ML20236H105

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Repair Procedure - NAC-1E Shipping Cask, First Transmitted Per & Inadvertently Omitted from .Rev 1 Incorporates Comments from Nrc/Nuclear Assurance Corp 870902 Meeting
ML20236H105
Person / Time
Site: 07109183
Issue date: 10/02/1987
From: Dixon G
NAC INTERNATIONAL INC. (FORMERLY NUCLEAR ASSURANCE
To: Macdonald C
NRC
Shared Package
ML20236H107 List:
References
28698, GND-87-159-QAD, NUDOCS 8711030440
Download: ML20236H105 (1)


Text

_

[r 77-9/8 3 RETURN TO 396-SS

g;;,= g,=~

Norcross, Georgia 30092 (404) 4471144 Telex: 6827020

%%inbergstrasse 9

'87 00L 21 P2 :04 875Af*

OcYo*bE2,1987 GND/87/159/QAD U. S.-Nuclear Regulatory Commission 7915 Eastern Avenue e

4 Silver Springs, MD 20910

_6 g

Mr. Charles E. MacDonald, Chief h

Transportation Certification Branch

%b

{

'9 i

m

SUBJECT:

.NAC-1E SPENT FUEL SHIPPING CASK REPAIR PROCEDURE 5,

3

REFERENCE:

NAC letter FLD/87/138/ETS, dated September 3, 1987 ID y ;%

i a e,

Dear Mr. MacDonald:

Please find attached Revision 1 of Attachment A (Repair Procedure - NAC-1E Shipping Cask) as transmitted via the above referenced letter.

This document has been revised to incorporate the comments discussed during the NRC-NAC meeting on September 2, 1987.

This document was inadvertently omitted from NAC's letter FLD/87/145/ETS, dated September 30, 1987.

Please contact either Mr. F. L. Danese or myself if additional information is required.

Sincerelyg NUC[EARASSURANCECORPORATION i

il y

l G.N.DixonQJr a,

O Corporate M6Dager 4

Quality Assurance 6

os O

attachment I.

i Cy 9

e EP cc: W. Pearson, DOE /SRP C

r o

GND/slb u

8711030440 871002 PDR ADOCK 07109183 C

ppR

_ _ _ _ _ ~