50-266/301L Mr< C. W.- Faye,-.Vice~ President-
. DUT:21 W
-Nuclear Power Department:
L Wisconsin Electric Power Company
! 231 West Michigan -Street, ~ Room :308 -
1
- Milwaukee, Wisconsin ~ 53201' Dear Mr_.. Fay-d m
J.
SUBJECT:
MISCELLANEOUS AMENDMENTS / SEARCH REQUIREMENTS POINT BEACH ~ NUCLEAR PLANT, UNITS 1 AND 2 (TAC.#65384/65385)
.This.is to' acknowledge: receipt.of the Wisconsin Electric Power Company r
letter.fdatedDecember 11, 1986,.which transmitted al proposed amendment:to j
the Point Beach. Nuclear Plant,. Units 1 and 2,; Physic'al Security. Plan, in-1
- response to'the Miscellaneous Amendments and. Search Requirements;
- Thesubmitted-documenthas'beenreviewedLandWehave-determinedthatadditional information-and revisionsLto the plan are required prior to our ' approval.~
The enclosed comments are based upon pertinent NRC regulationsfand published guidance describing _ methods, acceptable ~to the'NRC staff, for implementing' specific-parts
- of those regulations.
It is requested that you' provide'your response to tihese comments within'30 days from receipt of'this letter; l
- The' reporting a'nd/or: record keeping-requirements contained in'this letter-affect fewer than' ten respondents; therefore, OMB' clearance is not required under P.L.'96-511t Should you'have any' questions concerning the enclosed comments, please contact
~
the reviewer, Robert Skelton, at (301) 492-4533.
Sincerely, S
David H. Wagner, Project Manager Project Directorate III-3 Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
DISTRIBUTION W/ ENCLOSURES:
Physical Security Plan Comments RSGB rf Sec rf RSkelton CBuracker (2)
_'cc w/ enclosure:
Region III PKreutzer See'next page DWagner Docket File 50-266/301 Case File NRC PDR RErickson wo/ enc 1 Local PDR LBush wo/ enc 1 PStarcher L
- SEE PREVIOUS PAGE FOR CONCURRENCE c -0FC : RSGB..
- RSGB j
- RSGB
- RSGB
- PD III-3
- PD III-3 h
...$.$."$....."[!$.$[...[..."I........l..$$.IS."...l-
$[...
' (L............
(
DATE. : /. /87
- / /87
- '/ /87
- / /87
- p/7/87
- P/d/8 3
~~~~
8710300135 871021 PDR ADOCK 05000266 F
PDR Ei
's
. Dock'et Nos. 50-260/301.
d 1
~
- Mr. D/- C. Hintz Manager - Nuclea'r Power Wisconsin Public' Service Corporation
~
P. O. Box 19002-Green Bay, Wisconsin 54307-9002
Dear Mr. Hintz:
1
SUBJECT:
MISCELLAE0USAMENDMENTS/SEARCHREQUIREMENTS POINT BEA H NUCLEAR PLANT, UNITS 1 AND 2 (TAC 65384/65385)
This is to acknowledg receipt of the Wisconsin Publi -Service Corporation letter, dated. December 11, 1986,'which transmitted proposed amenament to-the Point Beach Nuclear Plant, Units 1 and 2, Physi al Security Plan, in responsetotheMiscellaneousAmendmentsandSearMRequirements.
Thesubmitteddocumenthasheenreviewedandwe ave determined that additional information and revisions to\\the plan are req red prior to our approval.
The enclosed comments are based upon pertinent Np regulations and published guidance describing methods, acceptable \\ o the NRC s aff, for implementing specific parts
?
of those regulations.
l It is requested that you provide y ur re ponse to these comments within 30 days from receipt of this letter.
i The repor. ting and/or record keeping j huirements contained in this letter i
affect fewer than ten respondents; herbore,OMBclearanceisnotrequired i
under P.L.96-511.
j Should you have any questions co cerning the enclosed comments, please contact the reviewer, Robert Skelton, a (301) 492-45 j
I Sincerel i
l
)
David H. Wagne Project Manager Project Directo te III-3 l
Division of React r Projects III, IV, V i
and Special Proj ts l
Office of Nuclear Re ctor Regulation
.I
Enclosure:
DISTRIBUTION W/ ENCLOSURES:
Physical Security, Plan Comments RSGB rf Sec rf RSkelton CBuracker.2) cc w/ enclosure:
Region III PKreutzer l
See next page.
