ML20236N302
| ML20236N302 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 11/10/1987 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| SL-3637C, NUDOCS 8711160108 | |
| Download: ML20236N302 (6) | |
Text
- _ _ _ _ _ _ _ - _ _ _ _ - -
Georgia Power Company 333 Piedrnont Avenue Atlanta, Georg:a 30308 Telephone 404 526 6526 Mailing Address:
Fbst office Box 45 45 Atlanta, Georgia 30302 b
Georgia Power L. T. Gucwa l'# #*" "I* #9*
Manager Nuciear Sauty and Licensing SL-3637c 1195C X7GJ17-H200 l
November 10, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D. C.
20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 OUTSTANDING LICENSING SUBMITTALS Gentlemen:
Enclosed, for your information and use, please find updated listings of those items of correspondence with the NRC to which a written response is expected.
Enclosure 1,
tabulated chronologically by Georgia Power Company's submittal date, lists items which are ready for closure. prioritizes the six most significant outstanding submittals in terms of value to Georgia Power Company. is a listing of those items requiring submittal of additional information by Georgia Power.
Georgia Power ii prepared to discuss modifications to these status reports and will pronptly address any questions you may have regarding these licensing issues.
Sincerely, fr&
L. T. Gucwa JCJ/lc
Enclosures:
1.
Outstanding Licensing Submittals Requiring NRC Action 2.
Outstanding Licensing Submittals Prioritized List 3.
Outstanding Licensing Submittals Requiring Additional Information c:
(see next page) kOP 8711160108 871110
)
PDR ADOCK 05000321
\\
P PDR
1'i t
Georgia PowerI i
U. S. Nuclear Regulatory Commission November 10, 1987 Page Two h
1 i
c: Georcia ivwer Comoany Mr. J. P. O'Reilly, Sr. Vice President - Nuclear Operations Mr. J. T. Beckham, Jr., Vice President - Plant Hatch j
G0-NORMS U. S. Nuclear Regulatory Commission. Washinaton. D. C 1
1 Mr. L. P. Crocker, Licensing Project Manager - Hatch U_._S. Nuclear Reggiatory Commission. Reaion II
)
Dr. J. N. Grace, Regional Administrator Mr. P. Holmes-Ray, Senior Resident Inspector - Hatch l
l 1195C 700775
l
- 3 Georgia Power d I
ENCLOSURE 1 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 0UTSTANDING LICENSING SUBMITTALS REOUIRING NRC ACTION i
LETTER HATCH DATE 1RLIT SUBJECT Key 0-APPROVAL OF ITEM REQUIRED FOR UPCOMING OUTAGE C-NRC ACTION COMPLETE ON ITEM SINCE LAST REPORT N-ITEM ADDED SINCE LAST REPORT
-05/13/85 321,366 REQUEST FOR ADDITIONAL INFORMATION
- SEISMIC SPECTRA BROADENING 01/06/86 366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS DELETE REQUIREMENT FOR HYDROGEN RECOMBINERS 02/28/86 321,366 PROPOSED LICENSE EXTENSION TO 40 YEARS FROM OPERATING LICENSE VICE CONSTRUCTION PERMIT 03/27/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
EQUALIZING REACTOR PROTECTION SYSTEM SPECIFICATIONS BETHEEN UNITS 09/09/86 321,366 CHANGE TO TECHNICAL SPECIFICATIONS - RIVER LEVEL 10/24/86 321,366 PROPOSED TECHNICAL SPECIFICATION CHANGE FOR FIRE PROTECTION COMPLIANCE ADD REQUIREMENT OF PERFORMING EVERY THIRD TEST OF EQUIPMENT CONTROLLED FROM REMOTE SHUTDOWN PANELS FROM SAID PANELS 11/14/86 321,366
RESPONSE
TO VERBAL REQUEST FOR ADDITIONAL INFORMATION - CABLE TRAY SUPPORTS 12/23/86 321,366 DETAILED CONTROL ROOM DESIGN REVIEW 02/13/87 321,366 REQUEST TO REVISE REPORTING REQUIREMENT TECHNICAL SPECIFICATIONS TO FIT LICENSEE EVENT REPORT REQUIREMENTS 03/04/87 321,366 REQUEST FOR ADDITIONAL INFORMATION - SEISMIC SOIL ANALYSIS 1195C El-1 11/10/87 SL-3637c 700775
3
{,
n'
]
w.
ij
..i t i
g.
