|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217L7171999-10-22022 October 1999 Informs That Encl Questions Were Transmitted by Email to PT Vu of Duke Energy Corp,In Preparation for Upcoming Telcon Re 990624 Amend Request ML20216J2171999-09-30030 September 1999 Informs That Encl Questions Were Transmitted by Email on 990930 to M Purser of Duke Energy Corp for Preparation of Upcoming Telcon.Questions Pertain to 990624 Amend Request ML20210L6601999-08-0505 August 1999 Forwards single-page Document Given to G Belisle of Region II by T Clements of Nuclear Control Institute Re Mixed Oxide Fuel ML20196K6231999-07-0101 July 1999 Forwards Draft Safety Evaluation on TR DPC-NE-2009, Duke Power Co Westinghouse Fuel Transition Rept. Rept Was Transmitted to Warren in Order to Prepare for Conference Call ML20195J1181999-06-14014 June 1999 Forwards Documents That Were Transmitted by Fax on 990614 to a Jones-Young Re Issues to Be Discussed in Upcoming Telcon Re DPC Response to GL 98-04 ML20207G3661999-06-0909 June 1999 Reissued Notification with Date Change of 990618 Meeting with DPC in Rockville,Maryland to Discuss Compensatory Actions (Allowed Outage Time) for McGuire Nuclear Station ML20207E7741999-06-0202 June 1999 Notification of 990617 Meeting with Util in Rockville,Md to Discuss Compensatory Actions (AOT) for McGuire Nuclear Station ML20206U4231999-05-18018 May 1999 Notification of 990602 Meeting with Duke Energy Corp,Vepco & Others in Rockville,Md to Discuss Technical,Regulatory & Licensing Issues Related to Proposed Future Use of Mixed Oxide Fuel at Catawba,Mcguire & North Anna Nuclear Stations ML20205H9131999-03-24024 March 1999 Forwards NRC Operator Licensing Exam Repts 50-369/99-301 & 50-370/99-301 (Including Completed & Graded Tests) for Tests Administered on 990125-0205 ML20199B0491999-01-11011 January 1999 Notification of 990127 Meeting with Duke Energy Corp in Rockville,Md to Discuss License Amend for Taking Credit for Soluble Boron & Boraflex ML20195H0421998-11-17017 November 1998 Informs That Encl Questions Were Transmitted by e-mail to Warren of Duke Energy Corp in Preparation for Upcoming Telephone Call.Memo & Enclosure Do Not Convey Formal Request for Info or Represent NRC Staff Position ML20154L0811998-09-23023 September 1998 Notification of 981016 Meeting with Util in Rockville,Md to Discuss Recent Site Performance Major Plant Equipment Upgrades & Operational,Licensing & Regulatory Issues.Meeting Has Been Cancelled ML20153E0781998-09-23023 September 1998 Revised Notification of 981016 Duke Energy Corp in Rockville,Md to Discuss Recent Site Performance,Major Plant Equipment Upgrades & Operational,Licensing & Regulatory Issues.Meeting Revised to Change Date & Room Number ML20151X1931998-09-14014 September 1998 Notification of 981006 Meeting W/Duke Energy Corp in Rockville,Md to Discuss Recent Site Performance,Major Plant Equipment Upgrades & Operational,Licensing & Regulatory Issues ML20249C6451998-06-25025 June 1998 Notification of 980709-10 Meeting W/Duke Energy Corp in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20249B6241998-06-19019 June 1998 Forwards Draft SE Re Relocation of Meteorological Tower for Plant ML20248F1061998-06-0202 June 1998 Notification of 980617 & 18 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20217Q6151998-05-0707 May 1998 Notification of 980518 & 19 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20217M1831998-05-0101 May 1998 Notification of 980514 Meeting W/Util in Rockville,Md to Discuss Plans for Changes to TS Re Following Ice Condenser Issues:Ice Weight Redistribution,Reduction & Block Ice Utilization ML20199A4781998-01-22022 January 1998 Notification of 980204 Meeting W/Util in Rockville,Md to Discuss Staff Recent RAI Re Snubbers ML20198M8931998-01-12012 January 1998 Notification of 980127 Meeting W/Util in Rockville,Md to Discuss Technical Issues Covered by DEC TR in Support of Future Transition from Framatome