIV File

Branch Chief (DRP/TSS)

l

l

l

DOCUMENT NAME: R:\\ GG\\GG808RP.JLD

To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV: SRI:DRP/A

RI:DRP/A I

DRS/PS

C:DRP/An

.

JLDixon-Herrity

PJAlter fu A.1{ BMurray f.d JITapia (B )_

l

074Q98 .kAR%uyVI 07/H/98

07 $ 8

07/W8

'

(v

OFFICIAL RECORD COPY

U

1

.

- _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ - _ _ - - _

- _ _ _ _ _ _ - _

.

?

i

.

Entergy Operations, Inc.

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

l

E-Mail report to NRR Event Tracking System (IPAS)

j

E-Mail report to Document Control Desk (DOCDESK)

l

E-Mail report to Richard Correia (RPC)

l

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

l

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

DRS-PSB

Branch Chief (DRP/A)

MIS System

,

l

Project Engineer (DRP/A)

RIV File

Branch Chief (DRP/TSS)

l

l

!

l

i

!

.;y C 1.Us

i

DOCUMENT NAME: R:\\_GG\\GG808RP.JLD

To receive copy of document, indicate in box:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

l

RIV: SRI:DRP/A

RI:DRP/A

DRS/PS

C:DRP/Afs

,

JLDixon-Herrity

PJAlter i e

BMurray C d JITapia M }_

,

07/ 498 /

'"t

07/-/98

07AR98

07/ltM8

C

OFFICIAL RECORD COPY

U

!

l