Forwards Insp Rept 50-219/98-07 on 980615-19.No Violations Noted.Inspectors Were Unable to Close Review of Plant GL 89-10 Program,Because Actions for Establishing Design Basis Capability Will Not Be Completed Until Sept 1998
ML20236L828
Person / Time
Site: Oyster Creek
Issue date: 07/02/1998
From: Eugene Kelly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Roche M
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20236L831 List:
References
50-219-98-07, 50-219-98-7, GL-89-10, NUDOCS 9807130194
Download: ML20236L828 (2)


See also: IR 05000219/1998007

Text

--_ _ - - _ _ _ _ -__- _ ____-_ _ _ _ _ _ _

_ _ - _ - .

'

l

.,

.

'

July 2, 1998

Mr. Michael B. Roche -

~ Vice President and Director

GPU Nuclear Incorporated

l ' Oyster Creek Nuclear Generating Station i

Post Office Box 388

.

' Forked River, New Jersey 08731

,

'

SUBJECT: NRC MOTOR OPERATED VALVE INSPECTION 50-219/98-07

Dear Mr. Roche:

This letter transmits the results of the NRC inspection conducted from June 15-19,1998

i '

at the Oyster. Creek Nuclear. Generating Station. The inspection focused on areas

I , important to the public health and safety, and consisted of an independent evaluation of

,' the motor-operated valve (MOV) program associated with NRC Generic Letter (GL) 89-10,

" Safety-Related Motor-Operated Valve Testing and Surveillance." At the conclusion of the

'

l inspection, the preliminary findings were discussed with you and members of your staff on

June 19,1998.

We were unable to close our review of the Oyster Creek GL 89-10 program'at this time,  !

, . due to the fact that final actions for establishing the design basis capability of

l approximately two thirds of the valves in your program will not be completed until the

refueling outage that is scheduled to begin in September 1998. Actions that you have

committed to complete during upcoming refueling outages in 1998 and 2000, including (1)

completion of thrust calculations using the Electric Power Research Institute MOV

- Performance Prediction Methodology, (2) modifications of valve internals and motor power

cables, and (3) torque switch adjustments, are detailed in the enclosed inspection report.

' Please contact us promptly if your understanding of these commitments differs from those

discussed in this report.

!~ ~

L,y. In accordance with 10CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

"F '

and the enclosures will be placed in the NRC Public Document Room (PDR).

'

L - Sincerely,

ORIGINAL SIGNED BY

EUGENE M. KELLY. ,

Eugene M. Kelly, Chief j

Systems Engineering Branch j

Division of Reactor Safety

Docket No. 50-219

~

License No. DPR-16

.

\

. Enclosure: NRC Inspection Report 50-219/98-07

E J 9g07130194 990702

1

PDR ADOCK 05000219

G PDR

o i

- ____ _ _ _____ ______ _ __ _ ___ _ _ _

.

.

GPU Nuclear, incorporated 2

cc w/ encl:

M. Laggart, Manager, Licensing and Vendor Audits

G. Busch, Manager, Nuclear Safety and Licensing

State of New Jersey

Distribution w/ encl:

Region I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC) ,

PUBLIC i

NRC Resident inspector 1

H. Miller, RA j

W. Axelson, DRA

M. Evans, DRP-

)

'

N. Perry, DRP

D. Haverkamp, DRP

C. O'Daniell, DRP

J. Yerokun, DRS

DRS File

Distribution w/enci (VIA E-MAIL):

B. McCabe, OEDO l

C. Thomas, PD1-3, NRR

R. Eaton, PD1-3, NRR .

T. Colburn, PDl 3, NRR j

R. Correia, NRR '

F. Talbot, NRR

DOCDESK

Inspection Program Branch, NRR (IPAS)

DOCUMENT NAME: G:\ SYSTEMS \DEMPSEY\OC9807.MOV

Ta receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No

copy /

OFFICE RI:DRS lt1lEME8:NRR lE RI:DRS 4 4 l l

NAME DDempsey/mjc w DTerao W (v W> GKelly "

l- DATE 07/02/98 % % 07/ t /98  % 07/ M 8

0FFICIAL RECORD COPY