Text
.
,
AUG 4
1937
In Reply Refer To:
Docket:
50-298/87-18
Nebraska Public Power District
ATTN:
George A. Trevers
Division Manager - Nuclear Support
P. O. Box 499
Columbus, NE
68601
Gentlemen:
This refers to the inspection conducted by Mr. W. M. McNeill of this office
during the period July 20-24, 1987, of activities authorized by NRC Operating
License DPR-46 for Cooper Nuclear Station, and to the discussion of our findings
with Mr. J. M. Meacham and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included actions you have taken with regard
to previously identified inspection findings; IE Bulletins / Temporary Instructions;
and licensee event report followup. Within these areas, the inspection consisted
of selective examination of procedures and representative records, interviews
with personnel, and observations by the NRC inspector.
The inspection findings
are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
One unresolved item is identified in paragraph 5 of the enclosed inspection
report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely.
Oddnd m e Cy
J. E. C4Hrdo
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
(see next pa e)
h
RIV:RPB/ h '
C;
/
/ R
~
)(Ja d n
pEGagliardo
l
WMMcNeill;df
gg
fl'}/87
/(, l87
q/tl/87
,
8700100012 070004
ADOCK 05000290
0
__
- _ _ _ - _ _ _ _ _ - _ _ _ _ _ _
_ _ - _ _ _
_
_
i
.. ,
l
Nebraska Public Power District
-2-
Enclosures:
,
'
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-298/87-18
r
cc w/ enclosures:
Guy Horn, Division Manager
of Nuclear Operations
Cooper Nuclear Station
P. O. Box 98
Brownville, Nebraska
68321
Kansas Radiation Control Pro, gram Director
Nebraska Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RPB
DRSP
- RRI
R. D. Martin, RA
- Section Chief (RPB/A)
- D. Weiss, RM/ALF
RPSB
- RSB
- MIS System
- Project Inspector, RPB
- RIV File
- R. Hall
- RSTS Operator
- W. Long, NRR Project Manager
R. Starostecki, NRR
- w/766
1
1
1
l
.
'
.%*