to Westinghouse Fuel ML20198S8131997-10-30030 October 1997 Notification of 971118 Meeting W/Util to Discuss Specific Aspects of Dual Unit Trip & Licensee Corrective Actions ML20198K1961997-10-16016 October 1997 Notification of 971030 Meeting W/Util in Rockville,Md to Discuss Matters Re Proposed Improved TSs for Catawba & McGuire ML20210M8231997-08-22022 August 1997 Forwards Signed Original of Subject Order Attached for Transmittal to Ofc of Fr for Publication.W/O Encl ML20141B3041997-06-20020 June 1997 Notification of 970709 Meeting W/Util in Huntersville,Nc to Discuss Licensee Revs to 1996 Plant UFSAR & How 1996 Rev Complies w/10CFR50.71 ML20206L5711997-01-16016 January 1997 Discusses Grinell Snubbers for Use in Steam Generator Replacement Project.Snubbers Did Not Meet Purchase Specifications for Environ Conditions ML20129H7401996-08-29029 August 1996 Ack Receipt of 960801 Memo Re Reactor Trip Breaker Problems at Plants.Recommended That AEOD or Appropriate Group within NRR Advise OE Whether Technical Staff Considers That Violations Occurred,Per 10CFR50.73 or 10CFR21 ML20128Q2431996-08-0101 August 1996 Discusses Concerns Raised During 960722 AEOD Program Review Re Reportability of Reactor Trip Breaker Problems at Plants NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20059E0261994-01-0404 January 1994 Notification of 940105 Meeting W/Util in Rockville,Md to Conduct AIT Meeting & Discuss Results of Licensee Investigation of Recent Loss of off-site Power Event at McGuire Plant ML20058J5061993-11-29029 November 1993 Notification of Significant Licensee Meeting W/Util on 931203 to Discuss Licensee Intended EAL Changes for All Three Plants Relative to NUMARC Issues & Implementation of EPA-400 ML20058J4911993-11-24024 November 1993 Notification of Significant Licensee Meeting W/Util on 931206 to Discuss self-assessment of Plant Performance Since 930802-1130 ML20058C9631993-11-19019 November 1993 Notification of 931201 Meeting W/Util in Rockville,Md to Update NRC on Mcguire,Units 1 & 2 & Catawba,Unit 1 Steam Generator Replacement Project ML20057D1651993-09-27027 September 1993 Notification of 930929 Meeting W/B&W in Rockville,Md to Discuss Installation Process Used for B&W Kinetic Sleeves at McGuire Nuclear Station ML20057C5441993-09-23023 September 1993 Notification of 930929 Meeting W/Util in Rockville,Md to Discuss Results of Util Investigation of Unit 1 SG Tube Leaks & Util Actions as a Result of Findings from Investigation ML20056H3141993-08-24024 August 1993 Forwards Safety Evaluation Accepting Critical Aspects of Proposed TS Changes Involving Increasing Min Rswt Boron Concentrations from 2,000 Ppm to 2,275 Ppm & Increasing Min Cla Boron Concentration from 1,900 Ppm to 2,000 Ppm ML20134B2531993-02-11011 February 1993 Responds to 930113 Request for Exceptions to N+1 Policy for Listed Plants.Approved Exceptions W/Stated Conditions Effective for Period of 2 Yrs ML20128G8201993-02-0101 February 1993 Notification of Significant Licensee Meeting W/Util on 930211 to Discuss Enforcment Conference on Safeguards Issues ML20126F2821992-12-24024 December 1992 Forwards Description of Valves Affected by Stroke Testing & Effect of Valves Being Opened or Closed During Testing,W/ Respect to Encl LER 369/90-022-1 Re RHR Sys Being Inoperable ML20128A0361992-11-30030 November 1992 Notification of 921215 Meeting W/Util in Rockville,Md to Discuss Status of Licensees Plans to Implement Pilot Program for Use of Seismic Stops in Lieu of Snubbers at Plant ML20059H7861990-09-10010 September 1990 Forwards Revised Resolution of Plant-Specific Differing Prof Opinion (DPO) Issues Concerning McGuire Tech Specs, in Support of Completion of Dpos,Per Author 891229 Memo.Actions Re Tech Specs Listed ML20055D9791990-07-0505 July 1990 Notification of 900719 Meeting W/Util in Rockville,Md to Discuss Cause,Morphology & Future Plans Re Cracking Tubes at Expansion Transition Zone & at Tube Support Locations