t UNITED STATES jh'- 3 d4*
g j
NUCLEAR REGULATORY COMMISSION t
WASHINGTON, D.C. 20086 4 001
{*****[
June 30, 1998 Mr. John K. Wood Vice President - Nuclear, Davis-Besse Centerior Service Company c/o Toledo Edison Company Davis-Besse Nuclear Power Station 5501 North State Route 2 f
Oak Harbor, OH 43449-9760
SUBJECT:
RELIEF FROM CERTAIN ASME CODE REQUIREMENTS FOR INSERVICE INSPECTION
)
FOR FACILITY OPERATING LICENSE N0. NPF DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 (TAC NO. MA0414)
Dear Mr. Wood:
The Technical Specifications for the Davis-Besse Nuclear Power Station state that the inservice inspection of the American Society of Mechanical Engineers (ASME) Code Class 1, 2, and 3 components shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vesse? Code and applicable addenda as required by 10 CFR 50.55a(g), except where specific written relief has been granted by the Commission.
By letter dated December 22, 1997, as supplemented April 7,1998, you submitted to the NRC requests for relief from the examination requirements of the applicable ASME Code,Section XI, for the second inservice inspection interval examinations. The NRC staff has reviewed and evaluated your Relief Request Nos. RR-El through RR-E10 for the second 10-year inservice inspection interval at Davis-Besse. As detailed in the enclosed Safety Evaluation and accompanying table, the staff has approved seven of your requests for relief, and denied three of your requests.
The proposed alternatives in Relief l
Requests RR-El, RR-E3, and RR-E4 have been granted pursuant to
//
10 CFR 50.55a(a)(3)(i). The proposed alternatives in Relief Requests RR-E2,
/ 'l RR-E6, RR-E7 and RR-E9 have been granted pursuant to 10 CFR 50.55a(a)(3)(ii).
The proposed alternatives in Relief Requests RR-E5, RR-E8 and RR-E10 have been fio denied due to lack of adequate justification.
V/W/
Regarding Relief Request RR-E3, you stated in your April 7,1998, letter that:
This program is presently being evaluated against the recommendations of Information Notice 97-13, " Deficient Conditions Associated with Protective Coatings at Nuclear Power Plants," and the Electric Power Research Institute Plant Support Engineering Guidelines for Nuclear Safety Related Coatings.
Changes to improve this program will be implemented as necessary.
P
^ 287 bedkao-9007090 "
- ?#
EC FRE CENTEB BOPY
Wo d'
't
- 2~
]
June 30, 1998 You are encouraged to supplement this effort by considering the incorporation of provisions necessary to ameliorate the concerns expressed by the staff in its draft generic letter, " Potential for Degradation of the Emergency Core Cooling' System and the Containment Spray System After a Loss-of-Coolant l
. Accident Because of Construction and Protective Coating Deficiencies and l
Foreign Material in the Containment," as published in the Federal Register l
(62 FR 12467).
Please contact Allen Hansen of my staff at (301) 415-1390 if you have any questions regarding this action.
l Sincerely, Original signed by:
Ronald R. Bellamy, Acting Director
-Project Directorate III-3
-Division of Reactor Projects III/IV Office of Nuclear _ Reactor Regulation Docket No. 50-346 4
1
Enclosures:
As stated cc w/encls:
See next page Distribution:
Docket File GHillL(2)
.PUBLIC ACRS PD3-3 Reading HAshar EGA1 OGC GGrant, RIII RBellamy:
THarris (TLH3, SE only)
DOCUMENT NAM
- r..c.~.. cm., m,..E :G:\\DAVISBES\\DBA0414.LTR c
.ni. ac. m m. i,om c. c
=.ncio r - cm.nn oncio v. no em 0FFICE P033 LA l 6 P033-PM f OGC, /) l P033;PD j NAME EBarnhltith AHansenj(f) 16tf/
R8elfanry
- DATE b/IT/98 6 / /&9ff"~
(/ /)$98 (p/M/98 F
ECORD COPY l
L
June 30, 1998-p
.3 Y6iJ are encouraged to supplement this effort by considering the incorporation of provisions necessary to ameliorate the concerns expressed by the staff in its draft generic letter, " Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-Coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material in the Containment," as published in the Federal Register (62 FR 12467).
