|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARBW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With ML20209H7481999-05-31031 May 1999 Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2 BW990021, Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With BW990016, Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With BW990010, Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With BW990004, Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With1999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With BW990001, Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With BW980076, Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With ML20195D3561998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Braidwood Generating Station,Units 1 & 2.With ML20155C2601998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Braidwood Generating Station,Units 1 & 2 ML20151X6671998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Braidwood Generating Station,Units 1 & 2.With ML20237A1091998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Braidwood Generating Station,Unit 1 & 2 ML20236N7001998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Braidwood Generating Station,Units 1 & 2 ML20249A5451998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Braidwood Generating Station Units 1 & 2 ML20247L7591998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Braidwood Generating Station,Units 1 & 2 ML20216C6621998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Braidwood Generating Station,Units 1 & 2 ML20217Q1951998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Braidwood Generating Station,Units 1 & 2 ML20202C6431998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Braidwood Generating Station,Units 1 & 2 ML20198J7091997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Braidwood Generating Station,Units 1 & 2 ML20202H6231997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Braidwood Generating Station,Units 1 & 2 ML20199D0781997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Braidwood Generating Station,Units 1 & 2 ML20217G1571997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Braidwood Generating Station,Units 1 & 2,covering Period 970901-970930 ML20216C2931997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Braidwood Generating Station,Units 1 & 2 ML20198F0321997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Braidwood Generating Station,Units 1 & 2 ML20140C6271997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Braidwood Generating Station,Units 1 & 2 ML20148B2411997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20137N9971997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20136B4371997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20138J9891997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20133E1641996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Braidwood Nuclear Power Station,Unit 1 & 2 ML20132B9511996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Braidwood Nuclear Power Station,Unit 1 & 2 ML20134G8341996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Braidwood Nuclear Power Station,Unit 1 & 2 ML20128K2631996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Braidwood Nuclear Power Station Units 1 & 2 ML20117K7451996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Braidwood Nuclear Power Station Unit 1 & 2 ML20116M6171996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Bs Nuclear Power Station,Units 1 & 2 ML20115B0731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Bs ML20117K4761996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Braidwood Nuclear Power Station Units 1 & 2 ML20117D6991996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Braidwood Nuclear Power Station Units 1 & 2 ML20101N8121996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Braidwood Nuclear Power Station,Units 1 & 2 ML20100Q7161996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Braidwood Units 1 & 2 ML20100Q7051996-01-31031 January 1996 Revised Monthly Operating Rept for Jan 1996 for Braidwood Unit 1 ML20097D4171996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Braidwood Nuclear Power Station ML20100Q7021995-12-31031 December 1995 Revised Monthly Operating Rept for Dec 1995 for Braidwood Unit 1 ML20096E6191995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Braidwood Nuclear Power Station Units 1 & 2 ML20095F0481995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Braidwood Nuclear Generating Station ML20094H1031995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Braidwood Nuclear Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G9961999-10-14014 October 1999 SER Accepting First 10-year Interval Inservice Insp Requests for Relief for Plant,Units 1 & BW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With ML20217P6351999-09-29029 September 1999 Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A7441999-09-10010 September 1999 Safety Evaluation Concluding That Alternatives Contained in Relief Request 12R-07 Provide Acceptable Level of Quality & Safety BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With ML20210R6421999-08-13013 August 1999 ISI Outage Rept for A2R07 ML20210U8111999-08-0404 