DWagner Dockat File
-266/301 Case File NRC PDR RErickson wo/ encl Local PDR LBush wo/ encl PStarcher l
,lN
~
A, OFC :RSGB i T U :RSGB
- RSGB
- RSG 1
- PD III-3
- PD III-3
.....:__...p___,
NAME :RSkeltonmg :CBur[7 g_
c hr
- LBush
- REr on
- PKreutzer
- DWagner i
DATE M/f /8h ~ ![k )8h
" h )/h)8h " ~ )[y')8h T ) )8h" "
)")8h~ ~ !
~ "
l l
f-r.,-
1 Docket Nos.-50-266/301-ENCLOSURE COMMENTS ON PHYSICAL SECURITY PLAN CHANGES
,(MISCELLANEOUS AMENDMENTS AND SEARCH REQUIREMENTS)
POINT BEACH NUCLEAR PLANT, UNITS 1 AND'2 i
i Provide a' schedule'for implementing the amended safeguards requirements within-1 180 days after Commission approval of the proposed security plan.
Reference-10 CFR 73.55.-
]
Stipulate that-in a plant safety emergency, reasonable action may be taken' to suspend any safeguards measures in accordance with 10.CFR 50.54(x) and (y) when this action is-immediately needed to protect the public health.and safety.
Reference 10 CFR 73.55(a) and Generic Letter 87-08 (Q&A #2).
State that vital area access controls will not be dropped for life threatening situations not involving public health and safety.
Reference 10 CFR 50.54(x) and (y) and Generic Letter 87-08 (Q&A #3).
Provide _a commitment that the search requirements will be implemented within~
l 60 days after Commission approval of the proposed revisions.
Reference 10 CFR 73.55(d)(1).
covide a commitment that if security force members leave the protected area
)
to perform official duties subsequent to their initial entry and search, they i
will be searched prior to re-entry into the protected area if they have not I
been under direct observation or accompanied by another member of the security force.
Reference 10 CFR 73.55(d)(1) and Generic Letter 87-08 (Q&A #11).
Provide a commitment to positively control, in accordance with the current approved access lists, all points of personnel and vehicle access, to vital areas.
Reference 10 CFR 73.55(d)(7)(i)(B).
1 Provide a commitment to ensure prompt access to vital equipment to accommodate j
the potential need for rapid ingress or egress of individuals during emergency i
conditions or situations.
Indicate how this prompt access will be ensured l
(e.g., by issuing override keys to appropriate operators and security force members at the start of each shift, or by other acceptable means).
Reference 10 CFR 73.55(d)(7)(ii) and Generic Letter 87-08 (Q&A #6).
4 Revise the commitment in Section 14.2.2.2 defined as annually, to periodically, review physical security and contingency plans and procedures to evaluate their potential impact on plant and personnel safety.
Reference 10 CFR 73.55(d)(7)(ii)(B) and Regulatory Guide 5.65.
Provide a specific commitment that the secondary power supply systems for both the alarm annunciator equipment and non portable communications equipment shall be located within a vital area.
Reference 10 CFR 73.55(e)(1) and Generic I
Letter 87-08 (Q&A #16).
Indicate what specific components of the secondary power supply system will be protected as vital.
Reference 10 CFR 73.55(e)(1) and Generic Letter 87-08 (Q&Af/18).
1 p..
}
l Mr. C. W. Fay Point Beach Nuclear Plant
['
Wisconsin ElectMe Power Company Units 1 and 2 cc:
Mr. Bruce Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge
.i 2300 N Street, N.W.
Washington..DC 20037 Mr. James J. Zach, Manager l
Point Beach Nuclear' Plant l
Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Town Chairman Town of Two Creeks Route-3 Two Rivers,' Wisconsin 54241-l Chairman Public Service Commission 1
of Wisconsin Hills Farms State Office Building Madison,-Wisconsin 53702 i
- Regional Administrator, Region III U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 799 Roosevelt Road j
Glen Ellyn, Illinois 60137 i
Resident Inspector's Office U.S. Nuclear Regulatory Commission
)
6612 Nuclear Road J
Two Rivers, Wisconsir,- 54241 1
1 1
1 l
I 1
l