Please' contact Allen Hansen of my staff at (301) 415-1390 if you have any questions regarding this action.
Sincerely, Original signed by:
1 Ronald R. Bellamy, Acting Director Project Directorate III-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosures:
As stated cc w/encls:
See next page Distribution:
Docket File GHill (2) l PUBLIC
'ACRS PD3-3 Reading.
HAshar i
EGA1 OGC i
GGrant, RIII RBellamy
-THarris (TLH3, SE only)
T.,.c...em.,m.o com.ni. m.\\DAVISBES\\DBA0414.LTR DOCUMENT NAME:
G:
c.i. m m. = c. cm.,inooi.,,ci o,
r - c.,,.an.nci
, =. u. co,
i l
OFFICE PD33-LA l h PD33-PM f OGC, /) l PD33;PDj i
NAME E8ernhilli() AMansenj(/) [LhtE/
R8elFamy' DATE b /IT/98 6/@9F
(# /M98 (p/M/98 j
F ECORD COPY 1
______-__-___________-__-__-____-______-________-__-_-_a
l
_. 1 J. Wood !
l l
You are encouraged to supplement-this effort by considering the incorporation of provisions necessary to ameliorate the concerns expressed by the staff in l
.its draft generic letter, " Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-Coolant i
Accident Because of Construction and Protective Coating Deficiencies and l
Foreign Material in the Containment," as published in the federal Register l
(62 FR 12467).
Please contact Allen Hansen of my staff at (301) 415-1390 if you have any questions regarding this action.
Sincerely, M 0.\\
Ronald R. Bellamy, Acting Direc or Project Directorate III-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation l
Docket No. 50-346
Enclosures:
As stated cc w/encls:
See next page l
l l
I i
(-
f 1L-
..T i
John K. Wood Davis-Besse Nuclear Pnwer Station, Unit 1 Toledo Edison Company l
{
Mary E. O'Reilly Robert E. Owen, Chief FirstEnergy '
Bureau of Radiological Health Davis-Besse Nuclear Power Station Service 5501 North State - Route 2 Ohio Department of Health Oak Harbor, OH 43449-9760 P.O. Box 118 Columbus, OH 43266-0118 James L. Freels Manager - Regulatory Affairs Toledo Edison Company James R. Williams, Chief of Staff Davis-Besse Nuclear Power Station Ohio Emergency Management Agency 5501 North State - Route 2 2855 West Dublin Granville Road Oak Harbor, OH 43449-9760 Columbus, OH 43235-2206 Jay E. Silberg, Esq.
Donna Owens, Director Shaw, Pittman, Potts Ohio Department of Commerce and Trowbridge Division of Industrial Compliance 2300 N Street, NW.
Bureau of Operations & Maintenance Washington, DC 20037 6606 Tussing Road P.O. Box 4009 Regional Administrator Reynoldsburg, OH 43068-9009 U.S. Nuclear Regulatory Commission 801 Warrenville Road Ohio Environmental Protection Agency Lisle, IL' 60523 4351 DERR-Compliance Unit ATTN: Zack A. Clayton Robert B. Borsum P.O. Box 1049 Babcock & Wilcox Columbus, OH 43266-0149 l
Nuclear Power Generation Division 1700 Rockville Pike, Suite 525 State of Ohio Rockville, MD 20852 '
Public Utilities Commission 180 East Broad Street Resident inspector Columbus, OH 43266-0573 U.S. Nuclear Regulatory Commission 5503 North State Route 2 Attorney General Oak Harbor, OH 43440 Department of Attomey 30 East Broad Street James H. Lash, Plant Manager Columbus, OH 43216 Toledo Edison Company Davis-Besse Nuclear Power Station President, Board of County 5501 North State Route 2 Commissioner of Ottawa County Oak Harbor, OH 43449-9760 Port Clinton, OH 43252
-