in Steam Generators.Agenda Encl ML20246P6001989-09-0505 September 1989 Notification of 890907 Site Visit & Meeting W/Util to Observe Existing Corrosion of Unit 1 Steel Containment Vessel & Discuss Adequacy of Remaining Wall Thickness for Units 1 & 2 ML20246B8381989-08-22022 August 1989 Notification of 890831 Meeting W/Util in Rockville,Md to Discuss Util Findings from Steam Generator Tubes & Plugs Inspected During Present Refueling Outage of Unit 2 from Earlier Related Metallurgical Analyses of Unit 1 Specimens ML20245K3261989-04-26026 April 1989 Notification of 890505 Meeting W/Util in Rockville,Md to Discuss Cause of Unit 890307-08 Tube Rupture,Corrective Actions & Plans for Restart ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20236E2931989-03-15015 March 1989 Discusses Closure of Outstanding Tech Spec Concerns Deriving from R Licciardo Differing Prof Opinion Review of Plant Tech Specs.Requests That Priority Be Given to Final Closure Including Completion of Remaining 45 Specific Items ML20236E2971989-03-15015 March 1989 Discusses Incorporation of Items Into Westinghouse STS Deriving from NRC Confirmation of Generic & multi-plant Action Concerns from R Licciardo Review of Plant Tech Specs ML20206E5691988-11-15015 November 1988 Summarizes 881109 Telcon W/Util Re Control Area Ventilation Sys Mod & Associated Tech Spec Change.Addl Info Requested Stated ML20058N6761988-10-18018 October 1988 Discusses Action Item 5 Assigned in 880406 Memo Related to Diagnostic Evaluation Team Report for Plant on Pump Damage Due to Low Flow Cavitation 1999-09-30
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217L7171999-10-22022 October 1999 Informs That Encl Questions Were Transmitted by Email to PT Vu of Duke Energy Corp,In Preparation for Upcoming Telcon Re 990624 Amend Request ML20216J2171999-09-30030 September 1999 Informs That Encl Questions Were Transmitted by Email on 990930 to M Purser of Duke Energy Corp for Preparation of Upcoming Telcon.Questions Pertain to 990624 Amend Request ML20210L6601999-08-0505 August 1999 Forwards single-page Document Given to G Belisle of Region II by T Clements of Nuclear Control Institute Re Mixed Oxide Fuel ML20196K6231999-07-0101 July 1999 Forwards Draft Safety Evaluation on TR DPC-NE-2009, Duke Power Co Westinghouse Fuel Transition Rept. Rept Was Transmitted to Warren in Order to Prepare for Conference Call ML20195J1181999-06-14014 June 1999 Forwards Documents That Were Transmitted by Fax on 990614 to a Jones-Young Re Issues to Be Discussed in Upcoming Telcon Re DPC Response to GL 98-04 ML20207G3661999-06-0909 June 1999 Reissued Notification with Date Change of 990618 Meeting with DPC in Rockville,Maryland to Discuss Compensatory Actions (Allowed Outage Time) for McGuire Nuclear Station ML20207E7741999-06-0202 June 1999 Notification of 990617 Meeting with Util in Rockville,Md to Discuss Compensatory Actions (AOT) for McGuire Nuclear Station ML20206U4231999-05-18018 May 1999 Notification of 990602 Meeting with Duke Energy Corp,Vepco & Others in Rockville,Md to Discuss Technical,Regulatory & Licensing Issues Related to Proposed Future Use of Mixed Oxide Fuel at Catawba,Mcguire & North Anna Nuclear Stations ML20205H9131999-03-24024 March 1999 Forwards NRC Operator Licensing Exam Repts 50-369/99-301 & 50-370/99-301 (Including Completed & Graded Tests) for Tests Administered on 990125-0205 ML20199B0491999-01-11011 January 1999 Notification of 990127 Meeting with Duke Energy Corp in Rockville,Md to Discuss License Amend for Taking Credit for Soluble Boron & Boraflex ML20195H0421998-11-17017 November 1998 Informs That Encl Questions Were Transmitted by e-mail to Warren of Duke Energy Corp in Preparation for Upcoming Telephone Call.Memo & Enclosure Do Not Convey Formal Request for Info or Represent NRC Staff Position ML20154L0811998-09-23023 September 1998 Notification of 981016 Meeting with Util in Rockville,Md to Discuss Recent Site Performance