ML20236P034

From kanterella
Jump to navigation Jump to search
Forwards Util Transmitting List of Latest Revs of Field Verification Methods,Quality Insp Procedures & Erection Spec Ref in Large & Small Bore Piping & Pipe Supports Project Status Repts.Related Correspondence
ML20236P034
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/06/1987
From: Wooldridge R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC), WORSHAM, FORSYTHE, SAMPELS & WOOLRIDGE (FORMERLY
To: Bloch P, Jordan W, Mccollom K
Atomic Safety and Licensing Board Panel
References
CON-#487-4801 OL, NUDOCS 8711170116
Download: ML20236P034 (3)


Text

.

pgp

-l

~

fi!41EpjpRR(sf030ECI

]

l-

.r;

- QO_LHETED

~!

WORSHAM, FORSYTHE, SAMPELS & -Wootgzatpon

'j THIRTY TWO HUNDRED. 2006 BRYAN TOWER DAMJLS, TEXAS 752o1

<j TELEPHONE (2W) 979 3000 i

M D.SAMPELS ROBERT M. riLLMORE '

OFFICI 0F SECREIAFf sOEA WORSHAM ROBERT A. wCOLDRIDGE WM. STEPHEN BOYD QQCh[}lN0 h bENYlbf.

)

nemm6

' NEIL D ANDERSON '

MARK R. WASEM

. gg{H SPCNCER C RELYEA CHRIS R MILTENBERGER

.j

- RONALD M HAN$0N ROBERT P OLIVER Or COUNSEL j

- J. DAN BOHANNAN CINDY JACKSON BRUNER 60$. IRtON WORSHAM TRAVIS E. VANDERPOOL JOC A DAVIS '

EARL A FORSYTME

' JUDITH K VOHNSCW ERIC H. PETERSON RICHARO L ADAMS

. b ALTFR W. WHITE

.f DAVID C. LONERGAN '

~ L SCOTT AUSTIN JOHN W. MCREYNOLDS BLAKE L. BECKHAM.

TELEcoptER (24) 880 00it 1

I THOMAS F. LILLARD W STEPHEN COCKERHAM l

ROBERT K. WISE TRACY COMBS FLANtGAN TIMOTHY A. M ACK l

l

.y' j

November 6,1987 Peter B. Bloch, Esquire Dr. Kenneth A. McCollom

.i Chairman.

Administrative Judge Atomic Safety and Licensing Board 1107 West Knapp U.S. Nuclear Regulatory Commission

. Stillwater, Oklahoma 74075 Washington, D.C. 20555 Dr. Walter H. Jordan Elizabeth B. Johnson Administrative Judge Oak Ridge National Laboratory 881 West Outer Drive P. O. Box X, Building 3500 y

Oak Ridge, Tennessee 37830

. Oak Ridge, Tennessee 37830 l

Re: Texas Utilities Electric Company, et al (Comanche Peak Steam Electric Station, Units 1 & 2); Docket Nos. 50-445 and 50 446 N

I

Dear Administrative Judges:

Attached, for your information, is a copy of letter dated November 5,1987 from W. G. Counsil to Mrs. Juanita. Ellis, transmitting the latest revisions of field verification methods (FVMs), quality inspection procedures, and the erection i

specification referenced in the Large Bore and Small Bore Piping and Pipe Supports l

Project Status Reports (PSRs).

Respectful y submitted, Robert A. Wooldridge RAW /kiw Enclosures cc:

Service List (without attachments) 8711170116 8 ke ADOCK O PDR U)

PDR e

S I

9 J

P-Q

}

.m

! t -

.',.3, E

Log # TXX-6926~

[

File. # 10068

+

.r

~

nlELECTRIC 1

wmiam c. counsii.

November 5, 1987 Eiwume Ykr Prcudent.

Mrs. Juanita Ellis,' President 1

CASE (Citizens Association for Sound Energy) 1426 S. Polk Dallas, Texas 75224

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION'(CPSES) i 00CKET N0. 50-445 i

. PROJECT STATUS REPORTS REFERENCED PROCEDURES l

Dear Mrs. Ellis:

Enclosed are the latest revisions of field verification methods (FVMs),

quality inspection procedures, and'the erection specification referenced in the Large: Bore and Small Bore Piping and Pipe Supports Project' Status Reports

-(PSRs).

Attached is a list of the enclosed procedures.

Please note that CPSES Quality Assurance Procedure QI-QAP-11.1-26

_(Reference 42) has been superseded by CPSES ASME Quality Procedure,-AQP-ll.2 (Reference 60).

Very truly yours, db-W. G. Counsil By:

D. R. Woodlan Supervisor, Docket Licensing JCH/grr Attachment Enclosure c - R. A. Wooldridae C. I. Grimes, hRC (w/o enclosure) 400 Nonh 0:ise Street LB NI Dall.a. Te w 7. cat

,. "D

\\<

9 lE G

f ' 14

L Attachment to.TXX-6926 November 5, 1987 Page 1 of 1-LARGE BORE AND SMALL BORE PROJECT STATUS REPORTS REFERENCED PROCEDURES 1.

SWEC-PSAS CPSES Field Verification Method, Clearance Walkdown, CPE-SWEC-FVM-PS-080, Revision 0, July 29, 1987.

(Large Bore and Small Bore PSR Reference No. 50).

2.

SWEC-PSAS CPSES Field Verification Method, Hardware Validation and Supplemental Inspection Programs, CPE-SWEC-FVM-PS-081, Revision 0, July 29, 1987.

(Large Bore and Small Bore PSR Reference N0. _51.)

3.'

SWEC-PSAS CPSES Field Verification Method, validation of Seismic Category.II Large Bore Pipe Support Designs, CPE-SWEC-FVM-PS-082, j

Revision 0, July 29, 1987.

(Large Bore and Small Bore PSR Reference No. 52.)

e

\\

4.

TO Electric Field Verification Method, CPE-EB-FVM-SI-40,

Seismic /Nonseismic Walkdowns, System Interaction Program, Revision 0, t

June 15, 1987.

(Small Bore PSR Reference No. 76.)

5.

CPSES Quality Control Procedure CP-QAP-12.1, Mechanical Component

-Installation Verification, Revision 20, July 10, 1987.

(Large Bore and l

Small Bore PSR Reference No. 34.)

l 6.

CPSES Quality Assurance Procedure QI-QAP-11.1-28, Fabrication and Installation Inspection of Safety Class Component Supports, Revision 38,

)

i October 9, 1987.

(Large Bore and Small Bore PSR Reference No. 45.)

7.

CPSES ASME Quality Procedure, AQP-11.2, Fabrication and Installation Inspection of Pipe and Equipment, Revision 1, August 31, 1987.

(Large l

Bore and Small Bore PSR Reference No. 60.)

8.

CPSES ASME Quality Procedure, AQP-12.1, Pressure Testing Inspection, Revision 0, July 10, 1987.

(Large Bore and Small Bore PSR Reference Nc. 12.)

9.

CPSES Piping Erection Specification No. 2323-MS-100, Revision 9, August 17, 1987.

(Large Bore and Small Bore PSR Reference No. 38.)

1

~

i

_.______.___m.___

. _ _.. _