ML20236Q830
| ML20236Q830 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 10/31/1987 |
| From: | Alden W, Middleton L PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), NRC OFFICE OF ENFORCEMENT (OE) |
| References | |
| NUDOCS 8711200309 | |
| Download: ML20236Q830 (14) | |
Text
-_
'O'c y
NRC Monthly Operations Summiary Peach Bottom Atomic Power Station October, 1987 UNIT 2 Unit 2 remained shutdown throughout'the report period in compliance with the NRC Shutdown Order, with refuel and maintenance activities in progress. Major activities during the report period consisted of feedwater long path recirculation valve modification E-1 and E-3 diesel generator annual maintenance, and E-12'and E-13 erergency bus preventive maintenance.
Unit 3 Unit commenced its seventh' refueling outage ard major pipe replacement on October 1.. Reactor vessel head detentioning was completed on October 4, and the node switch was placted in the ' REFUEL' position on October 5 to accommodate
. vessel disassembly. Core offload was initiated on October 14, and was completed on October 28 following two delays caused by problems with the refueling platfonn.
l l
Dk 0$CK05000277 09 071031 R
J { Q,, Li PDR
'\\
a
c' Docket No. 50-277 Attachment to Monthly Operating Report for October, 1987 UNIT 2 REFUELING INFORMATION l '.
Name of. facility:
Peach Bottom Unit 2 2.'
Scheduled date for next refueling shutdown:
Reload 7 in progress 3.
Scheduled'date for restart following refueling:
Indeterminate due to Shutdown Order 4.
Will refueling or resumption of' operation thereafter require a technical specification change or other license amendment?
Yes If answer is yes, what -in general, will these bo?
Modifications to reactor core operating limits. Reload 7 amendment issued September 11, 1987.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
Reload 8 license amendment to be submitted January 1989.
6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None expected.
'7.
The number of fuel assemblies (a) in the core and (b).in the spent fuel storage pool:
(a) Core-764FuelAssemblies,CoreOffloadedDuringOutage
.(b) Fuel Pool - 1462 Fuel Assemblies, 58 fuel Rods
~ 8.
The present licensed. spent fuel pool storage capacity and the size of any
' increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
=__-. _ _
1
Docket No. 50-277 Attachment to Monthly Operating.
Report for October, 1987 Page 2 UNIT 2 REFUELING INFORMATION (Continued) 9.
The projected date of the last refueling that can he discharged to the spent > fuel pool assuming the present. capacity:
March,1998 (March 1995, with reserve full' coredischarge).
l l
o I
l l
i
)
Docket No. 50-278 Attachment to Monthly Operating Report for October, 1987 UNIT 3 REFUELING INFORMATION 1.
Name of facility:
Peach Bottom Unit 3 2.
Scheduled date for next refueling shutdown:
Reload 7 in progress (Major Pipe Replacement Outage) 3.
Scheduled date for restart following refueling Indeterminate due to Shutdown Order 1
4.
Will refueling or resumption of operation thereafter require-a technical specification change or other license amendment?
Yes.
l If answer is yes, what, in general, will these be?