LGeorgia PowerI M
y 4
a i
ENCLOSURE:1(Continued)-
1 OUTSTANDING LICENSING SUBMITTALS:
s 4
4 -
. LETTER-HATCH DATI UMI
' SUBJ ECT. ~
03/20/87 366'
' CHANGES.T0. TECHNICAL ' SPECIFICATIONS
' HYDROGEN, 4
HATER CHEMISTRY:
05/01/87?
321,366 PROPOSED-. CHANGE TO TECHNICAL SPECIFICATIONS' -
GASE0US EFFLUENT RELEASE POINTS 7/13/87
- 321 PROPOSED CHANGE TO' TECHNICAL SPECIFICATIONS -
l-..
ELECTRICAL SURVEILLANCE INTERVAL 9/22/87 365; O
PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
STANDBY LIQUID CONTROL SYSTEML OPERATION' USING-ENRICHED SODIUM PENTABORATE-10/08/87-.
_ 321,366 PROPOSED CHANGE TO TECHNICAL-SPECIFICATIONS -
1 FUEL THERMAL LIMITS ~AND ECCS REQUIREMENTS.'
s c
'l i
4-1195C El-2 11/10/87
[<'
SL-3637c i
. mne -
7-
. c; g
n 1
[.
+
y
]
o w LGeorgiaPowerk j
q ENCLOSURE 2
]
ci PLANT HATCH - UNITS 1, 2' 17'~
NRC DOCKETS 50-321, 50-366 OPERATING LICENSES OPR-57, NPF-5
'0UTSTANDING LICENSING SUBMITTALS PRIORITIZED-LIST
]
REASON
. SUBJECT FOR PRIORITY l
]
1.
Preclude Potential CHANGE TO TECHNICAL SPECIFICATIONS -
Future Problems RIVER LEVEL 2.
Hardware: Installed
' CHANGES TO TECHNICAL SPECIFICATIONS -
HYDR 0 GEN HATER CHEMISTRY 3.
Unnecessary Plant PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS Shutdown ELECTRICAL SURVEILLANCE INTERVAL 4.
Agreements with-Union PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
I Imminent SHIFT OVERTIME REQUIREMENTS j
5.
NRC SER has been issued '~ PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
I on Generic Topical EQUALIZING REACTOR PROTECTION SYSTEM l
Report
. SPECIFICATIONS.BETHEEN UNITS j
6.
System Management PROPOSED LICENSE EXTENSION TO 40 YEARS FROM-Planning 0FCRATING LICENSE VICE CONSTRUCTION PERMIT l
4 i
l L
'i l
1 i
I 1195C E2-1 11/10/87
)
-SL-3637c
)
=m J
7 3{, m. o -
pf.,g;! c.;
s,
- g,
- a
-V'
. "4 l 1
I h);G56rgiaPoibr
'd c
i
.ss 3,
- - )
- -
t; y
T
. ENCLOSURE 3-l E
.y PLANT HATCH - UNITSL1, 2
' NRC' DOCKETS 50-321, 50-366-
,)
'0PERATING LICENSES DPR-57, NPF {
OUTSTAlipING LICENSING SUBMITTALS REOUIRING ADDITIONAL INFORMATION 1
LETTER HATCH-L DAll UN_{I SUBJ ECT.-
1
+j L,
06/25/85 321,366
~ PROPOSED CHANGES TO IST PROGRAM l
07/17/86 321,366
-; REQUEST FOR. ADDITIONAL INFORMATION. REGARDIllG
. TECHNICAL.~ SPECIFICATION AMENDMENT TO.GASE0US l
EFFLUENT RELEASE POINTS 1
i lq l
a l
qj i
1 1
]
I 1
1
)
'l 1195C E3-1 11/10/87.
-d
~SL-3637c a
-'7oons j