ML20236E997

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-263/98-07 on 980413-0527.No Violations Noted.Nrc Concerned That Operations Personnel Did Not Document in Control Rept,That Control Room Manometer for Reactor Bldg Dp Was Not Operating Properly
ML20236E997
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 06/25/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wadley M
NORTHERN STATES POWER CO.
Shared Package
ML20236F000 List:
References
50-263-98-07, 50-263-98-7, NUDOCS 9807010329
Download: ML20236E997 (2)


See also: IR 05000263/1998007

Text

_ _ _ _ - _ - _ . ._ .--____-_-.-__._--__-_ - - - - -- - - - -----


- ---

9

  1. p* R80 9'o,

NUCLEAR REGULATORY COMMISSION

0

UNITED STATES

,

[

-

1

REGION lil

5

E

801 WARRENVILLE ROAD

'

LISLE. ILLINOIS 60532-4351

~%* /

June 25, 1998

Mr. M. Wadley

Vice President

Nuclear Generation

Northem States Power Company

414 Nicollet Mall

Minneapolis, MN 55401

SUBJECT:

MONTICELLO INSPECTION REPORT 50-263/98007(DRP)

Dear Mr. Wadley:

On May 27,1998, the NRC completed an inspection at the Monticello reactor facility. The

enclosed report presents the results of that inspection.

_,

,

During the 6-week period covered by this inspection, the conduct of activities at the Monticello

facility was generally characterized by safety-conscious operations, sound engineering practices,

and careful radiological work controls. The reactor startup from the refueling outage was

conducted in a controlled and deliberate manner. The decision to delay the startup because of a

cracked contro; rod drive withdraw line reflected conservative, safety-conscious operation.

No violations were identified during this inspection. However, we are concerned that operations

personnel did not document in a condition report or in the control room log that a control room

manometer for the reactor building differential pressure was not operating properly. A work order

also was not initiated. Although venting the instrument line corrected the problem in the short

term, the root cause, a leak in the test connection, was not determined until the problem recurred

a few days later. Operators accepted the discrepant condition and did not aggressively pursue

,

resolution.

Also, the recombiner system was returned to service without completing a post-maintenance test

on newly installed switches. The system tripped about a week later during a train swapping

evolution because of miswiring of the switches. Although the switches were not safety-related,

this event is of concern since established controls for performing post-maintenance testing and

returning equipment to service were not effective.

i

\\ l

i

\\

-O

,[q' b

9807010329 980625

PDR

ADOCK 05000263

G

PDR

.

.--

__ _-_____-_______ _ ___ _ _ _ _

e

l

.-

M. Wadley

-2-

l

l.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

I

sincerely,

Original signed by M. Dapas for

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No.: 50-263

License No.: DPR-22

Enclosure:

Inspection Report 50-263/98007(DRP)

,

,

cc w/ encl:

Plant Manager, Monticello

State Liaison Officer, State

of Minnesota

' Distribution:

CAC (E-Mail)

Project Mgr., NRR w/enci

C. Paperiello, Rlli w/ encl

,

J. Caldwell, Rlli w/enci

B. Clayton, Rlll w/enct

SRI Monticello w/enci

DRP w/ enc!

TSS w/enci

DRS (2) w/enct

Rlli PRR w/ encl

!

PUBLIC IE-01 w/ encl

Docket File w/enci

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

1

I

i

DOCUMENT NAME: G:\\MONT\\ MON 98007.DRP

.

To receive a copy of this docunwnt, indicate in the boa *C" = Copy without attachment / enclosure *E" = Copy with attachment / enclosure

{

  • N' = No copy

OFFICE

Rill

6 Rlli

E

Ritt

l

,

NAME

MKunowski:ml MK JMcC-B a Af( L GGrant/2:3DM

DATE

06/M/98

06/J5798

'

0625/98

OFFICIAL RECORD COPY

l