ML20236D620

From kanterella
Jump to navigation Jump to search
Confirms Enforcement Conference Scheduled for 870804 to Discuss Issues Raised by Vendor Branch Insp,Per 870709 Telcon.Proposed Meeting Agenda Encl
ML20236D620
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/24/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
References
NUDOCS 8707300549
Download: ML20236D620 (2)


Text

7-i A

{

L.k.4 d

JUL24 g7 x

Ala'bama' Power Company ATTN: Mr. R. P. Mcdonald

' Senior Vice President

'P! 0. Bov. 2641-Birmingham, AL 35291-0400

. Gentlemen-

SUBJECT:

CONFIRMATION OF MEETING ARRANGEMENTS

' DOCKET N0. 50-348 AND 50-364 This confirms the telephone.' conversation between yourself and Mr. H. C. Dance of.

.my staff on July 9, 1987-concerning'an enforcement conference to be held in the-LRegion-II.0ffice 'on August 4,1987, at.1:00 p.m.

We requested this meeting to discuss the' issues-raised by the. Vendor Branch inspection at your Farley-facility. A proposed l meeting agenda is enclosed.

Should'you have any questions regarding these. arrangements, we will be pleased

'to discuss.them.-

Sincerely, (Original signed.by M. Ernst for)

J. Nelson Grace:

l Regional Administrator

Enclosure:

Proposed Meeting Agenda

,cc w/ enc 1:

W.:0. Whitt,; Executive Vice President J. D. Woodard, General Manager -

Nuclear Plant W. G =Hairston, III, General Manager -

i Nuclear Snpport i

J. W.LMcGowan, Manager-Safety Audit and Engineering Review

'J.:K. 0sterholtz, Supervisor-Safety li Audit and Engineering Review

.bcc w/ enc 1:.

.NRC Resident-Inspector-i

'E. Reeves,! Project Manager, NRR:

'~

3 Document: Control:Deski~

  • L

- State 1of.; Alabama

]

R RII.

~RII t RII RII RII.,

l

/

q-g g

n L odenos:cdg HDance DVerrelli VBrownlee eyes 1Ernst 07/1L/87-07/ h/87 07/p /87 07/q/87 07/A//87 07B M 7

/

8707300549 B70724

\\

\\k PDR ADDCK 05000348 G

pyg

,g,g-

= _

y n
k l;
y.

[.:

ENCLOSURE I

PROPOSED MEETING AGENDA:

ALABAMA POWER COMPANY.

AUGUST 4, 1987,I I:00 P.M.

N f

.I'.0pening Remarks;

.Jc N., Grace-II. Discussion of Vendor ~ Branch Inspection Issues L. A. Reyes R. P.TMcDonald -

Installation deficiency of one t'ain of

a..

service: water emergency batteries.

r b.

Inadequate corrective actions - six issues.

q c.

' Commercial grade parts installed in safety--

related equipment.

L&

d.

Questionable qualification of circuit breakers

-installedkin' safety-related equipment Le._

Failure to report inoperability of: cracked battery cells and' control room ventilation dampers.

. III. Discussion Attendees IV. Closing Comments l J. N. Grace p

1 J

l i.

f f

n a