ML20236L032

From kanterella
Jump to navigation Jump to search
Advises That Util Commits to Incorporate Applicable Components of Safe Shutdown Sys Into Inservice Testing Program Concurrent W/Schedules to Seismically Upgrade Plant Through 1990 & to Revise Section XI Program by 1991
ML20236L032
Person / Time
Site: Yankee Rowe
Issue date: 11/02/1987
From: Papanic G
YANKEE ATOMIC ELECTRIC CO.
To: Fairtile M
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), Office of Nuclear Reactor Regulation
References
FYR-87-114, NUDOCS 8711100071
Download: ML20236L032 (1)


Text

,

. Telephone (617) 872 8100 TWX 710480-7619 YANKEE ATOMIC ELECTRIC COMPANY y

1671 Worcester Road, Framingham, Massachusetts 01701 November 2, 1987-FYR 87-114 United States Nuclear Regulatory Commission Document Control Desk

. Washington, DC 20555 Attention:

Mr. Morton B. Fairtile, Project Manager i

Project Directorate I-3 Division of Reactor Projects I/II j

References:

(a) License No. DPR-3 (Docket No. 50-29)

(b) Letter, YAEC to NRC, FYR 86-99, dated October 20, 1986 (c) Letter, YAEC to NRC, FYR 87-038, dated April 10, 1987 (d) Letter, NRC to YAEC, NYR 87-145, dated July 24, 1987 I

l

Subject:

Addition of SSS to IST Program

Dear Sir:

]

Reference (d) requested Yankee's schedule with a completion-date to add j

all applicable components of the Safe Shutdown System (SSS) into the Yankee In-Service Testing (IST) Program. Reference (d) determined that.the SSS fell j

into the ASME,Section XI, requirements since it will be used to maintain safo shutdown conditions in the event of an earthquake.

Modifications required to seismically upgrade the_ plant are presently scheduled through the 1990 refueling outage..Also, Yankee is presently

)

required to update and revise the entire Section XI Program by the beginning j

of 1991 with the next program interval commencing on July 1, 1991. Therefore, concurrent with these schedules Yankee commits to incorporate the applicable components of the SSS into the IST Program as part of the program update for

{

the next program interval.

Also, testing of the SSS per IST requirements will commence during the 1990 refueling outage.

It should be noted that the operational readiness of the SSS is presently being verified by surveillance j

testing in accordance with plant procedures..

Please contact us with any questions on this information, j

Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY 0711100071. Q h 9 l

PDR ADOCK PDR j

P G. Pap nic, Jr.

1 Senior Project Engineer' i