Text
..
-
-
s.
y
,
- . w ..
,
,
.aj
i
-
q
,
pg- 91989 :
Inl Reply Refer To:
'
Dockets: 50-313/89-06
.
"i
50-368/89-06-
'
g
,
-<
W
ArkansasiPower &' Light Company.
1
,
' ATTN:--Mr. Gene Campbell ,
4
- Vice President, Nuclear
'
.
1
.
Operations =
s
,
P.O. Box.551
.
'
Little, Rock, Arkansas 72203'
)
<
'
Gentlemen:
'
+
-l
This refers to the inspection conducted by M'r. LJ D.' Gilbert'of this office-
,
during the period February 21-24, 1989,.of. activities authorized by;NRC. .
Operating Licenses DRP-51 and NPF-6 for Arkansas Nuclear One, Units 1 and'2,
I
and to the discussion of our findings with Mr. J. LD.L Vandergrift and other :
1
members of your. staff at the conclusion of the . inspection. . An' additional
l
inspection of materf a1 ' certifications was' conducted during February 27 through'
.*
March 3,1989, in the Region IV office regarding the high pressure injection
-modification activities-
]
.
.
Areas examined during the inspection' included ' modifications to the Unit l'high
l
l.
pressure' injection system and repair..to the. Unit 2 refueling water' tank.
l
Within these areas,-the inspection consisted of selective examination of
l
procedures and representative records, interviews with pe'rsonnel, and'
11
observations by the NRC inspector. The inspection findings-are documented.in
d
the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were'
identified.
l
Two new unresolved items are identified in' paragraph 2 of the enclosed
1
inspection report.
Should you have any questions concerning this, inspection, we wil1~ be pleased to
discuss them with you.
Sincerely,
l
90309
Original Signed By
'
'
e9032 h h
50 % [ '
A B. Bead
,
G
L. J. Callan, Director
Division of Reactor Projects
Enclosure:. (see next page)
- RIV:RI
- C:MQPS
ht
RF
.
LGilbert/cjg
IBarnes
L
M hoan
L4 tad Tbn
,
i
'
/ /89
/ /89
O /89
3/q /89-
l
gf
- Previously concurred
f
v
.c
.
]
.
.
Arkansas-Power & Light Company
-2-
l
Enclosure:
Appendix - NRC Inspection Report
l
w/ Attachment
l:
50-313/89-06
50-368/89-06'
1
cc w/ enclosure:-
Arkansas Nuclear One
ATTN:
J. M. Levine, Executive
Director, Nuclear Operations-
P.O. Box 608
Russellville, Arkansas 72801
l
Arkansas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:-
- RRI-
- R. D. Martin, RA -
- RPB-DRSS
- SectionChief(DRP/A)
Lisa-Shea,RM/ALF_
- RIV File
- DRP
- MIS System
,
I
- RSTS Operator,
- Project Engineer, DRP/A
- DRS *C. Harbuck, NRR Project Manager (MS:
13-D-18)
- C. Poslusny, NRR Project Manager (MS:
13-D-18)
- L. Gilbert
- I.:Barnes
- w/766