Major Plant Equipment Upgrades & Operational,Licensing & Regulatory Issues.Meeting Has Been Cancelled ML20153E0781998-09-23023 September 1998 Revised Notification of 981016 Duke Energy Corp in Rockville,Md to Discuss Recent Site Performance,Major Plant Equipment Upgrades & Operational,Licensing & Regulatory Issues.Meeting Revised to Change Date & Room Number ML20151X1931998-09-14014 September 1998 Notification of 981006 Meeting W/Duke Energy Corp in Rockville,Md to Discuss Recent Site Performance,Major Plant Equipment Upgrades & Operational,Licensing & Regulatory Issues ML20249C6451998-06-25025 June 1998 Notification of 980709-10 Meeting W/Duke Energy Corp in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20249B6241998-06-19019 June 1998 Forwards Draft SE Re Relocation of Meteorological Tower for Plant ML20248F1061998-06-0202 June 1998 Notification of 980617 & 18 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20217Q6151998-05-0707 May 1998 Notification of 980518 & 19 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20217M1831998-05-0101 May 1998 Notification of 980514 Meeting W/Util in Rockville,Md to Discuss Plans for Changes to TS Re Following Ice Condenser Issues:Ice Weight Redistribution,Reduction & Block Ice Utilization ML20199A4781998-01-22022 January 1998 Notification of 980204 Meeting W/Util in Rockville,Md to Discuss Staff Recent RAI Re Snubbers ML20198M8931998-01-12012 January 1998 Notification of 980127 Meeting W/Util in Rockville,Md to Discuss Technical Issues Covered by DEC TR in Support of Future Transition from Framatome to Westinghouse Fuel ML20198S8131997-10-30030 October 1997 Notification of 971118 Meeting W/Util to Discuss Specific Aspects of Dual Unit Trip & Licensee Corrective Actions ML20198K1961997-10-16016 October 1997 Notification of 971030 Meeting W/Util in Rockville,Md to Discuss Matters Re Proposed Improved TSs for Catawba & McGuire ML20210M8231997-08-22022 August 1997 Forwards Signed Original of Subject Order Attached for Transmittal to Ofc of Fr for Publication.W/O Encl ML20141B3041997-06-20020 June 1997 Notification of 970709 Meeting W/Util in Huntersville,Nc to Discuss Licensee Revs to 1996 Plant UFSAR & How 1996 Rev Complies w/10CFR50.71 ML20206L5711997-01-16016 January 1997 Discusses Grinell Snubbers for Use in Steam Generator Replacement Project.Snubbers Did Not Meet Purchase Specifications for Environ Conditions ML20129H7401996-08-29029 August 1996 Ack Receipt of 960801 Memo Re Reactor Trip Breaker Problems at Plants.Recommended That AEOD or Appropriate Group within NRR Advise OE Whether Technical Staff Considers That Violations Occurred,Per 10CFR50.73 or 10CFR21 ML20128Q2431996-08-0101 August 1996 Discusses Concerns Raised During 960722 AEOD Program Review Re Reportability of Reactor Trip Breaker Problems at Plants NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20059E0261994-01-0404 January 1994 Notification of 940105 Meeting W/Util in Rockville,Md to Conduct AIT Meeting & Discuss Results of Licensee Investigation of Recent Loss of off-site Power Event at McGuire Plant ML20058J5061993-11-29029 November 1993 Notification of Significant Licensee Meeting W/Util on 931203 to Discuss Licensee Intended EAL Changes for All Three Plants Relative to NUMARC Issues & Implementation of EPA-400 ML20058J4911993-11-24024 November 1993 Notification of Significant Licensee Meeting W/Util on 931206 to Discuss self-assessment of Plant Performance Since 930802-1130 ML20058C9631993-11-19019 November 1993 Notification of 931201 Meeting W/Util in Rockville,Md to Update NRC on Mcguire,Units 1 & 2 & Catawba,Unit 1 Steam Generator Replacement Project ML20057D1651993-09-27027 September 1993 Notification of 930929 Meeting W/B&W in Rockville,Md to Discuss Installation Process Used for B&W Kinetic Sleeves at McGuire Nuclear Station ML20057C5441993-09-23023 September 1993 Notification of 930929 Meeting W/Util in Rockville,Md to Discuss Results of Util Investigation of Unit 1 SG Tube Leaks & Util Actions as a Result of Findings from Investigation ML20056H3141993-08-24024 August 1993 Forwards Safety Evaluation Accepting Critical Aspects of Proposed TS Changes Involving Increasing Min Rswt Boron Concentrations from 2,000 Ppm to 2,275 Ppm & Increasing Min Cla Boron Concentration from 1,900 Ppm to 2,000 Ppm ML20134B2531993-02-11011 February 1993 Responds to 930113 Request for Exceptions to N+1 Policy for Listed Plants.Approved Exceptions W/Stated Conditions Effective for Period of 2 Yrs ML20128G8201993-02-0101 February 1993 Notification of Significant Licensee Meeting W/Util on 930211 to Discuss Enforcment Conference on Safeguards Issues ML20126F2821992-12-24024 December 1992 Forwards Description of Valves Affected by Stroke Testing & Effect of Valves Being Opened or Closed During Testing,W/ Respect to Encl LER 369/90-022-1 Re RHR Sys Being Inoperable ML20128A0361992-11-30030 November 1992 Notification of 921215 Meeting W/Util in Rockville,Md to Discuss Status of Licensees Plans to Implement Pilot Program for Use of Seismic Stops in Lieu of Snubbers at Plant ML20059H7861990-09-10010 September 1990 Forwards Revised Resolution of Plant-Specific Differing Prof Opinion (DPO) Issues Concerning McGuire Tech Specs, in Support of Completion of Dpos,Per Author 891229 Memo.Actions Re Tech Specs Listed ML20055D9791990-07-0505 July 1990 Notification of 900719 Meeting W/Util in Rockville,Md to Discuss Cause,Morphology & Future Plans Re Cracking Tubes at Expansion Transition Zone & at Tube Support Locations in Steam Generators.Agenda Encl ML20246P6001989-09-0505 September 1989 Notification of 890907 Site Visit & Meeting W/Util to Observe Existing Corrosion of Unit 1 Steel Containment Vessel & Discuss Adequacy of Remaining Wall Thickness for Units 1 & 2 ML20246B8381989-08-22022 August 1989 Notification of 890831 Meeting W/Util in Rockville,Md to Discuss Util Findings from Steam Generator Tubes & Plugs Inspected During Present Refueling Outage of Unit 2 from Earlier Related Metallurgical Analyses of Unit 1 Specimens ML20245K3261989-04-26026 April 1989 Notification of 890505 Meeting W/Util in Rockville,Md to Discuss Cause of Unit 890307-08 Tube Rupture,Corrective Actions & Plans for Restart ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20236E2931989-03-15015 March 1989 Discusses Closure of Outstanding Tech Spec Concerns Deriving from R Licciardo Differing Prof Opinion Review of Plant Tech Specs.Requests That Priority Be Given to Final Closure Including Completion of Remaining 45 Specific Items ML20236E2971989-03-15015 March 1989 Discusses Incorporation of Items Into Westinghouse STS Deriving from NRC Confirmation of Generic & multi-plant Action Concerns from R Licciardo Review of Plant Tech Specs ML20206E5691988-11-15015 November 1988 Summarizes 881109 Telcon W/Util Re Control Area Ventilation Sys Mod & Associated Tech Spec Change.Addl Info Requested Stated ML20058N6761988-10-18018 October 1988 Discusses Action Item 5 Assigned in 880406 Memo Related to Diagnostic Evaluation Team Report for Plant on Pump Damage Due to Low Flow Cavitation 1999-09-30
[Table view] |
Text
. . _
l 1
- 'o g UNITED STATES
[ g NUCLEAR REGULATORY COMMISSION 5 E WASHINGTON, D. C. 20555 l
%, ,,. MAR 151989 MEMORANDUM FOR: James H. Sniezek, Deputy Director j Office of Nuclear Reactor Regulation j
,FROM: . RobertB.A.Licciardo,ReactorEngineer(Nuclear) '
Plant Systems Branch Division of Engineering and Systems Technology Formerly: Reactor. Systems Branch Division of Systems Integration
SUBJECT:
CLOSURE OF OUTSTANDING TECHNICAL SPECIFICATION CONCERNS DERIVING FROM R. LICCIARD0's DP0 REVIEW 0F THE MCGUIRE TECHNICAL SPECIFICATIONS ,
During a meeting with the NRR/ Plant Systems Branch in 1988 to discuss Branch and 1 individual concerns, the writer informed you of his concerns for the delayed ;
closure of Technical Specification deficiencies arising from his Differing.
