ML20236P314
| ML20236P314 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 11/12/1987 |
| From: | HOUSTON LIGHTING & POWER CO. |
| To: | |
| Shared Package | |
| ML20236P289 | List: |
| References | |
| NUDOCS 8711170237 | |
| Download: ML20236P314 (2) | |
Text
n.g.
q ATTACHMENT l
1 e
. ST HL AE All A(lMINISTRATIVE'CONTRaLs
~ FUNCTION'(Continued)
' The.NSRB shall report? to and advise the Group Vice President-Nuclear on those 4
Lareas of. responsibility specified in Specifications 6.5.2.7 and 6.5.2.8.
i
. COMPOSITION
)
The NSRB shall L be composed of the Oudwk,~ ed ob "'
I 6.5.2.2 in uk q% Gty Vee bk
, (bkm: )
Chairman NSRB General Manager i
Member:
General Manager, South Texas Project 1
Member:
. Manager, Engineering and Licensing Member:
Vice President, Nuclear Plant Operations
]
Member:
General Manager, Nuclear Assurance Member:
Manager,' Nuclear Engineering m~y,,udA.ge h Q k
' ALTERNATES l
6.5.2.3 All alternate' members shall be appointed in writing by the Group
[
Vice President-Nuclear to serve on a temporary basis; however, no more than two alternates shall participate as voting members in NSRB activities at any one time.
CONSULTANTS
'6.'5.2.4-Consultants shall be utilized as determined by the NSRB Chairman to provide expert advice to the NSRB.
MEETING FREQUENCY I
6.5.2.5 The NSRB shall meet at least once per calendar quarter during the l
initial year of unit operation following fuel loading and at least once per 6.
months thereafter.
q QUORUM i
6.5.2.6 The quorum of the NSRB necessary for the performance of the NSRB review and audit functions of these Technical Specifications shall consist of q
the Chairman or his designated alternate and at least four NSRB members
-including alternates. No more than a minority of the quorum shall have line responsib'.ility for operation of the unit.
REVIEW l
6.5.2.7 The NSRB shall be responsible for the review of:
]
a.
The safety evaluations for:
(1) changes to procedures, equipment, or systems; and (2) tests or experiments completed under the provision
. of 10 CFR 50.59, to verify that such actions did not constitute an unreviewed safety question; i
b.
Proposed changes to procedures, equipment, or systems which involve an unreviewed safety question as defined in 10 CFR 50.59; 9711170237 871112 SOUTH. TEXAS - UNIT 1 DR ADOCK 050 8
mm -
y
- 'lQ i Q "< : ;p y.
~
.:. s m.
t l ', s Y, h$
fd N
'ST-HL-AE-2411'
,I D
1
' ~
File No.: C20.02.01:
'Page 3 lec:
/ Regional: Admin.istratori Region IV
'D.
K; Lacker Nuclear Regulatory Commission Bureau of. Radiation / Control
.611'Ry9n. Plaza Drive',: Suite 1000..
Texas Department of Health;
~
, 7, Arlington,'TX' 76011-1100 West 49th-Street.
1 Austin,'TXc78756-3189:
, N. : Pr' s' d Kadambi,' ' Proj ect Manager '
aa
- U.S; Nuclear' Regulatory Commission
-e t;.
- 7920 Norfolk" Avenue'~~
1
- Bethesda, MD. c 20814.
.?
l i
' Dan R;, Carpenter-
-Senior Resident Inspector / Operations 3
1c/o U.S._. Nuclear Regulatory r4
- Commission:-
.P.O. Box 910L v Bay City, TX 77414';
J.Ri Newman,-Esquire Newman & Holtzinger, P.C.
.1615 L Street,.N.W.
'l Washington,lDC '20036
-R.L.. Range /R. P. Verret L
TCentral' Power & Light Company-P.:.0;-Box 2121 Corpus Christi, TX ~78403
'.M.B. Lee /J.E. Malaski l
City.of Austin P.O.' Box 1088-Austin,' TX 78767-8814;
,v.
.R.-J..Costello/M.T. Hardt k
. City Public Service Board-
'P.
O.' Box 1771' San Antonio, TX 78296
.. t.
Revised 11/10/87 L3/NRC/fz
- _ - - - -_.