ML20236G020
| ML20236G020 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 10/29/1987 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20236G023 | List: |
| References | |
| NUDOCS 8711020379 | |
| Download: ML20236G020 (2) | |
See also: IR 05000267/1987026
Text
..
,
,
.
In Reply Refer To:
QCT U ggg]
Docket:
50-267/87-26
'
Public Service Company of Colorado
ATTN:
Robert 0. Williams, Jr.
Vice President, Nuclear Operations
2420 W. 26th Avenue, Suite 15c
0enver, Colorado 80211
,
,
g
Gentlemen:
This refers to the special, onsite inspection conducted by the NRC Augmented
Inspection Team (AIT) during the period October 3-6, 1987, relating to concerns
resulting from the turbine building fire, and to discussion of our findings with
you and other members of your . staff at the conclusion of the inspection.
The enclosed copy of the AIT report identified the areas examined during this
review. Within these areas, the inspection consisted of selective examination
of procedures and representative records, interviews with personnel, and
observations by the NRC inspectors.
,
In accordance with 10 CFR Part 2.790(a), a copy of this letter and the enclosure
j
will be placed in the.NRC Public Document Room.
l
A separate inspection (Report No. 50-267/87-28) will be issued to discuss the
emergency response aspects of the event.
i
Should you have any questions concerning this inspection, we shall be pleased to
discuss them with you.
Sincerely,
Uriginal Signed By
L. J. Callan
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
Appendix - AIT Inspection Report
50-267/87-26
Attachment to Inspection Report:
>
-
Figures 1-5
cc w/ enclosure:
(see next page)
f(]
[ [) k
npf ( 00
<
JCalv[o
D: RP
C: S/
J
don /tw
LJCallan
$'
/87
g /,y /87
l0/Li/87
1
8711020379 871029
I5
ADOCK 05000267
0
_ _ _ _ - _ - _ _ _ -
.
-
p
-
-
,
s
,
,
,.
,n
,
.
.
(
>
.
,
,
j
>
- '
x,
c.
- ,.
-
1
, /%.p:n '
.c
v
,
Public! Service Company cof Colorado
'.2-
/j
-
o
.
t
cc:w/ enclosure:.
$
' Fort St. Vrain. Nuclear Station
' Manager,-Nuclear Production. Division
.
,
a
t16805 WCR 19%
.
.
'
Platteville,; Colorado' :80651
Fort St. Vrain Nuclear Station-
-P..Tomlinson,sManager, Quality
~ Assurance Division
-(same. address).
,
. Colorado Radiation Control Program. Director
.;
,
Colorado Public. Utilities ~ Commission-
4
F. J. Miraglia,'Jr., NRR
R .t .W'
. . Starostecki, NRR
W.'D.. Lanning
i E. L'.H Jordon, AE0D -
. W.-F. Kane, RI
L'. A. Reyes, RII.
' : C..E.?Norelius, RIII-
D. F.. Kirsch, RV:
.J.LCalvo,'NRR-
.
bec'to-DMB-(IE01)
,
.bcc distrib. by RIV:
.
-
- PS/B-
- RRI
R. D. Martin', RA
"
.
. .
- Project' Engineer,PS/B
- Section Chief (PS/B)'
RPSB-DRSS'
- D.' Weiss', RM/ALF
- MIS System
..*RSTS Operator
'
- K.THeitner, NRR Project Manager
'*RIV File-
- R. Hall'
- D. Notley, NRR1
- C, Nichols, NRR'
- M.
Skow
- R. Ireland
- w/766
j
,c
i
.
>
r
'
,e ,
,
'
l