Notice of Violation from Insp on 870701-15.Violation Noted: Calibr of RHR Monitor B Performed in 1986 for Cs-137 Std Source Response Not within Plus or Minus 20% Initial Calibr
ML20236N423
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 08/06/1987
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20236N405 List:
References
50-373-87-20, 50-374-87-20, NUDOCS 8708110496
Download: ML20236N423 (1)


Text

!

i NOTICE OF VIOLATION Commonwealth Edison Comriny Licenses No. NPF-11; No. NPF-18 As a result of the inspection conducted on July 1-15, 1987, and in accordance with the " General Policy and Procedures for NRC Enforcement Actions,"

10 CFR Part 2, Appendix C (1985), the following violation was identified.

Technical Specification 6.2. A requires that the applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, Revision 2, February 1978 oe maintained and adhered to.

Section 8(b)(2)(bb) of Appendix "A" requires procedures for calibrations of process radiation monitors.

LaSalle Procedure (LCP-820-13) requires that the solid cesium-137 standard source response recorded in Attachment A of LCP-820-13, be within plus or minus 20 percent of the decay-corrected initial calibration response.

Contrary to the above, for the calibration of the "B" RHR liquid process radiation monitor performed in 1986, the solid cesium-137 standard source response, recorded in Attachment A of LCP-820-13, was not within plus or minus 20 percent of the decay-corrected initial calibration response.

Specifically, the standard source response differed from the decay-corrected initial response by 24%.

This is a Severity Level IV violation (Supplement IV).

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation:

(1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further violations; and (3) the date when full compliance will be achieved.

Consideration may be given to extending your response time for good cause shown.

Awd 4 un LdG.Ed/ W Dated V

W. D. Shafer, Chie'f Emergency Preparedness and Radiological Protection Branch l

l i

8708110496 070B06 PDR ADOCK 05000373 0