{{#Wiki_filter:. ..,f ,T 4 l. ;9 [ t i' l . DUKE POWER GOMPANY P.O. BOX 03189 ,l r7 $. CHARLOTTE, N.C. 28242 .HALD. TUCKER _ TEI.2PHOffE .s . vmmensamssr-(704) 073 4531:. ivt + cNovember'5,.1987' a U.S.; Nuclear Regulatory Commission i iDocument5Controla. Desk l Washington, D.C. 20355
Subject:
' 'McGuire Nuclear Sta on-
- Docket Nos. 50-369, -370-NRC/0IE' Inspection Report Nos. 50-369/87-26'and 50-370/87126 , Violation-50-369,'370/87-26-01 ^ Gentiemen: t' i During a.recent' telephone conversation between.the.McGuire NRC Senior ~ Resident q ~ Inspector, ' Bill: Orders;and Milton Symiock of NRC-Region.II, the latter expressed concern over the use 'of' the word " designee" in Duke's response to.the ' referenced. violation. -As a. result, Duke has expanded the. scope 'of our original response to the viola-tion.' Our position is that-a basis for. the Technical Specification is to ensure " Fitness for. Duty".,-Accordingly, Duke will require prior approval of overtime'for hourip non-Nuclear. Production. Department employees as appropriate. Due to'the scope of. the planned corrective actions, additional ' time for. implementation'.wil1~ be needed. Pursuant to '10CFR 2.201, please find attached the revised response to, the refer-anced violation.' Should there.be' any questions concerning this matter, please contact Steve LeRoy 'of our Licensing Staff at (704). 373-6233. Very.truly yours, [L -Hal B. Tucker. I 1 SEL/167/j gc Attachment' l to\\ 8711160128 871105 4,V PDR ADOCK 05000369 7 G' PDR Ig'-
- p,
- j ?
-:p Si l; M DocumenE Control Desk-- ll. jNovember 5, 1987 .Page'2-p /' j xct" 'Dr.-J;: Nelson Grace: -l
- Regional ~ Administrator, Region;II,
-U.S. Nuclear Regulatory Commission .101 Marietta St., NW, Suite 2900 Atlant'a, GA -30323 c' '..Mr. Darl Hood' .U.S.. Nuclear' Regulatory Commission: Office of Nuclear Reactor Regulation 1 Washington, D!C. 20555: .Mr.-W.T. Orders
- NRC Resident Inspector l
McGuire. Nuclear Station ~' i I i t i e l
DUKE POWER COMPANY McGUIRE NUCLEAR STATION s. RESPONSE TO VIOLATION Violation 50-369/87-26-01 Technical Specification 6.2.2.f requires. that adequate shif t coverage shall be maintained without routine heavy use of overtime and states that under certain circumstances when substantial amounts of overtime are required,'an individual should not be permitted to work more than 16 hours in any 24-hour period nor more.. than 72 hours in any 7-day. period, excluding shift turnover time. Technical.' Specification. 6.2.2.f requires' that 'any deviation from the 'above guideline shall be authorized by the, Station Manager or his deputy, or. higher levels of management, in accordance with established procedures and ' with documentation of the basis for granting the deviation. Station Directive 2.0.10,' Overtime Authorization for Personnel Performing Safety Related Func-tions, Revision 2, which implements Technical Specification 6.2.2.f, requires that excessive overtime be authorized in advance and documented on a Request for Work Hour Extension form. Contrary to the. above, on five occasions during the month of June 1987, individuals.vorked overtime in excess'of the Technical Specification limit of 72 hours in a 7-day period without the required management approval, and on numerous occasions during the months of September and October 1986,, March 1987, and May through July 1987, Request for Work Hour Extension forms were approved after the excessive overtime had been worked. Station Directive 2.0.10 allows the Shift Engineer on duty to approve work hour extensions, although -Technical ' Specification 6.2.2.f requires this function to be per-formed by the Station Manager, his deputy, or higher levels of management. This is a Severity Level IV violation (Supplement I). REVISED RESPONSE: 1. Admission or denial of violation: Duke admits to the violation as stated. 2. Reason for the violation if admitted: f h The violation occurred because of inadequate programmatic control. The station directive that was used to implement the program was not followed . correctly. 3. Corrective steps which have been taken and the results achieved: Overtime requirements have been transmitted to supervision and staff a. personnel in staff meetings held on September 23, 1987. b. Station Directive 2.0.10 has been revised to require prior approval { of overtime for affected hourly Nuclear Production Departmant (NPD) workers (employees and vendors / contractors) in excess of Technical Specification limits. Approval is from the Station Manager or group Superintendent (direct reporting management staff) in the Nuclear l Production Department. 1
e [', + .. ',; 1 ' i f.If
- 1 s
PV .Page 2-Q: ~ 71 - Station 'D'irective 2.0.10 has been revised _to require prior approval i c. of overtime for ; affected hourly non-NPD _ workers. (employees and 'I vendors / contractors) Lin excess 'of, Technical - Specification limits. Approval is from the highest level. site manager or direct reporting . management staff-for other company departments at the McGuire site. d. The reporting' form from Station Directive 2.0 10 has been revised to include -a statement of assessment of.the hourly. employee's ability to continue working in. keeping with the intent of Technical Specifi-cation 6.2.2.f:concerning' safety. 4. . Corrective steps planned'to avoid further violations: Duke will' communicate to all affected supervisors - and ; managers the. overtime requirements described.in' revised Station Directive 2.0.10. - 5. The date when full' compliance will be achieved: l .To assure adequate communications to_ all af fected groups L throughout the '-{ _ g McGuire site and -in consideration for shif t and other work' schedules, t - additional time is required.for compliance. Full. compliance ' on correc- .i 9-tive steps will be achieved /by December 1, 1987. =l i n q .i 1 'fc s a i y t i t l x u (- p :.' o m ,}}