August 1999 SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval Because Relief Applies to Valves Not Required by 10CFR50.55a BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With ML20210K9861999-07-30030 July 1999 Safety Evaluation Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20216D3841999-07-12012 July 1999 Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function M990002, Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function1999-07-12012 July 1999 Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With ML20209H7481999-05-31031 May 1999 Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2 ML20207B6481999-05-25025 May 1999 SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations BW990021, Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With BW990016, Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With ML20205C5101999-03-21021 March 1999 Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections ML20196A0721999-03-16016 March 1999 Cycle 8 COLR in ITS Format & W(Z) Function ML20207J4371999-03-0808 March 1999 ISI Outage Rept for A1R07 ML20204H9941999-03-0303 March 1999 Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations BW990010, Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With ML20206U9011999-02-15015 February 1999 COLR for Braidwood Unit 2 Cycle 7. Page 1 0f 13 of Incoming Submittal Was Not Included BW990004, Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With1999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with BW990001, Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With ML20206B4001998-12-31031 December 1998 Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors for Byron & Braidwood Stations ML20206U9081998-12-17017 December 1998 Cycle 8 COLR in ITS Format & W(Z) Function BW980076, Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB ML20195D3561998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Braidwood Generating Station,Units 1 & 2.With ML20155B6711998-10-26026 October 1998 Safety Evaluation Accepting Requests for Relief Associated with Second 10-yr Interval ISI Program Plan ML20207H7671998-10-0505 October 1998 Rv Weld Chemistry & Initial Rt Ndt ML20154D4401998-10-0202 October 1998 Safety Evaluation Authorizing Second 10-yr Interval ISI Program Request for Relief 12R-30 for Plant,Units 1 & 2 ML20155C2601998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Braidwood Generating Station,Units 1 & 2 ML20195F5911998-09-11011 September 1998 Special Rept:On 980812,addl Unseated Wires Were Discovered. Cause Is Unknown at Present Time.Util Evaluated Number of Unseated/Ineffective Wires & Determined Effect on Containment Structural Integrity.Commitments,Encl ML20196B3711998-09-0808 September 1998 Cycle 8 Operating Limits Rept (Olr) ML20151X6671998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Braidwood Generating Station,Units 1 & 2.With ML20238F3281998-08-31031 August 1998 SER Approving Second 10-year Interval Inservice Insp Program Request for Relief 12R-14 for Braidwood Station,Units 1 & 2 ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20237A1091998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Braidwood Generating Station,Unit 1 & 2 ML20236N7001998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Braidwood Generating Station,Units 1 & 2 ML20198A0151998-06-18018 June 1998 10CFR50.59 Summary Rept 960619 Through 980618, Vols I & Ii,Consisting of Descriptions & SE Summaries for Changes to Procedural UFSAR Changes,Tests & Experiments & FP Rept.Without Fp,Rept ML20249A5451998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Braidwood Generating Station Units 1 & 2 ML20247F7711998-05-0808 May 1998 Special Rept:On 980403 & 980503 Seismic Monitoring Sys Was Declared Inoperable.Caused by 5-volt Power Supply & Regulator Card Failure.Imd & Sys Engineering Are Continuing to Identify & Resolve Problems So Sys Can Be Operable ML20247L7591998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Braidwood Generating Station,Units 1 & 2 ML20217K6331998-04-20020 April 1998 Safety Evaluation Accepting Methodology & Criteria Used in Generating Flaw Evaluation Charts for RPV of Braidwood IAW Section XI of ASME Code ML20216C6621998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Braidwood Generating Station,Units 1 & 2 1999-09-30
[Table view] |
Text
_ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ - . . _ .
.1 ,,
I 1
l BRAIDH000 NUCLEAR P0HER STATION UNIT 1 MONTHLY PERFORMANCE REPORT COMMONWEALTH EDISON COMPANY NRC DOCKET NO. 050-456 LICENSE NO. NPF-72
$[k" R
Doc ! [
(4957z) t .
t-i
I.- Monthly Report for Braidwood Unit 1 3 A. Summary of Operatina Experience The unit entered the month of October at 49% reactor ;
power. On October 2, the power level was reduced to 30% '
for four (4) days of power ascension testing. An unplanned reactor trip took' place on October 9 during turbine valve surveillance testing. Control rods were manually inserted on October 15 shortly after returning to l criticality due to a rod position indication problem. .The.
unit. was 're-synchronized to the grid on October 16. On-October 26, reactor power was increased to 75%. Reactor power was reduced to 60% on October 30 due to stator .
cooling concerns and remained there through the end of the '
month. ,
i l
(4957z)
1 B. OPERATING DATA REPORT DOCKET NO.: 50-456 UNIT: Braidwood 1 DATE: 11/10/87 COMPILED BY: B. M. Peacock TELEPHONE: (815)458-2801 ext. 2480 OPERATING STATUS
- 1. Reporting Period: October, 1987 Gross Hours: 745.0 i
- 2. Currently Authorized Power Level (HWt): 3411 Design Electrical Rating (HWe-gross): 1175 Design Electrical Rating (HWe-net): 1120 Max Dependable Capacity (MWe-gross): 1175 Max Dependable Capacity (MWe-net): 1120
- 3. Power level to which restricted (If Any): None
- 4. Reasons for restriction (If Any): None THIS HONTH YR TO DATE CUMULATIVE
- 5. Report period Hours: 745.0 2689.0 2689.0
- 6. Hours Reactor Critical: 585.6 1645.5 1645.5
- 7. RX Reserve Shutdown Hours: 0.0 0.0 0.0
- 8. Hours Generator on Line: 570.8 1235.6 1235.6
- 9. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
- 10. Gross Thermal Energy (HWH): 933567 1619440 1619440
- 11. Gross Elec. Energy (MHH): 297984 461103 461103 _
- 12. Net Elec. Energy (MWH): 268464 374656 374656
- 13. Reactor Service Factor: N/A N/A N/A
- 14. Reactor Availability Factor: N/A N/A N/A
- 15. Unit Service Factor: N/A N/A N/A
- 16. Unit Availability Factor: N/A N/A N/A
- 17. Unit Capacity Factor (MDC net): N/A N/A N/A
- 18. Unit Capacity Factor (DER net): N/A N/A N/A
- 19. Unit Forced Outage Rate: N/A N/A N/A
- 20. Unit Forced Outage Hours: 174.1 1258.1 1258.1
- 21. Shutdowns Scheduled Over Next 6 Months:
November 16, 1987 - I day maintenance outage Dgcember 19. 1987 - 6 week surveillance outaae
- 22. If Shutdown at End of Report Period, Estimated Date of Startup:
- 23. Units in Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED Initial Criticality 05/23/87 05/29/87 Initial Electricity 07/11/87 07/12/87 3 Commercial Operation 02/22/88 (49572)
! 1
C. AVERAGE DAILY UNIT NET POWER LEVEL LOG DOCKET NO.: 50-456.
UNIT: Braidwood 1 ' l DATE: 11/10/87 'I COMPILED BY: B. M. Peacock TELEPHONE: (815)458-2801 ext. 2480 MONTH: October, 1987
- 1. 479 17. 222
- 2. '436 18. 163
- 3. 259 19. 235
- 4. 280' 20. 276
- 5. 270 21. 470
- 6. 341 22. 501
- 7. 472 23. 489
- 8. 503 24. 554
- 9. 360 25. 593
- 10. 0 26. 598
- 11. 0 27. 770
- 12. 0 28. 824
- 13. 0 29. 823
- 14. 0 30. 800
- 15. 0 31, 651
- 16. O INSTRUCTIONS >
On this form list the average daily unit power level in MHe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month.
Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly. '
(4957z)
5 d 0 '.) 3 r eh 6 E r )
4i1 M5 . T u l c N a . 2
- a/ 1 t N o d . bi o O p t2 0rl .8x E t n oh t P e r0
'5Bl B( e V no rw M r o1 2 -
E n oi p n O P p -
- : : : : R o i t d o C _
eG
.TEYE .
P i ta nr i rtRE OITBN t ag oa t & oe R NNA O O c l i ic c . fetu UDDH T u l t t un M H h nN T
E' EP d i s ar do E sSe(
LE N e ce ce ei T &n v K IL O r sv id rt S o yE e C PE I g
on do nc sg a Y Fir l O MT T i S ttei D O- C n e in ni tcneF C A i vr e rt iuEs L
t l e n/ es br n)
E s ad or ce itaeR V e vn io nv hst cE I t u tt on xnaiL T r i c ci EIDL(
C n os se -
E o ni r
ot pe gr R i ne R s ee d id O n vs d l n C e ou of ou .
c ga ro . o m d
& s C d cs a a a e l ee .i rm o E
r n orc r cadL S i . rua oe Sre U e bt tl l t s cud A w rs nip au D ll Sne C o ue oae t a O aa i cr P Tt CFr SC H uuot ue T nnt ndh T E aauoet N M MMACRO E .
N _
O A V D P P / C C S 1 23459 M N X E P O
C M n E o T A i S / B A J t Y N. T A T a S '
n
~ i m
R a E x B 7 E M 5 .
