ML20236D708

From kanterella
Jump to navigation Jump to search
Forwards Clarification of Each Change to Rev 4 to Plant Security Training & Qualification Plan Requiring Addl Info. Example of Physical Testing Form Also Encl.Encls Withheld (Ref 10CFR73.21)
ML20236D708
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 07/24/1987
From: George Thomas
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NYN-87090, NUDOCS 8707310031
Download: ML20236D708 (2)


Text

..

SAFEGilARDSINFORMATION._

r:-

w.

New Hampshire Yankee Division NYN-87090 July 24, 1987 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk

References:

(a) Facility Operating License No. NPF-56 and Construction Permit No. CPPR-136; Docket Nos. 50-443 and 50-444 (b) PSNH Letter (NYN-87012), dated January 30, 1987, "Seabrook Station Security Training and Qualification Plan, Revision 4," G. S. Thomas to USNRC (c) USNRC (Region I) Letter, dated May 28, 1987, T. T. Martin to R. J. Harrison (d)

PSNH Letter (NYN-87083), dated June 25, 1987, j

T. C. Feigenbaum to USNRC Subj ect :

Seabrook Station Security Training and Qualification Plan, Revision 4

]

i Gentlemen:

)

Reference (b) submitted proposed Revision 4 to the Seabrook Station Security Training and Qualification Plan.

Reference (c) forwarded results of the NRC review of Revision 4 to that Plan, and specified that certain portions of the Plan required further revision. These revisions were to be submitted for NRC review within 30 days of receipt of Reference (c). Reference (d) documents discussions between New Hampshire Yankee (NHY) and Mr. W. L. Kushner i

of NRC P.egion I, which granted an extension until July 28, 1987 for response to Reference (c). In accordance with the extension, enclosed for your review is our response to Reference (c). Enclosure 1 provides a clarification for i

each Revision 4_ change requiring additional information. Enclosure 2 includes the appropriate page changes resulting from the clarifications provided in. is an example of our physical testing form.

Upon receipt of your approval, six copies of each of the changed pages will be forwarded for inclusion with your copies of the plan.

-j y.

8707310031 870724 j

DR ADOCK 0500 3

y SAFEGihRDS INFORilATI0h

> gi " @

l P.O. Box 300. Seabrook, NH 03874. Telephone (603) 474-9574 4

SAFECtJARDS INFORMAll0N

  • United States Nuclear Regulatory. Commission July 24', 1987 Attention: Document. Control Desk Page 2 The information in the enclosure is considered Safeguards Information and' as such should be withheld from public disclosure in accordance with 10 CFR 73.21.

This transmittal document does not contain Safeguards Information and, when detached from the enclosure, need not be protected.

If you have any questions regarding this material, please contact Mr. S. J. Ellis at (603) 474-9574,- extension 4015.

Very truly yours, l

1 W

/

eo e S. Thomas

-i Enclosure cc: Regional Administrator Region 1 United States Nuclear Regulatory Commission 631 Park Avenue I

King of Prussia, PA 19406 Mr. Antone C. Cerne NRC Senior Resident Inspector

)

Seabrook Station Seabrook, NH 03874 Mr. W. L. Kushner Region 1

.i United States Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 i

I SAFEXARDS 1FORMATION

__