4 VIItGINI A E LEcTilIC AND l'OWEll CO>fl%NY Ittcianoxn,Vinoisir unu61 w, L. STEWART VI('E I'H EM I DE NT Ni clean oreHATIOMM August 6, 1987 I
United States Nuclear Regulatory Commission Serial No.87-476 I
Attention: Document Control Desk N0/DJV:jmj Washington, D.C.
20555 Docket Nos.
50-338 50-339 License Nos.
NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 l
SETTLEMENT MONITORING SPECIAL REPORT i
Technical Specification 3/4.7.12, " Settlement Monitoring of Class 1 Structures" requires that a special report be made to the Commission within 60 days if a settlement or differential settir. ment measurement exceeds 75% of the allowable value giver. in Table 3.7-5.
The differential settlement betveca the service building and the Unit 2 main steam valve house has exceeded 75% of the allowable value and therefore a special report is required. We are unable to submit this report within the 60 day time peried required by the Technical Specifications and therefore are requesting an exterision to August 14, 1987 for submittal of the tpecial report.
This extension was discussed with Mr.
Cantrell of your staff on July 30, 1987.
Very truly yours,
'-[
W. L. Stewart 8708110075 870806 PDR ADOCK 05000338 p
S PDR.
'i 0
e cc:
U. S. Nuclear Regulatory Commission 101 Marietta Street, N.W.
Suite 2900 Atlanta, GA 30323 Mr. J. L. Caldwell NRC Senior Resident Inspector North Anna Power Station l
i i
1 a
f i
_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _.