Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 07/23/1987
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
References
NUDOCS 8708050107
Download: ML20236H228 (2)


See also: IR 05000213/1985008

Text

_ - - _ _ - _

.

+

- c, j j ! ! : ~

.

Docket No. 50-213

Connecticut Yankee Atomic Power Company

ATTN: Mr. E. J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141

Gentlemen:

Subject: Inspection No. 50-213/85-08

We have received your letter dated June 9,1987, which details the present

status of your meteorological data transmission system and discusses your re-

evaluation of proposed long-term solutions to previously identified data

transmission problems. J

Your proposal to utilize the Offsite Information System to provide back-up

meteorological data transmission capability appears to be an acceptable

alternative to your previous committment to install digital data displays and

a dedicated, real time data terminal. Adequacy of these systems will be

examined during a future inspection of your Radiological Environmental

Monitoring program.

Your cooperation with us is appreciated.

Sincerely,

I

Crictual Sicnod B7: ,

.k

Thomas T. Martin, Director

Division of Radiation Safety ,

and Safeguards  ;

!

cc:

D. B. Miller, Station Superintendent

D. O. Nordquist, Manager of Quality Assurance

R. M. Kacich, Manager, Generation Facilities Licensing I

W. D. Romberg, Vice President, Nuclear Operations I

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC) j

NRC Resident Inspector l

State of Connecticut  !

! '

8700050107

ADOCK

g h g3

PDR PDR g\

SL OFFICIAL RECORD COPY RL HN 85-08 - t001.0.0

07/15/87

l

t

A

.

-

Atomic Power Company

bcc:

Region I Docket Ruom (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

M. McBride, RI, Pilgrim

J. Shediosky, SRI, Millstone 1&2 ,

T. Rebelowski, SRI, Millstone 3

J. Akstulewicz, LPM, NRR

R. Bores, DRSS  !

R. Struckmeyer, DRSS  !

,

l

l

I

n' M

DRSS:RIvfftf RI DRSS:RI

Struckmeyer/pjj (Pasciak Bellamy

7/20/87 7/}0/87 7/vo /87

0FFICIAL RECORD COPY RL HN 85-08 - 0002.0.0

07/15/87

. _ _ _ . _ _ _ - - _ - _ - _ _ _ _ - .

1

-

l

> l

'

e

CONNECTICUT YANKEE ATOMIC POWER COMPANY f

B E R L I N, CONNECTICUT

P O box 270 HARTFORD. CONNECTICUT 06141 0270

TELEPHONE

203-665-5000

June 9, 1987

Docket No. 50-213

B11652

Re: 10CFR50.47

U.S. Nuclear Regulatory Commission

Attn: Document Control Desk

Washington, D.C. 20555

References: (1) T. T. Martin letter to J. F. Opeka, dated

May 20, 1985.

(2) J. F. Opeka letter to T. T. Martin, dated

August 14, 1985.

(3) J. F. Opeka letter to T. T. Martin, dated

October 3, 1986.

Ge ntlemen :

Haddam Nect Plant

Inspection Report do. 50-213/85-08

,

'

Informational Letter in Regard to

Unresolved Item No. 50-213/85-08-04

I&E Inspection No. 50-213/85-08 (Reference 1) identified an

unresolved item (No 50-213/85-08-04) in regard to Connecticut

Yankee Atomic Power Company's ( C YAPCO ) inability to bring nete- {

orological monitoring equipment within tolerance ranges specified I

in calibration procedures. A short term solution - utilizing

!

spare wires in the cable between the Meteorological Building and 1

the Control Room - was accomplished. Reference (2) committed to j

evaluate long term solutions. Part one of the long term solution

involved installing a data terminal in the control room which

utilized a transmission path separate from that used for

previously installed equipment. This was reported complete in

Reference (3) which also extended the date for part two -

replacing the analog recorders with digital data displays and

installing a dedicated, real time data terminal - to December 1,

1987.

bb-l-- hYh"

,V .

l

-

. l

.

.

.

_2_.

'

The purpose of this letter is to inform you of the results of a

reevaluation which -CYAPCO has done on this issue. . The present

system performs well. The information' received.in the control

room via the data terminal is accurate and reliable. The analog

recorders function well and provide a backup to the terminal. A

new plant process computer will be installed during the upcoming

refueling outage. The Of fsite Information System (OFIS), which

permits access of plant process computer data by several remote

l 'ocations, will be operational approximately six. months following

.

the outage (about April 1988). OFIS will be supplied with mete-

orological data. Since this system would essentially duplicate

part two of the proposed long term solution, CYAPCO intends to

use OFIS in place of part two. It should be noted that CYAPCO

considers the presently installed system to'be adequate in all

respects and the use of OFIS to transmit meteorological data to

be above and beyond that required.

Very truly yours,

CONNECTICUT YANKEE ATOMIC POWER COMPANY

H /

Bf

Se nior Vice

f'. Mr'oc zKe

President

cc: W. T. Russell, Region I Administrator

F. M. Akstulewicz, NRC Project Manager, Haddam Neck Plant i

P. D. Swetland, Resident Inspector, Haddam Neck Plant

!

'