Advises That Jul 1987 Rev 15 to Plant Emergency Plan Consistent W/Provisions of 10CFR50.47(b) & Requirements of 10CFR50,App E
ML20236F859
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/26/1987
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kingsley O
SYSTEM ENERGY RESOURCES, INC.
References
NUDOCS 8711020321
Download: ML20236F859 (2)


Text

.

1 1

OCT 2 61987 i

T ' System Energy Resources, Inc..

' ATTN: Mr. 0. D.. Kingsley, Jr.

i Vice cresident, Nuclear Operations P.'0. Box 23054 Jackson, MS. 39205

.j Gentlemen:

SUBJECT:

GRAND GULF NUCLEAR STATION EMERGENCY PLAN REVIEW, REVISION 15 DOCKET N0. 50-416 We have completed, our review of. changes incorporated as Revision.15 to your Grand Gulf Emergency L. Plan, dated July 1987.

Our review ^ indicates that the changes appear to ' meet-the planning standards of 10 CFR 50.47(b)_ and the requirements' of Appendix E to 10 CFR 50.

'Please be reminded that 10 CFR 50.54(q) requires that proposed-changes that.

decrease the ' effectiveness of.your Emergency Plan shall not be implemented without Commission approval.

However, changes may be made withoist Commission l

approval if.such changes do not decrease the effectiveness of the. Plan, and the E

Plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and the 5

requirements of appendix E to 10 CFR 50.

If a change is made without approval, you should furnish copies in accordance with 10sCFR 50.54(q).

Also, any :

changes. to the Emergency Plan Implementing Procedures should be.made in accordance.with the requirements of 10 CFR 50, Appendix E,.Section V.

-Should you' have any: questions regarding this letter, please contact Mr. Thomas -R. Decker of our-staff at (404) 331-2559.

Sincerely, owmAt acmn ny l

DOUGLAS M CC!UNS Douglas M. Collins, Chief Emergency Preparedness and Radiological-Protection Branch Division of Radiation Safety and Safeguards cc':

(Seepage 2) l I

Q1020321871026 l--

p ADOCK 05000416

/

PDR

\\0 RAW

i i..'

1,

,4 System Energy!ResourcesnInc.-

2

-cc:

H.' Cloninger, Vice President, Nuclear

. -Engineering and Support

.J.' E.; Cross,1GGNS Site Director 1:. R. Hutchinson,'GGNS General: Manager

-J.'G. Cesare,JDirector, Nuclear Licensing and Safety

R; T.~Lally, Manager of Quality Assurance-Middle. South Services,-Inc.

R.:B._McGehee, Esquire:

9'1 Wise, Carter,LChild, Steen and Caraway N..S. Reynolds, Esquire 3

Bishop Liberman,; Cook,~Purcell

& Reynolds R.:W. Jackson,~ Project-Engineer i

bec: NRCLResident: Inspector Ej

L. Kintner,LNRR, i

Document Control Desk; State of. Mississippi-l I

j

.i

+

'l l'

RIl R11

.RIIk-h h[~

Q.

-AGooden.

TDecYer HDance 10/aA/87 10/p/87.

10/p/87