Text
Pufd
IE 4'
--
,
July 9, 1998
o --
Mr. Lew W. Myers
N
Vice President - Nuclear
!
Centerior Service Company
- P. O. Box 97, A200
Perry, OH 44081
' SUBJECT:
PERRY INSPECTION REPORT 50-440/98010(DRP) AND
Dear Mr. Myers:
I
On June 4,1998, the NRC completed a routine safety inspection at your Perry Nuclear Power
Plant. The enclosed report presents the results of that inspection.
During this B-week inspection period, your conduct of activities at the Perry facility was
,
l~
characterized by conservative operation of the plant and prompt resolution of emergent
.
equipment issues. We are concemed,' however, about three violations of NRC requirements
L
identified during the inspection. The violations and other concems described in this report
represent six examples of failure to follow plant procedures. This concem was observed across
multiple departments.
- _
These violations are cited in the enclosed Notice of Violation (Notice), and the circumstances
surrounding the violations are described in detail in the enclosed report. Please note that you are
required to respond to this letter and should follow the instructions specified in the enclosed
,
l
Notice when preparing your response. The NRC will use your response, in part, to determine
'
whether further enforcement action is necessary to ensure compliance with regulatory
l
requirements.
in accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
,
enclosures, and your response will be placed in the NRC Public Document Room.
I
Sincerely,
i
/s/ M. L. Dapas
Geoffrey E. Grant, Director
Division of Reactor Projects
L
Docket No.: 50-440-
License No.: NPF-58
Enclosures:
1.
i
2.
Inspection Report 50-440/98010(DRP)
t.
See Attached Distribution -
SEE PREVIOUS CONCURRENCES
,
DOCUMENT NAME: G:\\PERR\\PER\\98010.DRP
!
To seceive a copy of this docuenent, Indicate in the box 'C' = Copy without attachment / enclosure "E* = Copy with attachment /encloeuee
n = uo<oes
l
OFFICE
Rill
l
Rill
l
Rlli
l
Rill
l
Rlli
l
~
NAME
S. DuPont:co
R. Gardner-
J. Creed
T. Kozak
G. Gran
(Sect. M2.2)
(Sect. Si and
k
S8)
DATE
07/ /98
07/ /98
07/ /98
07/ /98
07/ 9/98
OFFICIAL RECORD COPY
~
9907140363 990709
l
G
~ ADOOK 05000440
,
!>+
w
- - _ - _ _ - _ _ - - - _ _ _ _ _ - _ _ _ _ -
1
\\
!
l
l
1
. . -
l
l
Mr. Lew W. Myers
'
Vice President - Nuclear
Centerior Service Company
P. O. Box 97, A200
Perry, OH 44081
l
SUBJECT:
PERRY INSPECTION REPORT 50-440/98010(DRP) AND
i
l
Dear Mr. Myers:
l
On June 4,1998, the NRC completed a routine safety inspection at your Perry Nuclear Power
Plant. The enclosed report presents the results of that inspection.
'
,
l
l
During this 6-week inspection period, your conduct of activities at the Perry facility was
characterized by conservative operation of the plant and prompt resolution of emergent
,
equipment issues. We are concemed, however, about three violations of NRC requirements
identified during the inspection. The violations and other concems described in this report -
represent six examples of failure to follow plant procedures. This concem was observed across
-j
i~
multiple departments.
[
These violations are cited in the enclosed Notice of Violation (Notice), and the circumstances
!
surrounding the violations are described in detail in the enclosed report. Please note that you are
required to respond to this letter and should follow the Instructions specified in the enclosed
l
Notice when preparing your response. The NRC will use your response, in part, to determine
'
whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
l
In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room.
Sincerely,
Geoffrey E. Grant, Director
Division of Reactor Projects
l
Docket No.;- 50-440
b License No.: NPF-58
l
. Enclosures:
1.
2.
- Inspection Report 50-440/98010(DRP)
S.te Attached Distribution
L
DOCUMENT NAME: G:\\PERR\\PER\\98010.DRP
l-
To sessive a copy of this document, hidcate in the bom "C" = Copy without attachment /encloeuse *E' = Copy with attachmentlenclosure
u = m. -
OFFICE
Rlli
l
Rlli
l
Rlil
6
Rlli
l
Rill
l
NAME
S. DuPont:cp
R. Gardner
J. Cre
T. Koza
G. Grant
gy
(Se
2)
(Sect. S
y
DATE-
07/l /98
07/3 /98
07/9198
07///98
07/ /98
OFFICIAL RECORD COPY
_
_
_ _ _ _ _ _ _ _ _ - _ _ _ - - - - - - - - - - - - - - -
.
.
L. Myers
-2-
cc w/encis:
H. Hegrat, Manager
Regulatory Affairs
T. Rausch, Director, Quality
!
'
and Personnel Development
R. Schrauder, Director
Nuclear Engineering Department
W. Kanda, General Manager
Nuclear Power Plant Department
N. Bonner, Director, Nuclear
Maintenance Department
H. Bergendahl, Director
Nuclear Services Department
Ohio State Liaison Officer
R. Owen, Ohio Department
of Health
C. Glazer, State of Ohio
Public Utilities Commission
Distribution:
Project Mgr., NRR w/encls
C. Paperiello, Rlli w/encls
J. Caldwell, Rill w/encls
B. Clayton, Rill w/encls
SRI Perry w/encls
DRP w/encls
TSS w/encls
DRS (2) w/encls
Rlll PRR w/encls
PUBLIC IE-01 w/encls
Docket File w/encls
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)