Text
--_
_ - - _ _ _ _ -__- _ ____-_ _
_ _ _ _ _
_
_ - _ - .
l
'
.,
.
'
July 2, 1998
Mr. Michael B. Roche -
~ Vice President and Director
GPU Nuclear Incorporated
l
' Oyster Creek Nuclear Generating Station
i
- Post Office Box 388
.
' Forked River, New Jersey 08731
,
'
SUBJECT:
NRC MOTOR OPERATED VALVE INSPECTION 50-219/98-07
- Dear Mr. Roche:
This letter transmits the results of the NRC inspection conducted from June 15-19,1998
i
at the Oyster. Creek Nuclear. Generating Station. The inspection focused on areas
'
I
important to the public health and safety, and consisted of an independent evaluation of
,
the motor-operated valve (MOV) program associated with NRC Generic Letter (GL) 89-10,
,'
'
" Safety-Related Motor-Operated Valve Testing and Surveillance." At the conclusion of the
l
inspection, the preliminary findings were discussed with you and members of your staff on
June 19,1998.
We were unable to close our review of the Oyster Creek GL 89-10 program'at this time,
. due to the fact that final actions for establishing the design basis capability of
,
l
approximately two thirds of the valves in your program will not be completed until the
refueling outage that is scheduled to begin in September 1998. Actions that you have
committed to complete during upcoming refueling outages in 1998 and 2000, including (1)
completion of thrust calculations using the Electric Power Research Institute MOV
- Performance Prediction Methodology, (2) modifications of valve internals and motor power
cables, and (3) torque switch adjustments, are detailed in the enclosed inspection report.
' Please contact us promptly if your understanding of these commitments differs from those
discussed in this report.
!~
L,y.
In accordance with 10CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
~
"F
and the enclosures will be placed in the NRC Public Document Room (PDR).
'
'
L
- Sincerely,
ORIGINAL SIGNED BY
EUGENE M. KELLY.
,
Eugene M. Kelly, Chief
j
Systems Engineering Branch
j
Division of Reactor Safety
Docket No. 50-219
License No. DPR-16
\\
~
.
. Enclosure: NRC Inspection Report 50-219/98-07
E
J
9g07130194 990702
1
ADOCK 05000219
G
o
i
- ____ _ _ _____ ______ _ __ _ ___ _ _ _
.
.
GPU Nuclear, incorporated
2
cc w/ encl:
M. Laggart, Manager, Licensing and Vendor Audits
G. Busch, Manager, Nuclear Safety and Licensing
State of New Jersey
Distribution w/ encl:
Region I Docket Room (with concurrences)
Nuclear Safety Information Center (NSIC)
,
PUBLIC
i
NRC Resident inspector
H. Miller, RA
j
W. Axelson, DRA
M. Evans, DRP-
'
N. Perry, DRP
D. Haverkamp, DRP
C. O'Daniell, DRP
J. Yerokun, DRS
DRS File
Distribution w/enci (VIA E-MAIL):
B. McCabe, OEDO
C. Thomas, PD1-3, NRR
R. Eaton, PD1-3, NRR
.
T. Colburn, PDl 3, NRR
j
R. Correia, NRR
'
F. Talbot, NRR
DOCDESK
Inspection Program Branch, NRR (IPAS)
DOCUMENT NAME: G:\\ SYSTEMS \\DEMPSEY\\OC9807.MOV
Ta receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure
"E" = Copy with attachment / enclosure
"N" = No
copy
/
OFFICE
RI:DRS
lt1lEME8:NRR
lE RI:DRS 4 4
l
l
NAME
DDempsey/mjc w
DTerao W (v W>
GKelly "
l-
DATE
07/02/98 % %