__
_-
____-_ - _ _ - _
- - _ _ _ - _
- - - - - - - - - - - - - - - - - - - -
[
<.
ga sto
UNITED STATES
p
,
NUCLEAR REGULATORY COMMISSION
- 8
g, ,%, -
REGION lil
g
g
801 WARRENVILLE ROAD
t
LISLE. ILLINOIS 60532-4351
'R
f
4...-
July 8, 1998
l
l
l
Mr. Lew W. Myers
Vice President - Nuclear
,
Centerior Service Company
P. O. Box 97, A200
Perry, OH 44081
SUBJECT:
NOTICE OF VIOLATION (PERRY INSPECTION REPORT 50-440/97021(DRP))
. Dear Mr. Myers:
This will acknowledge receipt of your letter dated March 23,1998, in response to our letter
i
dated February 20,1998, transmitting a Notice of Violation associated with inspection
Report 50-440/97021(DRP) for the Perry Station. In your letter, you provided acceptable
l
corrective actions to Violations 1 and 3. However, you stated that you do not agree with
j
Violation 2 (50-440/97021-05(DRP)). Your position was that the material found in the areas of
the emergency service water (ESW) pump house was transient combustible material rather than
intervening combustible material and that transient materials are not considered to be intervening
combustible materials. Therefore, you stated that 10 CFR Part 50, Appendix R, Section Ill.G.2.b
requirements for ensuring separation of cables and equipment from intervening combustibles
. and fire hazards were not violated.
In your response, you also stated that control of transient combustibles was accomplished per
Administrative Procedure PAP-1913, " Control of Transient Combustibles." In your discussion,
you identified to us that the condition of transient materials found in the ESW pump house
combustible free zones was not in accordance with the requirements of PAP-1913, which require
a transient combustible permit for any materials staged in areas which separate trains of safe
shuidown equipment and circuits.
On April 9,1998, we conducted a re-inspection of the circumstances relating to combustible
materials in the areas of the ESW pump house. After careful review of your response and
re-inspection of the circumstances, we have concluded that the material was not intervening
combustible material and agree with your conclusion that the material found was transient
combustible material that was not appropriately marked with a transient combustible material
permit. We determined that this condition was not in accordance with your Administrative
Procedure PAP-1913. Therefore, we are retracting Violation 2 (50-440/97021-05(DRP)) as
issued in the Notice of Violation dated February 20,1998. In its stead, we have enclosed a
i
violation (50-440/97021-06(DRP)) for failure to authorize, track, and document the use of
transient combustible materialin the areas of the ESW pump house as required by Technical
_
Specification 5.4.1, which endorsed Regulatory Guide 1.33, Appendix A.
l
l
!
l
9807130215 980708
ADOCK 05000440
G
i
_ _ _ _ _ _ _ - - _ _ _ _ - _ - _ _ _ _ - _ _ _ - _ _ _ _ _ - -
- - - _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _
___
_
,.. .
.!,
o
L. Myers
-2-
.
As mentioned above, we have reviewed your corrective actions and found them to be
appropriate for Violations 1 and 3. Your response to Violation 2 is also acceptable for the
attached violation. As such, additional response is not required and we have no further
i questions at this time. These corrective actions will be examined during future inspections.
- Sincerely,
)
Original signed by
James L. Caldwell
Deputy Regional Administrator
Docket No.: 50-440
License No.: NPF-58
Enclosure:
Errata Notice of Violation
50-440/97021(DRP)
cc w/ encl:
H. Hegrat, Manager
.
Regulatory Affairs
T. Rausch, Director, Quality
and Personnel Development
R. Schrauder, Director
i
Nuclear Engineering Department -
'
W..Kanda, General Manager
Nuclear Power Plant Department
N. Bonner, Director, Nuclear
Maintenance Department'
H. Bergendahl, Director
Nuclear Services Department
Ohio State Liaison Officer
~ R. Owen, Ohio Department
l
of Health
C. Glazer, State of Ohio
Public Utilities Commission
l
DOCUMENT NAME: G:\\perr\\per97021.ty
To receeve e copy of this document. lndicate m the bcm"C"= Copy without attachment / enclosure "E" e Copy with attachment / enclosure "N" = No copv
OFFICE
Rill
l
6
Rll!
6
Rlli
lN
R(ll,
l
NAME
SDuPont /f& BClayton [M *
TKozalt f P
GGran@M
J '))ldwell
DATE
06/t/98
06/32/98
06/16/98
06tM98
O!M /98
OFFICIAL RECORD COPY
k oE c o's~** A V* L
@
[inrm Ad/ kJ
.
.
- - -
--
- - - - - ___--_ _ _
-.
- - - - _ . _ _ - . - - _ . - - . - . _ _ - , - - - - - - _ _ _ _ _ _ _ . _ _ .
.
.
.
.
.
. ,
.
4
L. Myers
-3-
l
Distribution:
Project Mgr., NRR w/enci
C. Paperiello, Rill w/enci
J. Caldwell, Rill w/enct
B. Clayton, Rill w/enct
SRI Perry w/enci
DRP w/enci
TSS w/enci
j
DRS (2) w/ enc!
Rlll PRR w/enci
PUBLIC IE-01 w/enci
Docket File w/ encl
l
GREENS-
IEO (E-Mail)
- DOCDESK (E-Mail)
!
l
1
i
j
l
l
l
\\
7
-
8
0
L --
- - - - - - - - - - - - - - . - - - - - . - - - - - - - - - . - - - - - - - - - - _ _ - - _ - - - -
---_-m