U A 0 A A e N / - / / s N 7 N N n R 8 '
e E c L ni oL i
D t&
O N c H O e i g T 5 3 1 5 S r rn E -
A u ti 7 M E l snn 8 R it eio 9 as Rai 1 N Fe rt S O T yTar N , S t gr ro O r A B A A F nrnort r I e E eoit osr T b R m l atiE C o pt el an r U t 5 i nuurire D c S 0 9 2 0 uif gemeh E O R q a e e pd pt R U 0 8 5 0 EHRROAOO
/ O 4 2 - - - - - - - -
S : H 1 ABCDEFGH N D H O * *
T E Y S F F F *
_ H - *
2 9 5 0
T O T 0 0 0 0
_ I P A 1 1 1 1 *
_
_ *
. N 0 1 * - -
_ D 8 9 1 1 * *
- ! l ll l ,
i1 1
. O.
N O
IT TN PE IV RE C
SF EO D
~
N O
I T
TI ND AN LO PC M
C D
O s EN n PO o o YI t i TT t A s a &U e S r T g T e OC n N p NA a E 'o h M c E e R v d I l e U a t O v D a E E r R f ST e e EA n G i VU e e g
N l LT n I e AC o e T R VA N R / e
. O y s P .
. t n .
E - e e e _
.R c n f
a i o E S E L N U T O '
A I D
. N . .
. U 1 2 E
!l!lI l
. w e e
- F.; LICENSEE EVENT REPORTS =
-The:following-is. a tabular summary of all Licensee Event Reports submitted during the reporting period, October 1 through October 31, 1987. This information is provided pursuant to the i reportable occurrence' reporting requirements as set forth in.10 CFR 50.73.-
Licensee Event Reoort Report Numbet_' Dgift Title of Occurrence 87-045-00, -10/07/87 Axial' flux difference surveillance-not initiated'when process computer was rebooted due to y misinterpretation.
87-046-00 10/07/87 Increase in.RCS cooldown rate causing lo'lo steam generator level i
and . auto start of the 18 diesel l< . driven aux-feed pump.
87-047-00 10/16/87 Missed diesel generator surveillance.
~87-048-00 10/07/87 Loss of'offsite power _due to inadvertent deluge' system actuation resulting from a mispositioned valve. !
87-049-00 10/05/87 Exceeded analysis frequency on' waste gas' oxygen analysis.-
87-050-00 10/14/87 Reactor trip due to deluge system discharge.
87-051-00 10/14/87 Control room ventilation switchover due to spurious noise on channel ORE-PR033B.
87-052-00 10/19/87 Reactor trip while synchronizing to the grid.
87-053-00 10/14/87 Containment isolation from loss of power to 1RT-AR011.
i 87-055-00 10/20/87 Spurious containment isolation signals caused by radiation detector 1RT-AR012 failure.
(; 056-00 10/30/87 Control roorn ventilation shift to emergency makeup mode due to a failure of radiation moinitor OPR333 pressure switch. ,
I
).3 ( 49572) ;
__ o _ _
Commonwrith Edison >
Br:ldwood Nucl:Ir Pow:r StItion Route #1. Box 84 Braceville, Illinois 6o407 Telephone B15/458-2801 4
EEF/87-1716 November 10, 1987-Director, Office of Resource Management United States Nuclear Regulatory Commission Hashington, D.C. 20555 ATTN: Document Control Desk Gentlemen:
Enclosed for your information is the Monthly Performance Report covering Braidwood Nuclear Power Station for the period October 1 through October 31, 1987.
Very truly yours,
[
i '
E. E. Fi patrick Station Manager Braidwood Nuclear Power Station.
EEF/RCB/mjv i (4957z)
Attachments .
1 cc: A. B. Davis, NRC, Region III NRC Resident Inspector Braidwood Gary Wright, Ill. Dept. of Nuclear Safety T. J. Maiman K. L. Graesser '
L. D. Butterfield Nuclear Fuel Services, PHR Plant Support L. Anastasia, Station Nuclear Engineering INP0 Records Center Performance Monitoring Group, Tech Staff Braidwood Station Nuclear Group, Tech Staff Braidwood Station S. Sands - USNRC P. L. Barnes
!I