Forwards Safety Insp Repts 50-277/87-23 & 50-278/87-23 on 870810-19 & Notice of Violation.Programmatic & Technical Bases for Continued Procurements from Valve Vendor Requested within 30 Days Based on Unresolved Items
ML20236H489
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/28/1987
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Gallagher J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20236H491 List:
References
NUDOCS 8711040164
Download: ML20236H489 (3)


See also: IR 05000277/1987023

Text

DC3

OCT 2 81987

.

Docket Nos.

50-277

l

50-278

1

Philadelphia Electric Company

,

'

ATTN: Mr. J. W. Gallagher

Vice President

Nuclear Operations

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject:

Inspection Nos.

50-277/87-23 and 50-278/87-23

This refers to the routine safety inspection conducted by Mr. George Napuda of

this office on August 10-19, 1967 at Peach Bottom Atomic Power Station, Delta,

Pennsylvania and your Philadelphia, Pennsylvania corporate offices of activi-

ties authorized by NRC License Nos. DPR-44 and DPR-56 and to the discussions of

our findings held by Mr. Napuda with Mr. D. M. Smith and other members of your

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspec-

tion Report which is enclosed with this letter.

Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

Our inspector also verified the steps you have taken to correct the violation

brought to your attention in our letter dated February 15, 1987. We have no

further questions regarding your action at this time.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This violation has been

categorized by severity level in accordance with the " General Statement of

Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C

(Enforcement Policy). You are required to respond to this letter and in

preparing your response, you should follow the instructions in Appendix A.

We note that an unresolved item discussed in paragraph 3.3 of the report

identifies purchases of valve parts from a vendor that has not been on the

Evaluated Supplier List for a number of years.

Another unresolved item

discussed in paragraph 4.3 of the report indicates your commitment to implement

a formal training program, includtng appropriate documentation, for Document

Admir.istration Center personnel. We request you to provide this of fice within

30 days (1) the programmatic and technical bases for continued procurement

G711040164 871029

jl

PDR

ADOCK 05000277

OFFICIAL RECORD COPY

CIR P8 87-23 - 0001.0.0

-3

G

PDR

10/20/87

i .I

- _ _ - _ _ - - -

-

-

___

.

Philadelphia Electric Company

2

!

i

!

from the valve vendor; and, (2) confirmation of your commitment to and date by

which the formal training program for the above personnel will be implemented.

I

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely,

POSERT !A. GALLO

'

l

William V. Johnston, Acting Director

Division of Reactor Safety

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined NRC Region I Inspection Report

Numbers 50-277/87-23 and 50-278/87-23

cc w/encis:

Dickinson M. Smith, Manager, Peach Bottom Atomic Power Station

John S. Kemper, Senior Vice President, Engineering and Production

Thomas S. Shaw, Jr., Vice President, Production Troy B. Conner, Jr. , Esquire

W. H. Hirst, Director, Joint Generation Projects Department,

Atlantic Electric

G. Leitch, Nuclear Generation Manager Eugene J. Bradley, Esquire, Assistant

General Counsel (Without Report)

.

Raymond L. Hovis, Esquire

i

Thomas' Magette, Power Plant Siting, Nuclear Evaluations

W. M. Alden, Enginee. in Charge, Licensing Section Doris Poulsen, Secretary of

Harford County Council

Public Document Room (POR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

0FFICIAL RECORD COPY

CIR PB 87-23 - 0001.0.1

10/20/37

-

__ _ _ _ - _

_-_

,

Philadelphia Electric Company

2

l

-

r

bcc w/encls:

l

Region I Docket Room (with concurrences)

i

Management Assistant, DRMA (w/o enc 1) Section Chief, DRP

Robert J. Bores., DRSS

DRP Section Chief

.

l

l

1

l

1

l

l

I

l

l

j

i

l

i

  1. M

RI:D S

RI:DRS

RI:DRP

HQ: NRR

RI:DRS

'

^ u a/rw

Dev M;/

Linvil

ton . Blumberg

G'ito

)

>c ut

,

-

/

3

h

10t /87

10/24/87

10/M 7

10h6/87 10/l[/87

1

87

1

0FFICIAL RECORD COPY

CIR PB 87-25 - 0002.0.0

j

10/26/87

1

~ _ _ _ . _ - _ _ _ _ _ _ - . _ - - _ _ . - _ _ _ _

_

i