Technical Specifications to accomodate reload fuel. Modifications to reactor core operating limits.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
Reload 7 License Amendment to be submitted March 11, 1988 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or perfomance analysis methods, significant changes in fuel design, new operating procedures:
l None expected.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 fuel Assemblies (b) fuel Pool - 1496 fuel Assemblies, 6 Fuel Rods i
Docket No. 50-278 Attachment to Monthly Operating Report for October, 1987 Page 2 UNIT 3 REFUELING INFORMATION (Continued) 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. This modification began on February 20, 1987. The completion date for this modification has been rescheduled for February, 1989 to accommodate the Unit-3 pipe replacement outage.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity, prior to the completion of the new fuel racks installation:
March, 1993 (reserve full core discharge cannot be accommodated af ter the restart following the completion of the October,1987 refueling outage until the completion of the new fuel racks) 10.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the relicensed capacity, subsequent to the completion of the new fuel racks installation:
' March, 1999 (March, 1996, with reserve full core discharge) l
p AVERAGE DAILY UNIT POHER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM LR!IT 2 DATE NOVEfSER 15, 1987 COMPANY PHILADELPHIA ELECTRIC COMPANY L. L. MIDDLETON TECHNICAL ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTHENT TELEPHONE ( 215) 841-6374 MONTH DCTOBER 1987 DAY AVERAGE DAILY P0HER LEVEL DAY ' AVERAGE DAILY POHER LEVEL (NHE-NET)
(tNE-NET) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 D
0 0
25 0
10 0
26 0
11 0
27 0
l I
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
1 l
l 1
l l
i I
+
AVERAGE DAILY UNIT P0HER LEVEL DOCKET NO. 50 - 270 UNIT PEACH BOTTOM UNIT 3 i
1 DATE NOVEMBER 15, 1987
)
COMPANY PHILADELPHIA ELECTRIC COMPANY 1
f l
L. L. MIDDLETON i
TECHNICAL ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTMENT I
TELEPHONE (215) 841-6374
)
MONTH OCTOBER 1987 DAY AVERAGE DAILY PONER LEVEL DAY AVERAGE DAILY POHER LEVEL (FME-NET)
(PHE-NET) 1 0
17 0
2.
0 10 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
i 0
0 25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
l l
15 0
31 0
l 10 0
)
\\
l
d OPERATING DATA f;EPORT
-:/
DOCKET No. 50 - 277 1
l s
DATE NOVEMBER 15, 1987 i
?
. = = = - -
COMPLETED BY PHILADELPHIA ELECTRIC COMPANY L. L. MIDDLETON TECHNICAL ASSISTANT j
LICENSING SECTION J
NUCLEAR SUPPORT DEPARTMENT l
l TELEPHONE ( 215) 641-6374
)
=--
OPERATING STATUS
==_
- 1. UNIT NAME PEACH BOTTOM UNIT 2 l HOTES: UNIT 2 REMAINED SHUTDOHN l
)
l l
........ = - - -
- 2. REPORTING PERIODi DCTOBER, 1987 l
UNDER NRC ORDER HITH l
l l
- 3. LICENSED THERMAL P0HERtiNT):
3293 I
REFUEL ACTIVITY CONTINUING.
l l
l
- 4. 7:AMEPL ATE RATING (GROSS MHE)*
1152 l
l l
l l
S. DESIGN ELECTRICAL RATING (NET MHE ):
1065 l
l 1
l l
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MNEls 1098 l
l l
l
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MHE):
1051 l
l S. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONSI
- 9. PDHER LEVEL TO MdICH RESTRICTED, IF ANY INET MHE):
- 10. REASONS FOR RES1RICTIONS, IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE-
- 11. HOURS IN REPORTING PERIOD 745 7,296 116,808
- =.
... = = = - -
- 12. NUMBER OF HOURS REACTOR HAS CRITICAL 0
1,729.8 74,196.8
- 13. REACTOR RESERVE SHUTDOHN HOURS 0.0 0.0 0.0
...===_
- 14. HOURS GENERATOR DN-LINE 0.0 1,724.0 71,866.8
- 15. UNIT RESERVE SHUiDOHN HOURS 0.0 0.0 0.0
=
.......=_
- 16. GROSS THERMAL ENERGY GENERATED (MHH) 0 4.979,37f 212,010,745
- 17. GROSS ELECTRICAL ENERGY GENERATED (MHH) 0 1,648,230 70,019,230
- 13. NET ELECTRICAL ENERGY GENERATED (MHH)
-5,107 1,560,271 67,049,131
..=__
PAGE 1 0F 2
j l
OPERATING DATA REPORT (CONTINUED)
DOCKET No. 50 - 277 DATE NOVEfSER 15, 1987 THIS MONTH YR-TO-DATE
.. CUMULATIVE
- 19. UNIT SERVICE FACTOR 0.0 23.6 61.5
- 20. UNIT AVAILABILITY FACTOR 0.0 23.6 61.5
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 20.3 54.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 20.1 53.9 l
- 23. UNIT FORCED OLTTAGE RATE 0.0 42.9 14.6 2',. SHUTDOH43 SCHEDULED DVER NEXT 6 HONTHS ITYPE, DATE, AND DURATION OF EACH)8 1'
REFUELING OUTAGE
- 25. IF SHUTDOHN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP8 INDETERMINATE DUE TO SHUTDOWN ORDER OF 3/31/87.
