ML20236Q928
| ML20236Q928 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 07/14/1998 |
| From: | Curry D External (Affiliation Not Assigned) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20236Q930 | List: |
| References | |
| NUM2-PPNR-1750, NUDOCS 9807210126 | |
| Download: ML20236Q928 (1) | |
Text
.
l f, 4 ~
l-
[. '
l
. A' '
~
[
1
'~
n ':A
- 4 4' ' '"
(
PAFISONS Daniel L. Curry, vce Premdent. Nucles Servn:es Farsons Power Group loc.
Io/S Morgantown fload e Reading. Pennsylvania 19607 * (610) 855-23G6 = Fax: (610) 855-2602 July 14,1998 Docket No. 50-336 Parsons NUM2-PPNR-1750 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Millstone Nuclear Power Station Unit No. 2 Independent Corrective Action Verification Proaram (ICAVP)
Gentlemen:
This letter transmits Revision 4 of Project Procedure PP-01, " System Vertical Slice Review". The attached revision to PP-01 replaces Revision 3 in its entirety. This revision incorporates additional changes required to reflect the current methodology employed in the resiew.
This letter also transmits Revision 4 of System Vertical Slice Review (SVSR) Project Instruction PI-01, "SYSR Implementation Checklists and Workbook". The attached revision to PI-01 replaces Resision 3 in its entirety. The changes include editorial changes to reflect PP-01 changes, revision to Form 3 to reflect change in approach to non-safety instrumentation review requirements, Form 4 Corrective action resiews review questions, Fonn 7 Modification Review Checklist question revisions and Form 10 Walkdown review and documentation process.
Please call me at (610) 855-2366 if you have any questions.
Sincerely, G4 Daniel L. Curry Parsons ICAVP Project Director DLC:djv
' Attachments
[
ec:
E. Imbro (2)- USNRC R. Laudenat - NNECo J. Fougere - NNECo Rep. Terry Concannon -NEAC
- h b '/
9807210126 980714 PDR ADOCK 05000336 P