Forwards Insp Rept 50-271/98-09 on 980609-19 & Notice of Violation.Violations Include Examples of Inadequate Procedures for Operation of Reactor Feedwater Pumps & for re-energizing Electrical Bus 6
ML20236P962
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 07/10/1998
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Maret G
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20236P964 List:
References
50-271-98-09, 50-271-98-9, NUDOCS 9807170224
Download: ML20236P962 (3)


See also: IR 05000271/1998009

Text

Mr. Gregory A. Maret

!

Director of Operations

'

Vermont Yankee Nuclear Power Corporation

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301

SUBJECT:

NRC SPECIAL INSPECTION REPORT 50-271/98-09 AND NOTICE OF

VIOLATION

Dear Mr. Maret:

From June 9-19,1998, the NRC conducted a special inspection at the Vermont Yankee

facility to evaluate the personnel actions and equipment response associated with an event

of June 9,1998,in which there was a reactor vessel high water level turbine trip and

reactor scram followed by an electrical transient about an hour later.

Overall crew performance was acceptable with some shortcomings noted surrounding the

circumstances of the electrical transient event. The team found your review of these

events effective and timely with some exceptions noted. Your review was sufficient to

identify causes of the reactor trip and the electrical transient and provide adequate

corrective actions to support a safe restart of the unit. However, deficiencies exist

regarding the thoroughness of your review on electrical bus 1 overcurrent relay calibration

setpoints.

Based on the results of this inspection, the NRC has determined that tvio widns of NRC

requirements occurred. The violations are cited in the enclosed Notice of Violation (Notice)

and the circumstances surrounding it are described in the report. The first deals with two

examples of inadequate procedures for operation of the reactor feedwater pumps and for

re-energizing electrical bus 6. This violation is of concern because there was a challenge

to safety systems, i.e., in one instance, the 4160 v safety bus 3 was deenergized and, in

the second instance, primsry containment isolation occurred. The second violation deals

with inadequate corrective action for deficiencies found during protective relay calibration.

I

Please note that you are required to respond to this letter and should follow the

k )

instructions specified in the enclosed Notice when preparing your response. The NRC will

.

use your response, in part, to determine whether further enforcement action is necessary

to ensure compliance with regulatory requirements.

0\\

The cesponse directed by this letter and the enclosed Notice are not subject to the

clearm= procedures of the Office of Management and Budget as required by the

-

PaperwoA P.cduction Act of 1980, Pub. L. No.96-511.

l

9807170224 980710

PDR

ADOCK 05000271

. .

O

PDR

Tu

i

Y h0

$ Y{

(*

.

Mr. Gregory A. Maret

2

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of this letter

and the enclosed Notice will be placed in the NRC Public Document Room.

Sincerely,

James T. Wiggins, Chief

Division of Reactor Safety

Docket No. 50-271

Enclosure: NRC Specialinspection Report 50-271/98-09and Notice of Violation

cc w/enci:

R. McCullough, Operating Experience Coordinator - Vermont Yankee

G. Sen, Licensing Manager, Vermont Yankee Nuclear Power Corporation

D. Rapaport, Director, Vermont Public Interest Research Group, Inc.

D. Teift, Administrator, Bureau of Radiological Health, State of New Hampshire

Chief, Eafety Unit, Office of the Attorney General, Commonwealth of Massachusetts

D. Lewis, Esquire

G. Bisbee, Esquire

J. Block, Esquire

T. Rapone, Massachusetts Executive Office of Public Safety

D. Katz, Citizens Awareness Network (CAN)

M. Daley, New England Coalition cn Nuclear Pollution, Inc. (NECNP)

State of New Hampshire, SLO Designee

State of Vermont, SLO Designee

Commonwealth of Massachusetts, SLO Designee

_ _ ______ _ _ -

.,

,

Mr. Gregory A. Maret

3

Distribution w/ encl:

Region i Docket Room (with concurrences)

PUBLIC

Nuclear Safety Information Center (NSIC)

NRC Resident inspector

H. Miller, RA/W. Axelson, DRA (1)

D. Screnci, PAO

J. Wiggins, DRS

L. Nicholson, DRS

R. Conte, DRS

J. Shediosky, DRS

G. Morris, DRS

0. Cowgill, DRP

R. Summers, DRP

C. O'Daniell, DRP

R. Nimitz, DRS

DRS File

Distribution w/enci (VIA E-MAIL):

I

B. McCabe, OEDO

C. Thomas, NRR (COT)

R. Croteau, NRR

3

R. Correia, NRR

F. Talbot, NRR

inspection Program Branch, NRR (IPAS)

DOCDESK

. DOCUMENT NAME: g:\\olhp\\ conte \\vy9809. ins

T3 receive a copy of this document. Indicate in the box: 'C' = Copy without attachment / enclosure

'E' = Copy with attachment / enclosure

'N' = No

nnnv

!

OFFICE

Rl/DRS

Rl/DRP

Rl/DRS n,/

Rl/DRS

yg

NAME

JTShedlosky 74

CJCowgill [r{dd RJConte / Pi /

JTWiggins

l

DATE

07/06/98

07q /98

07/ 9 98

07/ /98

'

F'

OFFICIAL RECORD COPY

i

i

._ __________ _ __