- 25. UNITS IN TEST STATUS (PRIOR TO CottiERCIAL OPERATION)8 FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 COMMERCIAL OPERATION 07/05/74 PAGE 2 0F 2
- - NEGATIVE VALUE REPORTED FOR CONSISTENCY HITH FEDERAL ENERGY REGULATORY COMMISSION REPORTS.
g
,.s
.i
+
i-..
OPERATIN3 DATA REPORT g g s.
K 1
1 DOCKET No. 50 - 278
'j 1
DATE NOVEPSER 15, 1987
~Y COMPLETED BY PHILADELPHIA ELECTRIC COMPANY I
a q
r L. L. MIDDLETON j
TECHNICAL ASSISTANT j
LICENSING SECTION
.j PAJCLEAR SUPPORT DEPARTMENT TELEPHONE (215) 841-6374 OPERATING STATUS 1.-UNIT NAME8' PEACH BOTTOM UNIT 3:
1 NOTES UNIT 3 REMAINED SHUTDO W l
l.
l
-2. REPORTING PERIODI. OCTOBER, 1987 l
UNDER NRC ORDER NITH l
.................__...___..- l l
3.' LICENSED THERMAL PONERI M T14' 3293. I REFUEL AND PIPE REPLACEMENT l
- l l
- 4. NAMEPLATE RATING (GROSS ME):
1152 l
IN PROGRESS.
l l
l
- S. DESIGN ELECTRICAL RATING (NET 994E )*
1065
'l l
l l.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS ME18 '1098
'l l~
l l
- 7. MAXIPAJM DEPENDABLE CAPACITY (NET 99tE )*
1035 l
l 4.' IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUPSER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONSI
- 9. PONER LEVEL TO HHICH RESTRICTED, IF ANY (NET P94E )8
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 745 7,296 112,704
- 12. NUPSER OF HOURS REACTOR NAS CRITICAL 0
1,824.9 76,357.4
- 13. REACTOR RESERVE SHWDOW HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 0.0 1,659.6 73,929.3
- 15. UNIT RESERVE SHWDO>tl HOURS 0.0 0.0 0.0
' 16. GROSS THERMAL ENERGY GENERATED IMNH) 0 4,759,248 215,278,901
- 17. GkOSS ELECTRICAL ENERGY GENERATED (mH) 0 1.555,560 70,611 432
- 13. NET ELECTRICAL ENERGY GENERATED (MH)
-5,107 1,468,077 67.710,170 PAGE 1 0F 2
[,V
- 7;,
n.
OPERATING DATA REPORT (CONTIt4AED)
. DOCKET No. 50 - 278 l
I
. i DATE NOVEt9ER 15, 1987
' THIS MONTH :'
'YR-TO-DATE CUPSJLATIVE
- 19. UNIT SERVICE FACTOR 0.0 22.7 65.6 220'." UNIT' AVAILABILITY FACTOR 0.0 22.7 65.6-
[.
i l 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 19.4 58.0 I
'1
- 22. (MIT CAPACITY FACTOR (USING. DER NET) 0.0 18.9-56.4
- 4 I
a
- 23. UNIT FORCED OUTAGE RATE.
0.0 74.7.
13.3
' 24. SHLTTDOWS SCHEDULED OVER NEXT 6 M0ffrHS ITYPE, DATE,' AND DURATION OF EACH)2 l
INDETERMINATE LNTIL NRC ORDER IS SATISFIED.