Professional Opinion (DPO) Review of the McGuire Technical Specifications. As a consequence, you directed the writer to forward to the Chief, Technical Specifications Branch (TSB), for implementation, those items of that review which had already been confirmed by NRR for incorporation into the W Standard Technical Specifications (W STS). Enclosure 1 is a copy of the memorandum that forwards these items 70 the TSB for that purpose, to the subject:
Incorporation Of Items Into W STS Deriving From NRC Confirmation Of Generic And Multiplant Actions From R. Licciardo's DP0 Review Of The McGuire Technical Specifications.
Of the original 380 concerns (also contained in Enclosure 1), 220 items were originally selected by the Division of Systems Integration / Reactor Systems )'
Branch (DSI/RSB) for review by the Division of Licensing (DL) and in the enclosed document 90 are finally categorized as Generic, and an additional 12 as Multi Plant Action (a sub-category of Generic). Additionally, 45 Plant Specific items remain for final review, but these are not separately identified in this document at this time. Implementation of your direction will close out the Generic and Multiplant Action Items.
As a result of the NRC open door policy meeting the writer had in 1985.with Dr. Nunzio J. Palladino, then Chairman of the NRC, Dr. Palladino wrote a letter to the U.S. Congress dated May 17, 1985 (Enclosure 2) in which he promised an accelerated closure of all outstanding items of the McGuire DP0 review before the end of 1985 if the writer's concerns were confirmed.
Because of this commitment and the generic lack of licensing basis safety inWestinghouse(W) facilities (includingMcGuireUnits1and2) deriving from the current'open status of these items, I now ask that priority be given to their final closure including completion of the remaining 45 Plant Specific items for each of the McGuire units for which responses have been available from the licensee since June 10,1986(Enclosure 3). Further, because of the O ,
B903240074 DR 890315 i b '.
ADOCK 05000369 PNU f i E--______________-._ __
d James Sniezek ;
writer's manifest detailed experience and maturity of judgement that resulted in the initiation and final substantive confirmation of the issues of this DP0, he offers his services to facilitate the early closure of these items with appropriate management consent.
5LAaW Robert B. A. Licciardo, !
B. Mech. E; B. Comm.
l Professional Nuclear Engineer:
No. NU 001056 (California)
Professional Mechanical Engineer:
No. M015380 (California)
Enclosures:
- 1. Memo from Robert B. A. Licciardo to Edward Butcher, !
dated March 15, 1989. ,
- 2. Letter from Dr. Nunzio J. Palladino (Chairman, NRC) to Hon. E. J. Markey (U.S. House of Representatives), .
dated May 17, 1985. l
- 3. Letter from H. B. Tucker (DPCo) to H. R. Denton, !
dated June 10, 1986.
cc w/ enclosures: !
Chairman Zech l Commissioner Roberts Commissioner Carr ,
Commissioner Rogers :
Commissioner Curtiss q '
SECY OPE OGA CA V. Stello T. E. Murley S. A. Varga G. C. Lainas J. W. Craig R. Licciardo I D. Hood j 1
1
v- ;
James Sniezek )
writer's manifest detailed experience and maturity of judgement that resulted !
in the initiation and final substantive confirmation of the issues of this DPO, j he offers his services to facilitate the early closure of these items with 4 l
appropriate management consent.
O gpnel W W Robert B. A. Licciardo, B. Mech. E; B. Comm. l Professional Nuclear Engineer:
No. NU 001056 (California)
Professional Mechanical Engineer:
No. M015380 (California)
Enclosures:
- 1. Memo from Robert B. A. Licciardo to Edward Butcher, l dated March 15, 1989. I
- 2. Letter from Dr. Nunzio J. Palladino (Chairman, NRC) to Hon. E. J. Markey (U.S. House of Representatives),
dated May 17, 1985.
- 3. Letter from H. B. Tucker (DPCo) to H. R. Denton, dated June 10, 1986.
cc w/ enclosures:
Chairman Zech Commissioner Roberts Commissioner Carr Commissioner Rogers Commissioner Curtiss SECY OPE OGA CA V. Stello T. E. Murley S. A. Varga G. C. Lainas l J. W. Craig l R. Licciardo D. Hood DISTRIBUTION
{.; ~ Docket File PDR l SPLB File RLicciardo/McGuire DP0 Closure File w/ enclosure
,' PDR: McGuire Dockets 50-369/370 SPl : DEST w/ enclosure RLicciardo;cf PDR: McGuire DP0 Closure File 3//5/89 w/ enclosure
_ _ _ _ _ _ _ _ _ . _ _ _ _ . . _ _ _ _ _ _ . _ _ ___.