ML20236F901

From kanterella
Jump to navigation Jump to search
Errata to Amends 203 & 233 to Licenses DPR-71 & DPR-62, Respectively,Correcting Erroneous Inequality Sign Inadvertently Introduced in 961101 Application for ITS Conversion
ML20236F901
Person / Time
Site: Brunswick  
Issue date: 06/29/1998
From:
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20236F904 List:
References
NUDOCS 9807060008
Download: ML20236F901 (2)


Text

_ - _ _ _ _ _ _ - _

Prizary Containment Isolatien Instrumentation

/

3.3.6.1 Table 3.3.6.1 1 (page 3 of 5)

Primary Contairveent Isolation Instrumentation APPLICA8LE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE 3.

HPCI system Isolation (continued) 1.

HPCI Equipment Area 1,2,3 2

F SR 3.3.6.1.5 s 175'F Temperature -High SR 3.3.6.1.6 SR 3.3.6.1.7 4.

Reactor core Isolation Cooling (RCIC) System Isolation a.

RCIC Steam Line 1,2,3 1

F SR 3.3.6.1.1 s 275% rated Flow -High SR 3.3.6.1.2 steam flow SR 3.3.6.1.3 SR 3.3.6.1.6 SR 3.3.6.1.7 b.

RCIC Steam Line 1,2,3 1

F SR 3.3.6.1.6 2 4 seconds F1ou -High Time Detmy SR 3.3.6.1.7 and Relay SR 3.3.6.1.9 5 12 seconds c.

RCIC Steam Supply Line 1,2,3 2

F SR 3.3.6.1.2 1 53 psig Pressure -Low SR 3.3.6.1.4 SR 3.3.6.1.7 d.

RCIC Turbine 1,2,3 2

F SR 3.3.6.1.2 s 6 psig Exhaust Diaphragm SR 3.3.6.1.6 Pressure -Migh SR 3.3.6.1.7 e.

Drywell Pressure-High 1,2,3 1

F SR 3.3.6.1.1 5 1.8 psig SR 3.3.6.1.2 SR 3.3.6.1.3 SR 3.3.6.1.6 SR 3.3.6.1.7 f.

RCIC Steam Line Area 1,2,3 1

F SR 3.3.6.1.5 s 175'F Temperature -High SR 3.3.6.1.6 SR 3.3.6.1.7 3 RCIC Steam Line Tunnet 1,2,3 1

F SR 3.3.6.1.5 s 200*F Anblent SR 3.3.6.1.6 Tasperature -Migh SR 3.3.6.1.7 h.

RCIC Steam Line Tunnet 1,2,3 1

F SR 3.3.6.1.5 s 30 minutes and Area SR 3.3.6.1.6 Temperature -High Time SR 3.3.6.1.7 Delay-I. - RCIC Steam Line itsinet 1,2,3 1

F SR 3.3.6.1.5 s 50*F Differential SR 3.3.6.1.6 Temperature -HIsh SR 3.3.6.1.7 (continued)

Brunswick Unit 1 3.3-56 Amendment No. 203 i

9907060000 990629

~

0 w

l PDR ADOCK 05000324 l

p PDR

Pri'Iary Containment Isolaticn Instrumentation e

3.3.6.1 a

Table L3 6.1 1 (page 3 of 5)

Primary Contaltunent Isolation Instrtamentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTMER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWAgLE FUNCTION CONDITIONS SYflEM ACTION C.1 REQUIREMENTS VALUE 3.

NPCI System Isolation (continued) 1.

NPCI Equipment Area 1,2,3 2

F SR 3.3.6.1.5 s 175'F Temperature --Nish SR 3.3.6.1.6 SR 3.3.6.1.7 4.

Reactor Core Isolation Cooting (RCIC) System Isolation.

a.

RCIC Steam Line 1,2,3 1

F SR 3.3.6.1.1 5 275% rated Flow --Ni gh SR 3.3.6.1.2 steam flow SR 3.3.6.1.3 SR 3.3.6.1.6 SR 3.3.6.1.7 b.

RCIC Steam Line 1,2,3 1

F SR 3.3.6.1.6 t 4 seconds F1ou --Nigh Time DeLsy SR 3.3.6.1.7 and Relay SR 3.3.6.1.9 s 12 seconds c.

RCIC Fteam Supply Line 1,2,3 2

F SR 3.3.6.1.2 t 53 psis Pressure -Low SR 3.3.6.1.4 SR 3.3.6.1.7 d.

RCIC Turbine 1,2,3 2

F SR 3.3.6.1.2 - 5 6 psig l

Exhaust Diaphragm SR 3.3.6.1.6 Pressure ---Nigh SR 3.3.6.1.7 e.

Drywti Pressure-Nigh 1,2,3 1

F SR 3.3.6.1.1 5 1.8 psig SR 3.3.6.1.2 SR 3.3.6.1.3 SR 3.3.6.1.6 SR 3.3.6.1.7 f.

RCIC Steam Line Area 1,2,3 1

F SR 3.3.6.1.5 5 175'F Temperature -Nigh SR 3.3.6.1.6 SR 3.3.6.1.7

s. RCIC Steam line Tunnel 1,2,3 1

F SR 3.3.6.1.5 s 200'F Anblent SR 3.3.6.1.6 i

Temperature -Nigh SR 3.3.6.1.7 1

h.

RCIC Steam Line Tunnel 1,2,3 1

F SR 3.3.6.1.5 5 30 minutes and Area SR 3.3.6.1.6 Temperature-Nigh 7ime SR 3.3.6.1.7 Delay 1.

RCIC Steam Line Tunnet 1,2,3 1

F SR 3.3.6.1.5 s 50'r Differential SR 3.3.6.1.6 Temperature -Migh SR 3.3.6.1.7 (continued) 1 l-Brunswick Unit 2 3.3-56 Amendment No. 233 o

L____.__________.______.______

_. _ _ _. _.,