Confirms Dates of 871214-18 for NRC Equipment Qualification Insp for Facility.Insp Will Include Review of Implementation of 10CFR50.49 Equipment Qualification Program,Including Preservation of Qualified Status of Equipment
ML20236M639
Person / Time
Site: Grand Gulf 
Issue date: 11/09/1987
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kingsley O
SYSTEM ENERGY RESOURCES, INC.
References
GL-84-24, IEIN-85-039, IEIN-85-39, NUDOCS 8711130221
Download: ML20236M639 (4)


Text

b 3

o 9'/4y NOV 0 01987 Docket No. 50-416 License No. NPF-29 System Energy Resources, Inc.

ATTN: Mr. O. D. Kingsley, Jr.

Vice President, Muclear Operations.

P. O. Box 23054.

Jackson, MS 39205 Gentlemen:

SUBJECT:

EQUIPMENT QUA'.IFICATION INSPECTION 0F GRAND GULF NUCLEAR PLANT.

(NRC INSPECTION REPORT NO. 50-416/87-32)

This' letter confirms the dates of December 14-18, 1987, for the NRC equipment 1

qualification (EQ) inspection for Grand ' Gulf.

These dates were established during a telephone conversation with Mr. J. G. Cesare of your staff and 1

Mr. H. Dance of this office on October 30, 1987.

The inspection will take place at the plant site.

l A management entrance meeting is scheduled for 1:00 on December 14, 1987, with a management exit meeting tentatively scheduled for 10:30 a.m. on December 18, 1987, both at the plant site.

A plant walkdown inspection of specific EQ-equipment is planned for December 16, 1987, and will require escorted service by knowledgeable EQ personnel of your organization.

The inspection will include but not be limited +.o the following:

1.

Review of your implementation of 10 CFR 50.49 EQ program, including.

j preservation of qualified status of equipment.

2.

Review of your implementation of Technical Evaluation Report / Safety Evaluation Report EQ corrective action commitments.

3.

Review of EQ documentation files including all supporting calculations and performance characteristics (including instrument and loop accuracies, variation in current, voltage, frequency and other electrical characteristics that could impact the qualification). Additional details for auditability of EQ records are specified in IE Notice 85-39.

4.

Physical inspection of equipment from the Master List.

At least two weeks prior to the inspection we will require one copy.of each document' identified in the enclosure with a plus (+) mark.

8711130221 871109 PDR ADOCK 05000416 Q

PDR 1

mI

,\\

,b' System Energy Resources,;Inc..

2

NOV;0' 9 ~ 198T' A' duplicate copy is
toLb' 'sent' to':-~

e s

a

.Uldis Potapovs,. Chief..

Equipment'. Qualification Inspection Section 4

EW/S 312A-O. S. Nuclear-Regulatory Commission' y'

. ashington, DC 20555-W All calculations and files should be'at the plant-site forithislinspectiorii-Youri cooperation' durin'g' this inspection.willt be appreciated... Should you have.

.any questions regarding this inspection, please: contact 1T.: E. Conlon on (404) 331-3537..

.; Sincerely,.

rhSSN c.

N Dav'id M.L Verrelli,'Chie'f, t

. Reactor Projects Branch l'

' Division of Reactor Projects -

Enclosure:

O Reference cc w/ encl:

T. H. Cloninger, Vice' President, Nuclear' Engineering and Support J. E-Cross,.GGNS Site Director.

C. R. Hutchinson, GGNS General Manager L

J. G. Cesare,. Director, Nuclear Licensing 1-and Safety.

q R. T. Lally, Manager of Quality Assurance 3

Middle South Services, Inc.

j l

R. B. McGeSee, Esquire 1

Wise, Carter, Child, Steen and Caraway j

N. S. Reynolds, Esquire l

Bishop, Liberman, Cook, Purcell j

& Reynolds 4

l R. W. Jackson, Project Engineer L

p bec w/ encl:

(See page 3) 1 l

1

A ^.

' i

.j i.

!?

+

,~i.,

y-i my

., ~ ;

j,.,

i : ylt t ;y.gy ;

i ]. )'

5 i.l ,

5 'tJ

' i

'l.

w

..-e

. g, f

J NOV;0!S;1987k:

m m-up r.

n, e.

s i

L System Energy.......... Resources,:Inc.:

e 3'

,,4 at

~~f, i.

4 p

1 V '

t_...g r.

L.bcc w/ encl:...

~

+

'U.LPotapovs,.NRRt

~

4 n

.T. E. Conlon,' RII:

'i s m-1AWB.-Ruff,4RII'

+

i i

^ N. Merriweather, RII:

-:, t y

.H.'. Dance. RII'>

NRC ResidentLInspector; Al' R s

1.. Kintner, NRR.'

JDocument Control Deski State:of Mississippi

+

1

,. ]

o I

i)s

}

1 n

I..,

'}

-: i d

I l.

m 4

d g

.G 1

,?. f q

.l s.

e y

.; +

}

I

.a

,i:

-)

,. r q

((,l% i. :,

5 d

a 0

y7.,'

" ". -..)[P' !.

fj

.gj.

,,.P :

< y)v '.

..; [. e

" 5!. g, ;

.I,.

5I.'.

j

f N 'h

\\. J.j l

d')

h

'_ r ].;

t fj*

., - f.'

)

g l,; y y(;[ L.i

.j y'.3, ifit l.

i.; t o

y,, m.. g

,i n

y-3.

gg

.x m

w

(..

w 8

> q l'+

l

' t' '

Jr RII R

RI ABR TEConlon o

11/y'/87 11/4 /87 f/ 7 o

l s

-:.r

.a

't F'

l t{l

', l L,

.t

.l i

ENCLOSURE REFERENCES o

1.

+ Licensee's overall EQ Administrative Program.

2.

+NRC Safety Evaluation Reports (SER)concerning environmental qualification.

of safety-related electrical equipment, including the SER that forwarded f

the Technical Evaluation Report (TER) to each licensee, 3.

+ Licensee's com.nitments for corrective action including May 1983 SER/TER response, 1984 minuter. of meeting with'NRC, and subsequent changes.

l 4.

+a.

Licensee's list 'of equipment requiring environmental qualification (Master List, submitted in May 1983).

+b.

Master List, version in effect at time of present inspection.

(5; + Licensee's response to Generic letter 84-24, D. G. Eisenhut to Licensee's and Applicants, dated December 17, 1984,

Subject:

Certification of s Compliance to 10 CFR 50.49.

6.

+ Licensee's current System Component Evaluation Worksheets -(SCEW sheets) or equivalent.

7.

+ Licensee's procedures applicable to equipment qualification (EQ program, procurement of qualified equipment, maf ntenance of qualified equipment, modifications to EQ equipment, EQ personnel training (site and corporate personnel), QA/EQ interface including corporate QA, Site QA/QC audits EQ spare parts procurement and licensee program for EQ related NRC Information Notices / Bulletins).

8.

  • Licensee's qualification documentation and/or flies includinc all j

calculation and analysis (c-ing, Performance characteristics, etc.) tnat support the Environmental Qualification.

  • These documents must be available for the inspectors use throughout the inspection.

+These documents are rtTicstt o for review before the inspection and should alto be at the site for the.nspecto/s use throughout the inspection.