25.. IF SHUTDOWN AT END OF REPORT PERIOD,' ESTIMATED DATE OF STARTUP8 L 26. UNITS IN TEST STARJS (PRIOR TO C0f9fERCIAL* 0PERATION)$'
" FORECAST. ' ACHIEVED-INITIAL CRITICALITY 08/07/74 nINITIAL ELECTRICITY 09/01/74 CotttERCIAL OPERATION 12/23/74
. q PAGE 2 0F 2
__w
j;
-n
};
):l
' UNIT SHUTDO W S AND PONER REDUCTIONS DOCKET No. ED'- E77-UNIT NAME PEACH BOTTOM UNIT 2
'DATE NOVEtBER 15,~ '1987 '
REPORT HONTH OCTOBER, 1987 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY-L. L. MIDDLETON-TECHNICAL ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTHENT
-TELEPHONE (215) 841-6374
.l l
l l
l ~ METHOD OF l LICENSEE ISYSTEHlCOMPONENTl CAUSE AND CORRECTIVE 11
- lTYPElDURATIONIREASONISHUTTING DOM 41 EVENT l CODE l CODE I ACTION TO l
No.1 DATE,1 (1)I (HOURS)l ( 2 )' l REACTOR ( 3 ) l REPORT 4 l (4) 1 (5) l PREVENT RECURRENCE l-l I
I I-1 I
i I
7 l 871001 i S'l 745.0 i C i 1
-l N/A l RC l FUELXX ' l CONTINUATION OF REFUEL ACTIVITY I
I I ----
.I I
I l
l l
1^
l-l 745.0-.l' 1
I l
l l
(1)
-(2)
(3)
(4)
F - 70RCED REASON HETHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1. MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - HANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER).
D - REGULATORY RESTRICTION 4 - DTHER IEXPLAIN)
FILE INUREG-D161)
E - OPERATOR TRAINING + LICENSE EXAMINATION l:
F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - DTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE I
J l
l l
I 1
h I
U
__=
m WJfys,}
3 s,
')
/
p't1.(L 71 i-1p, li
lll y - ~
j r
i e
J
'3-
.j UNIT SHUTDOWNS AND PONER REDUCTIONS DOCKET NO. 50 - 278 i
UNIT NAME PEACH B01 TOM UNIT 3 DATE NOVEPSER.15,1987 -
REPORT MONTH. OCTOBER, 1987 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY-L. L. MIDDLETON TECHNICAL ASSISTANT
[
LICENSING SECTION 4
"l NUCLEAR SUPPORT DEPARTMENT
-TELEPHONE (215) 841-6374 l1 l'-
.l
.l-l' ll METHOD OF
- l. LICENSEE ISYSTEMICOMPONENTl CAUSE AND CORRECTIVE
[ ' l -:
llTYPEIDURATIONlREASONISHUTTING DODNl EVENT l CODE I' CODE I ACTION TO-lND.l-[ DATE ll (Ill (HOURS)l, (2) l REACTOR (3) l REPORT # 1 (4) l
- 15) l PREVENT RECURRENCE Al
'l I
'I.
I I
I l
l~
7'l C71001 1 S I 745.0 1 C 'il 1-l N/A
~l RC --l FUELXX I SHUTDOWN OF THE' UNIT FOR ITS SEVENTH
- Ia l'
-l l
l l
l l
l REFUELING OUTAGE' l"
l_
l ----- I l'
l l
l-l
[1 l '
I
.I 74s.0 1 1,
i 1
.l l
(1)
(2)
(3)
(4)
- 1.,
!F'- FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS i
l lS - SCHEDULED' A - EQUIPMERI FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA i
B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICEPGEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVEKr REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE 15)
)
0 - OPERATIONAL ERROR (EXPLAIN)
H.OTHER(EXPLAINI EXHIBIT I - SANE SOURCE i
l l'
]+-l_.-_.----_-__-_-__-_-___
PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA A PA.19101 (215)841 4000 November 16, 1987 Docket Nos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk
SUBJECT:
Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:
Attached are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of October 1987, forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.
Very truly yours.
W. M. Alden Engineer-In-Charge Licensing Section Nuclear Support Department Attachment cc:
W. T. Russell Administrator, Region I. USNRC T. P. Johnson, PBAPS Resident Inspector S. P. Mangi. Dept. of Envir. Resources P. A. Ross, NRC (2 copies)
R. E. Martin, NRC Project Manager Thomas Magette, Maryland Power Plant Siting INPO Records Center r524
-