Forwards Rev 1 to TS Change Request 230 to License DPR-16, Modifying EDG Insp Requirement,In Response to NRC Request for Addl Info
ML20236H160
Person / Time
Site: Oyster Creek
Issue date: 06/29/1998
From: Roche M
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20236H163 List:
References
1940-98-20315, NUDOCS 9807070108
Download: ML20236H160 (5)


Text

____-_ ----_-

1 .

e

! l GPU Nuciear. Inc.

( U.S Route #9 South NUCLEAR Post Office Box 388 Forked Rwer, NJ 087310388 8

Tel 609-9714000 June 29,1998 1940-98-20315 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555 Gentlemen:

Subject:

Oyster Creek Nuclear Generating Station (OCNGS)

Docket No. 50-219 Technical Specification Change Request (TSCR) 230 (Rev.1)

Modify Emergency Diesel Generator (EDG) Inspection Requirement In accordance with 10 CFR 50.4(b)(1), enclosed is Technical Specification Change Request (TSCR) 230 (Rev.1). This submittal replaces the previously submitted TSCR 230 in its entirety.

Also enclosed is a Certificate of Service for this request certifying service to the chief executive of the township in which the facility is located, as well as the designated official of the State of New Jersey Bureau of Nuclear Engineering.

By letter dated February 22,1996 GPU Nuclear submitted TSCR 230. That submittal proposed deleting the requirement that the biennial inspection of the EDGs be performed during shutdown.

In addition, it proposed that the Allowed Outage Time (AOT) be extended (for the biennial inspection only) from 7 days to 14 days. Several other changes such as deleting the phrase "in any 30 day period" and deleting references to engineered safety features (ESF) were also included. The NRC staff responded with a Request for Additional Information (RAI) on March 25,1996. GPU Nuclear submitted a response to the RAI on June 13,1996. The staff prepared a j second RAI dated January 7,1997, which focused on the probablistic risk assesssment (PRA) justification for the increase in AOT. On September 25,1997 GPU Nuclear augmented the PRA  ;

justification for the proposed changes. In November of 1997, the stafTprepared a third RAI which included a requirement that two additional specifications be submitted to complement the proposed changes. The staff was particularly concerned with the extension of the AOT and the PRA support for that change.

l GPU Nuclear's intent in this matter was the elimination of the requirement that the biennial l inspection of the EDGs be done while the plant was shutdown This allows EDG maintenance to  !

be accomplished prior to the outage which increases the reliability of onsite ac power during shutdown conditions.

9007070108 900629

  • PDR ADOCK 05000219 '

P PDR \N.

0UddCQ

I*

  • - 1940-98-20315 Page 2 of 2 l

On September 26,1998, refueling outage 17R will commence at Oyster Creek. In order to a

maximize the reliability of on site power sources during the upcoming refueling outage, GPU Nuclear would like to have the option of performing the inspection of one of the EDGs and testing the diesel start batteries during the operating cycle prior to commencing the refueling outage. Therefore, TSCR 230 has been revised and greatly reduced in scope. The attached TSCR 230 (Rev 1) requests deletion of the requirements that the biennial EDG inspection and the station battery capacity tests be done while the plant is shutdown. It also increases the per cent of rated power to be reached during the testing of the diesels in response to the NRC review of our original submittal. In addition, a minor wording change has been included and a typographical error has been corrected.

I Pursuant to 10 CFR 50.91(a)(1), enclosed is an analysis applying the standards in 10 CFR 50.92 to make a determination of no significant hazards consideration.

Very truly yours,

'h /

Michael B. Roche Vice President & Director Oyster Creek Attachments DPK/

cc: Administrator, Region I (2 copies' NRC Project Manager NRC Resident Inspector

o e

l .

GPU Nuclear. inc.

( U.S. Route #9 South NUCLEAR Post Office Box 388 Forked River, NJ 08731-0388

Tel 609-971-4000 June 29, 1998 1940-98-20315 The Honorable Louis A. Amato, Jr.

Mayor ofLacey Township 818 West Lacey. Road Forked River, NJ 08731

Dear Mayor Amato:

Enclosed herewith is one copy of Technical Specification Change Request No. 230, Revision 1, for the Oyster Creek Nuclear Generating Station Operating License.

This document was filed with the United States Nuclear Regulatory Commission on June 29, 1998.

Sincerely, I

b b Michael B. Roche 1 Vice President and Director i Oyster Creek

~ Attachment DPK/ pip i

l p

)

i

{ '

GPU Nuclear. lec.

( U.S. Route 6 Scuth NUCLEAR Post Office Box 388 Forked River, NJ 08731-0388 Tel 609-9714000 June 29 1998 1940-98-29315 -.,

l Mr. Kent Tosch, Director I

Bureau ofNuclear Engineering Department ofEnvironmental Protection CN 411 Trenton,NJ 08625

Dear Mr. Tosch:

Subject:

Oyster Creek Nuclear Generating Station Facility Operating License No. DPR-16 Technical Specification Change Request No. 230, Revision 1 j Pursuant to 10 CFR 50.91(b)(1), please find enclosed a copy of the subject document which was filed with the United States Nuclear Regulatory Commission on June 29, 1998. I Sincerely, Ib Michael B. Roche l Vice President and Director Oyster Creek  ;

l Attachment I DPK/ pip l

_-_D

f UNITED STATES OF' AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

) Docket No. 50-219 GPU Nuclear Corporation -)-

CERTIFICATE OF SERVICE

' This is to certify that a copy of Technical Specification Change Request No. 230, Revision 1, for Oyster Creek Nuclear Generating Station Operating License, filed with the U.S. Nuclear Regulatory Commission on June 29. .1998 has this day of 3,m, 9a .

' 1998, been served on the Mayor of Lacey Township, Ocean County, New Jersey by deposit in the United States mail, addressed as follows:

The Honorable Louis A. Amato, Jr.

Mayor ofLacey Township 818 West Lacey Road ForkedRiver,NJ 08731 h-BY d l Michael B. Roche Vice President and Director Oyster Creek i